How can I Import IO Variables from Excel sheet to IO Module

How can I Import IO Variables from Excel sheet to IO Module. Problem. To Drag and Drop IO_PLC variables from the Various Control Modules to Specific Channel of a IO Module. Pre-Requisite. To List of IO Variables need to be present in Excel Sheet in a Specific format.

carlenek
Download Presentation

How can I Import IO Variables from Excel sheet to IO Module

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. How can I Import IO Variables from Excel sheet to IO Module

  2. Problem • To Drag and Drop IO_PLC variables from the Various Control Modules to Specific Channel of a IO Module.

  3. Pre-Requisite • To List of IO Variables need to be present in Excel Sheet in a Specific format. • Also the corresponding variables should be already present in UAG Project as a Scod Variable of Connection Type IO_PLC or Free Variable of connection type IO_PLC. • Data type of the variable should match with the Data type of the Module. • UAG_ExportMacro.xls is available.

  4. Solution • Use of Export Import Tool obtain a Format for IO Variable in Excel, Modify the Excel file with the required IO List, Save the file to Text format using macro and then Re-import the file in UAG.

  5. Steps to be followed • In UAG add the required IO Modules( 1 for each type like Analog Input/Output, Digital Input/Output etc). • Create the required Control Modules and Free Variables of type IO_PLC. • Export the IO Modules (each type of IO Module) from UAG in the Text format as displayed

  6. Steps to be followed…continued • Filter all the IO_PLC variables in the project.

  7. Steps to be followed…continued

  8. Steps to be followed…continued

  9. Steps to be followed…continued • Open the Attached UAG_ExportMacro.xls Excel file. • From the menu Select Open file, in file type select ALL FILES and select the IO Module Exported text file.

  10. Steps to be followed…continued • Select  Delimited.  Next 

  11. Steps to be followed…continued • Select Tab and Semicolon  Finish.

  12. Steps to be followed…continued • The exported text files opens in Excel as shown below. • Furnish the details in the format displayed below

  13. Steps to be followed…continued • Once the data required are furnished Run the Macro to save this excel file to UAG compatible Text file.

  14. Steps to be followed…continued • Select the Macro UAG_ExportMacro.xls!CMModify and Click RUN.

  15. Steps to be followed…continued • Click Export button  a New window to specify the New Text file Name (without File format ie txt and location). • The file gets saved at the same location of the UAG_ExportMacro.xls

  16. Steps to be followed…continued • Open UAG project in Exclusive mode. Select File Import and browse the modified Text file that need to be imported.  Click Open to start Import.

  17. Steps to be followed…continued • The Import action should result in assigning of the IO_Variable to the IO Channel.