slide1 n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Egypt - CDM Projects Ranking Criteria PowerPoint Presentation
Download Presentation
Egypt - CDM Projects Ranking Criteria

Loading in 2 Seconds...

play fullscreen
1 / 7

Egypt - CDM Projects Ranking Criteria - PowerPoint PPT Presentation


  • 64 Views
  • Uploaded on

Egypt - CDM Projects Ranking Criteria. National Criteria. Economic Benefits. Environmental Benefits. Social Benefits. - Infrastructure - Export Potential - Payback Period - Energy Savings - State of Technology.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Egypt - CDM Projects Ranking Criteria' - cara-cardenas


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2

National Criteria

Economic Benefits

Environmental Benefits

Social Benefits

- Infrastructure

- Export Potential

- Payback Period

- Energy Savings

- State of Technology

Improvement in environmental performance of the CDM project compared to BAU scenario

The employment opportunities generated by the proposed CDM project

investor interest criteria
Investor Interest Criteria
  • High Project Profitability
  • Creating Good International Image
  • Minimum Project Risk
slide4

Table 1: Criteria, Indicators and Their Weight for the Evaluation of Possible CDM Projects

Project Code: Project Name:

+ L= 0, M= 1, H= 2

++ Maximum Subtotal Score = 220

slide5

Table 1: Criteria, Indicators and Their Weight for the Evaluation of Possible CDM Projects (Cont.)

Project Code: Project Name:

+ L= 0, M= 1, H= 2

++ Maximum Subtotal Score = 140

+ L= 0, M= 1, H= 2

++ Maximum Total Score = 360