1 / 13

GREAT Commissioning

GREAT Commissioning. Purpose: giving an outline of the GREAT commissioning along the GREAT ICP the PSR-documentations commissioning needs (to my understanding so far) instrument declared to be airworthy instrument performance testing ICD-checks documentation about instrument tests

Download Presentation

GREAT Commissioning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GREAT Commissioning • Purpose: • giving an outline of the GREAT commissioning along the • GREAT ICP • the PSR-documentations • commissioning needs (to my understanding so far) • instrument declared to be airworthy • instrument performance testing • ICD-checks • documentation about • instrument tests • ICD-checks • observing modes incl. interactions with the observatory • procedures (installation, EMI-test, shipping, …) • instrument handling and maintenance • failure mode analysis to show reliability of the instrument • infrastructure requirements

  2. ICP - Introduction

  3. Manuals and Procedures • GREAT is a PI instrument • all work with or at the GREAT instrument requires GREAT-team involvement • all work at the GREAT receiver system has to be authorized by the GREAT PI or by the GREAT project engineer • all work with the instrument must be performed by trained personnel only. • all personnel authorized to work or supervise work at the GREAT instrument is listed in appendix A to GP 1100 001 • the descriptions within the GREAT documents therefore shall give guidelines to those people only

  4. Applicable documents (1)

  5. Applicable documents (2)

  6. Applicable documents (3)

  7. L#1-channel compliance matrix

  8. Testreport on cryostat hold-time

  9. ICD-checklist (provided by USRA)

  10. Obs-mode descriptions

  11. Aircraft installation procedure

  12. FMECA on GREAT components

  13. Infrastructure requirements

More Related