lean overview n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Lean Overview PowerPoint Presentation
Download Presentation
Lean Overview

Loading in 2 Seconds...

play fullscreen
1 / 17

Lean Overview - PowerPoint PPT Presentation


  • 76 Views
  • Uploaded on

Lean Overview. What Is Waste?. Waste is “anything other than the minimum amount of equipment, materials, parts, space, and worker’s time which are absolutely essential to add value to the product.” —Shoichiro Toyoda President, Toyota. Lean = Eliminating the 8 Wastes.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Lean Overview' - calum


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
what is waste
What Is Waste?

Waste is “anything other than the minimumamount ofequipment, materials,parts, space,and worker’s time which are absolutely essential toadd valueto the product.”

—Shoichiro Toyoda President, Toyota

slide3

Lean = Eliminating the 8 Wastes

Typically 95% of Total Lead Time is

Non-Value Added!!!

RUN

TIME

Order Processing, Transport, Storage, Waiting, Rework,

Machine Setup, Inspection, Machine Breakdowns, etc...

TOTAL LEAD TIME

LEAN FOCUS:

Reducing Total True Lead Time

lean eliminating the 8 wastes
Lean = Eliminating the 8 Wastes
  • Defects
  • Overproduction
  • Waiting
  • Non Value-added Processing
  • Transportation of Part/Materials/Tooling
  • Inventory in Excess
  • Motion in Excess
  • Employees that are underutilized
slide13
Strategic Lean Focus: “Find Whole New Ways of Completing a Job with a Focus on Reducing Total True Lead Time (MCT)”
the effect of batch sizes
The Effect of Batch Sizes

Large batch sizes increase the lead time of all the products behind it.

Smaller Batch sizes:

- Increase flexibility

- Reduce overall lead times

- Reduces waste and cost caused by extended lead times

lean building blocks
Lean Building Blocks

Continuous Improvement

Pull/Kanban

Cellular/Flow

TPM

Quality at Source

POUS

Quick Changeover

Standardized Work

Batch Reduction

Teams

Value

Stream

Mapping

5S System

Visual

Plant Layout