Interconnectors and RES

Interconnectors and RES. Arnis Staltmanis AS AUGSTSPRIEGUMA TIKLS Board member. 04 .0 7 .2013 | www.ast.lv. Content. EU Strategy The developments of generation capacity in Baltic States RES long term challenges The projects in Baltic States towards 2050. 10.05.2013 | www.ast.lv.

cale
Download Presentation

Interconnectors and RES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interconnectorsand RES ArnisStaltmanis AS AUGSTSPRIEGUMA TIKLS Board member 04.07.2013 | www.ast.lv

  2. Content • EU Strategy • ThedevelopmentsofgenerationcapacityinBalticStates • RES longtermchallenges • TheprojectsinBalticStatestowards 2050 10.05.2013 | www.ast.lv

  3. EU milestones towards 2050 Electricity Highways 2050 • Large and intermittent wind volumes in the northern Seas. • Large-scale solar in southern Europe and possibly in northern Africa. • The Middle East along with the developments in storing and consuming electricity and in decentralized models of electricity generation. Towards carbon-neutral technologies in the future energy mix 10.05.2013 | www.ast.lv

  4. DriversofPowerSystemEvolution • Securityofsupply • Renewableenergyintegration • InternalMarketintegration 10.05.2013 | www.ast.lv

  5. Bulkpowerflowsrelated to generationconnection 10.05.2013 | www.ast.lv

  6. ThedevelopmentsofgenerationcapacityinBalticStates 10.05.2013 | www.ast.lv

  7. TheavailablecapacityinBalticStates Thereliableavailablecapacityisshownwithoutmarketrules. 10.05.2013 | www.ast.lv

  8. Thedevelopmentsof RES inBalticStates 10.05.2013 | www.ast.lv

  9. TheRES long term challenges • Balancing the unpredictable renewable energy sources (RES) – Wind, Sun and Biomass/Biogas. • High surplus by 2020 expected in the Nordic countries will need to be transmitted to the Continental Europe. • Grid development may not be in time if RES targets are met as scheduled, due to internal grid reinforcement restrictions. • Uncertainties regarding the market development on the EU-Russian border. • Large uncertainty regarding generator investments is a challenge for grid development. • North - South flow direction in all the Baltic Sea countries. • Changing of power balance in Germany is significantin the short term. Wind energy – the most challenging forecasted generation unit in grid operation 10.05.2013 | www.ast.lv

  10. Whererenewableenergyinterconnects 10.05.2013 | www.ast.lv

  11. Performance Expectations at Various Connection Points in the Electric System 10.05.2013 | www.ast.lv

  12. ConcernswithIntegratingRenewables • Penetration • Affected by utilities' existing generation mix regulating capabilities, load characteristics, resource availability, and correlations between system load and resources • Additional systems costs imposed by variability and uncertainty may go up with increasing penetration • Costs are moderate – up to 20-30% Penetration – and depend on balancing authority and market structure • Infrastructure Capacity • Lack of transmission capacity from stranded renewable resource locations • Variable and Uncertain Generation • Solved by • spatial diversity of the resource • flexible conventional generation • grid operations and control areas • limited curtailment for extreme events • load management • sufficient AC interconnectioncapacity • and at high penetrations possibly storage TechnicalConcerns Realbutsolvable 2012.09 | www.ast.lv

  13. RES Interconnection – TechnicalConcerns Wind and Large Solar (Bulk System Connected Generation) • Steady state and transient stability analysis • Load/Generation Coincidence (Peak Load and Variability of Source) • Regulation Requirements • Integration with Automatic Generation Control (AGC) • Incorporation of renewable resource forecasting • Examine current operating practice and new concepts to enable high penetration; • frequency responsive (create regulating reserves) • demand side coordination Most technical concerns at the bulk level have been solved with modern wind turbines and grid codes 2012.09 | www.ast.lv

  14. RES Interconnection – TechnicalConcerns Distributed Solar and Small Wind (Distributed Generation) • Issues listed above, plus • Voltage and VAR Regulation • Power Quality (Harmonics, Flicker, DC Injection) • Unintentional Islanding • Protection design and coordination (short circuit, recloser, etc.) • Equipment grounding • Load and generation imbalance • Generation interaction with controllable loads (DSM) • Storage and storage controls Technical concerns at the distribution level have been identified, but small REShave not been fully integrated into planning and operations 2012.09 | www.ast.lv

  15. Solutions to Variable and Uncertain Generation Winddiversity • Spatial diversity of the resource • Flexible conventional generation • Sufficient AC interconnectioncapacity • Grid operations and control areas • Load management • Limited curtailment for extreme events • And at high penetrations possibly storage 2012.09 | www.ast.lv

  16. Energy Storage to Address RESGeneration • Costs of More Wind Than Forecasted: • ValueofDay-Aheadcontractsnotrealised • Day-AheadNominatedGasnotused • Power Plant Cycling • Exportson AC interconnections • Costs of Less Wind Than Forecasted: • Spot market electric purchases • Greater “wear & tear” costs due to more starts/stops than assumed in Retail rate design • Potential depletion of gas system pressure due to higher than expected starts/usage • Power Plant Cycling • Imports on AC interconnections 10.05.2013 | www.ast.lv

  17. Historical and Current Integration Activities Regarding Large Wind Integration Studies • A large amount of research has looked into the technical concerns regarding integration of wind farms into the electrical grid. • Several studies have examined 20-30% penetration • For large, diverse electric balancing areas, existing regulation and load following resources and/or markets are adequate and associated costs are low 2012.09 | www.ast.lv

  18. Historical and Current Integration Activities Regarding Large Wind Integration Studies • Moderate cost increases may be needed to account for variability and uncertainty of wind resource (3-4% low to 7-10% high) • Largely dependent on local utility market design and resource constraints • State of the art forecasting can reduce costs • majority of the value can be obtained with current state-of-the-art forecasting • additional incremental returns from increasingly accurate forecasts • Realistic studies are data intensive and require sophisticated modeling of wind resource and power system operations 2012.09 | www.ast.lv

  19. Needs for Distributed Renewables • Distributed renewable interconnection technologies with advanced functionality • Integration of renewable energy with dispatchable load and storage • Electric power systems technologies, controls, and operations that enable high penetration of distributed renewable energy systems • Models for renewable energy systems that allow them to be included in the planning and analysis tools 2012.09 | www.ast.lv

  20. TheLongtermchallengesfortransmissiongrid The main objectives are: 1. increase of the security of supply; 2. increase of the competition in liberal electricity market; 3. development of the robust and reliable transmission system; 4. Baltic States integration in European power system; 5. RES integration. • External interconnectors: • NordBalt –2016; • Estlink2 – 2014; • LitPol link – 2015. • Internal reinforcements in 2020 (LV, LT un EE): • EE-LV 3rd interconnection – 2020; • Kurzemes ring, LV – 2018; • Panevezis-Musa-Klaipeda, LT – 2018; • Harku-Sindi-Tartu, EE – 2018. 10.05.2013 | www.ast.lv

  21. Interconnectorsplaycruicialroleinorder to meet EU RES targets • Inorder to havemaximumbenefitfrominterconnectors: • forectastingmethodshas to beimproved; • opportunitiesgivenbysmartgridshas to befullyutilzed; • newwaysofeffiecientenergystoragehas to bedeveloped Conclusions 10.05.2013 | www.ast.lv

  22. LatvianTransmissionSystem OperatorAS AUGSTSPRIEGUMA TĪKLS Dārzciema iela 86, Rīga, LV-1073T: (+371) 67728353F: (+371) 67728858ast@ast.lvwww.ast.lv Thankyouforattention