Scr770 revision to outage scheduler entry for maintenance outage level designation
Download
1 / 4

SCR770 Revision to Outage Scheduler Entry for Maintenance Outage Level Designation - PowerPoint PPT Presentation


  • 206 Views
  • Uploaded on

SCR770 Revision to Outage Scheduler Entry for Maintenance Outage Level Designation. Woody Rickerson. SCR770 Revision to Outage Scheduler Entry for Maintenance Outage Level Designation. Current Process:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'SCR770 Revision to Outage Scheduler Entry for Maintenance Outage Level Designation' - caitlyn-kinnerk


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Scr770 revision to outage scheduler entry for maintenance outage level designation

SCR770 Revision to Outage Scheduler Entry for Maintenance Outage Level Designation

Woody Rickerson

QMWG


Scr770 revision to outage scheduler entry for maintenance outage level designation1
SCR770 Revision to Outage Scheduler Entry for Maintenance Outage Level Designation

  • Current Process:

    • Outage Scheduler system automatically determines the level for each Maintenance outage based on the date the outage request is submitted and the Planned Start of the outage:

      • Maintenance Level 1 – The Planned Start is less than 24 hours from the outage request submission

      • Maintenance Level 2 – The Planned Start is greater than 25 hours and less than 7 days from the outage request

      • Maintenance Level 3 – The Planned Start is greater than 8 days and less than 30 days from the outage request

QMWG


Scr770 revision to outage scheduler entry for maintenance outage level designation2
SCR770 Revision to Outage Scheduler Entry for Maintenance Outage Level Designation

  • New Process:

    • This System Change will require MPs to enter the requested Planned Start date and the appropriate Outage Type for each Maintenance Outage.

QMWG


Scr770 revision to outage scheduler entry for maintenance outage level designation3
SCR770 Revision to Outage Scheduler Entry for Maintenance Outage Level Designation

  • Project to Implement Changes:

    • ERCOT is starting the project now

    • Requirements will be shared with MPs

    • ERCOT is working on Design

    • Schedule will be shared when it is known so that MPs can line up Development and Testing resources for any changes they may need to make

      • ERCOT intends to complete Development and Testing and then allow a window of time for MPs to test in MOTE before go-live