1 / 9

Highlights from tracker test at INFN-Perugia

Highlights from tracker test at INFN-Perugia . Claudia Cecchi. Pasquale Lubrano Monica Pepe – Gino Tosti Stefano Germani – Lars Fuhrmann Antonino Cucchiara Sara Cutini – Dario Gasparrini Gianluca Scolieri. Hardware activities at INFN Perugia. -Hardware activities performed in

cais
Download Presentation

Highlights from tracker test at INFN-Perugia

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Highlights from tracker test at INFN-Perugia Claudia Cecchi Pasquale Lubrano Monica Pepe – Gino Tosti Stefano Germani – Lars Fuhrmann Antonino Cucchiara Sara Cutini – Dario Gasparrini Gianluca Scolieri Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA

  2. Hardware activities at INFN Perugia • -Hardware activities performed in • Terni laboratories (SERMS) andG&A • wafers • Electrical testsladders • trays • Thermal tests trays • Stack tests whole tower in parallel Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA

  3. Perugia Hardware Group (past and present...future??) M. Fiorucci A. Tramacere S. Ciprini F.Marcucci N. Marchili Gino Gianluca Pasquale Claudia Monica Stefano Dario Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA

  4. Silicon wafers electrical test Performed at Terni laboratories Test station installed on October 2002 with the help of Andrea Papi • 3632 sensors tested • from 18/11/02 to 24/05/04 During installation Gianluca had great ideas for lunch time (Grottino del Nera)....but problems always came up around noon!!! We had to wait for the stack to test Terni gastronomy... Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA

  5. Ladders electrical test Performed at G&A Francesco Belli introduced us to this funny activity!!! It was November 2002 ..... • about 600 ladders tested • from 12/11/02 to 23/12/04 2 broken..... Hotel La Nuova Fattoria Our home for long time.... Note the snow!! Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA

  6. Trays electrical tests We went to Pisa to learn We went to Pisa to be trained on 19 October 2004 ...And we learned... • About 250 trays tested • from 16/11/04 to 16/09/05 Performed at G&A Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA

  7. Trays thermal tests Performed at Terni laboratories • About 250 trays cycled • (33 cycles each lasting 34 hours • from -15° to 45° ) • from 23/12/04 to 18/09/05 Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA

  8. Stack tests Performed at Terni laboratories • 13 towers have been tested • from 31/01/05 to 17/08/05 And finally the day of the training we succeded to go to lunch in Valnerina all together Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA

  9. Conclusions INFN Perugia tested: Tracker: Restaurants: 35% of the sensors 7 in Carsoli/L’Aquila 20% of the ladders 4 in Valnerina 75% of the trays 5 in Terni 75% of the towers (stack)(for further info contact PG people) Workshop Castelfalfi 09/23/2005 C.Cecchi – INFN PERUGIA

More Related