North Dakota Gas Pipeline Safety Program

North Dakota Gas Pipeline Safety Program. 2011 Summary. State Program General. Number of operators 2011 year end total 9 # of additions since 2010 2 # of deletions since 2010 0 # of inspection units 2011 13 Number of inspectors 2011 year end total 1

cain-gibson
Download Presentation

North Dakota Gas Pipeline Safety Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. North Dakota Gas Pipeline Safety Program 2011 Summary

  2. State Program General • Number of operators • 2011 year end total 9 • # of additions since 2010 2 • # of deletions since 2010 0 • # of inspection units 2011 13 • Number of inspectors • 2011 year end total 1 • Change from year end 2010 0

  3. Program Operational Overview • 1 Inspector/Program Manager: Bob Bachmeier 94 % inspector, 4 % Program Manager, and 2% Damage Prevention • Division Director: Patrick Fahn 13% supervisory • 85 inspection days per year required, 106 in 2011 • Completed regulation record review for each operator unit • Completed OQ field inspection on each operator unit and districts

  4. Covered Operators (9) Transmission • Aux Sable Midstream • Dakota Gasification Co. • Hiland Partners • Oneok Rockies Midstream, LLC • Whiting Oil & Gas Municipals • City of Granville Private Distribution • Montana-Dakota Utilities Co. • Xcel Energy (NSP) • Great Plains Natural Gas Co.

  5. 2010 Year End Gas Statistics for North Dakota • Gas transmission mileage 241 • Gas distribution mileage 2,992 • Number of gas services 145,794

  6. ND Gas Distribution and Gas Transmission Federal Reportable Incident Summary for 2011

  7. Enforcement Statistics 2011

  8. Major Construction Activity • Expansion activity in distribution systems • New gas transmission lines related to gas and oil activity in western North Dakota

  9. Waivers Requested / Granted • MDU requested and was granted a wavier of 49 CFR Part 192.285(c), relating to the requirements for a person making plastic pipe joints

  10. Damage Prevention Program • Damage Prevention Program started in 2009 • Third party pipeline damage complaints filed: 1 in 2009, 0 in 2010, 1 in 2011, 5 so far in 2012 • Other third party damage complaints filed: 2 electric in 2010, 1 electric in 2011, 1 telecommunications so far in 2012 • The consent order in one of the pipeline damage complaints included the Commission’s maximum $5,000 penalty. Consent orders in other damage complaints have been $500 (no damage involved) and $1,000 (some damage involved).

  11. 2012 Outlook • Hire a new Gas Pipeline Safety Inspector/Program Manager • Host 2012 Pipeline Safety Operator Training Seminar • Inspector Training • TQ training for new inspector