The industry Multi-annual Road Map and longer term strategy for more energy efficient buildings in Europe. Stefano Carosio D’Appolonia S.p.A. EeB PPP AIAG Co-ordinator. Where is the built environment sector?. Buildings use 40 % of total EU energy consumption

caia
Download Presentation

Stefano Carosio D’Appolonia S.p.A. EeB PPP AIAG Co-ordinator

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The industry Multi-annual Road Map and longer term strategy for more energy efficient buildings in Europe Stefano Carosio D’Appolonia S.p.A. EeB PPP AIAG Co-ordinator

  2. Where is the built environment sector? • Buildings use 40 % of total EU energy consumption • The built environment generates 1/3 of GHG in Europe • Even new buildings are far from being all energy efficient • Replacement rate is very small (1 to 2 % per year) • The renovation of the existing stock is a real challenge • Many experiments are made but actual impacts are limited • Business as usual is not an option!

  3. Industry mobilisation and engagement … • Within the framework of ECTP, E2BA was established to engage into a long term partnership with EC, aiming at: • Seeking and demonstrating industry engagement • Coordinating research interests towards Public stakeholders • Keeping close links with international initiatives • Liaising with national/regional initiatives

  4. … in the full innovation chain • Over 140 membershave joined the Association.

  5. The industry vision and long term strategy (1/4)

  6. R&D challenge R&D challenge R&D challenge R&D challenge R&D challenge R&D challenge R&D challenge R&D challenge Enabling Technologies (e.g. ICT, multifunctional materials, novel processes, …) The industry vision and long term strategy (2/4) Time horizon Beyond 2013 2010-13 Mobilisation of the entire value and innovation chains

  7. Project Project Project The industry vision and long term strategy (3/4) Project Concepts/ opportunities

  8. EeB PPP 2010-13 The industry vision and long term strategy (4/4) EeB PPP as first wave of a Long Term Strategy i.e. Retrofitting and reduction of energy use i.e. Energy neutral buildings/districts i.e. Energy positive buildings/districts

  9. Mailshot of the Roadmap after July 13th to: European Technology Platforms National Technology Platforms National Contacts Points National Liaison Points Programme Committee Members …………………… Public presentations Mobilised inputs/comments from outside E2BA 1st DRAFT + preliminary indications on priority areas SUSCHEM Materials Technology Group NANOCEM EARTO French NMP Programme Committee Danish Liaison Point Lithuanian Builders Association Italian Technology Construction Platform Swedish Energy Agency Technology Strategy Board – United Kingdom FP7 Energy National Contact Point – Turkey Dutch National Liaison Point Union Sociale de l’Habitat (USH) – France Water Supply and Sanitation Technology Platform Eracobuild Eranet ……….. The roadmapping process Analysis of ETPs/JTIs SRAs/SET Plan Roadmaps (SETIS) … + over 200 contributions from E2BA members highlighting research challenges and opportunities

  10. Updated Draft following 1st consultation Identification of Priorities 1st DRAFT + preliminary indications on priority areas The roadmapping process • Actions carried out to prepare an Updated Draft of the document: • Implementation of comments/feedbacks received during the 1st consultation • Identification of priorities by AIAG

  11. Final version following 2nd consultation Integration of all inputs received from broader stakeholders community The roadmapping process • Actions carried out in order to • finalise the Roadmap document: • 2nd Public Consultation, updated Draft publicly available for comments to the stakeholders community on E2BA website • Participation to a high number of workshops, events and conferences to gather inputs outside E2BA • Implementation of comments/feedbacks received from broader stakeholders community, including relevant ETPs

  12. Overall timing April 13th 2010 Nov 30th 2009 Sept 30th 2009 July 13th 2009 Nov 9th 2009 April 2009 1st Draft development 2nd Draft development Finalisation of the Roadmap 2nd Public Consultation 1st Public Consultation

  13. Final version of the Roadmap

  14. Final version of the Roadmap

  15. Research priorities Energy and equipment for energy use for existing buildings Envelope for existing buildings Systemic approach for existing buildings Interaction (integration) Between buildings, grid, heat networks, …

  16. Dynamic plan/Living document Multiannual Roadmap

  17. Acknowledgements In close cooperation with the EC interservice Group under the coordination of the NMP Theme