1 / 5

P32R 大连移管说明

P32R 大连移管说明. P32R 大连移管试作大日程说明 ----(SCM ). 编制:赵俊宾. 时间: 2014/5/6. 1. 4. /. 1. 2 月. 3 月. 4 月. 5 月. 6 月. 7 月. 8 月. 9 月. 10 月. 11 月. 12 月. 1. 5. /. 1. 2 月. 月. 月. 23. 2. P. 32R. PT. ST. 先行生. 产. (10/. 1. 1 日 ). 8/4 日. 8/25 日. SOP(10/. 8 日 ). 1.

Download Presentation

P32R 大连移管说明

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P32R 大连移管说明 P32R 大连移管试作大日程说明 ----(SCM) 编制:赵俊宾 时间:2014/5/6

  2. 1 4 / 1 2月 3月 4月 5月 6月 7月 8月 9月 10月 11月 12月 1 5 / 1 2月 月 月 23 2 P 32R PT ST 先行生 产 (10/ 1 1日) 8/4日 8/25日 SOP(10/ 8日) 1 P32R 大连移管说明 一、P32R移管试作大日程 1, ST试作2台。 2,PT试作23台。 3,习熟车3台。 4,治具调焊接件:25台

  3. P32R 大连移管说明 二、试作部品纳入日程 1、ST试作部品从ZZ-CATS发订单,单独订货,采用正式包装交货 (大件按用量订货,小件按SNP订货)。 2,习熟部品从ZZ-CATS订货,临时包装交货 。 2,PT试作部品从ZZ-CATS发订单订货,走正式物流路线,采用正式包装(按SNP订货,小件用ST剩余件,不订货)

  4. P32R 大连移管说明 三、设通采用业务流程 1, 设通采用调查同现有郑州工厂调查流程相同。 2,设通采用调查发出后,需在一周之内回复采用日。 3,收到执行设通后才可以实施设变切换,如第一次回复的采用日因库存原因需调整采用日幅度在二周以上的要在采用前三周及时反馈新采用日。 如果不遵守以上规定轻则扣分,重则罚款. 四、大连移管业务联络窗口

  5. P32R 大连移管说明 以 上! P5

More Related