An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering 10 Chp.6 EnergyEROEI - Nuclear Bruce Mayer, PE Licensed Electrical & Mechanical EngineerBMayer@ChabotCollege.edu

  2. EROEI • Energy Returned On Energy Invested • Energy Invested – in order to: • ACQUIRE energy, it TAKES ENERGY • To PROCESS (Refine) energy, it TAKES ENERGY • TRANSPORT a form of energy, it TAKES ENERGY. • STORE energy, it TAKES ENERGY. • USE energy, it also TAKES ENERGY

  3. EROEI • Energy Returned On Energy Invested • Energy Returned: • After you have taken into account all the energy used in the last slide...how MUCH ENERGY do you have left? • OR How much energy does it actually COST in order to USE a particular form of energy?

  4. EROEI - Analogy • Say that you have $100 that you want to INVEST at a bank. • The bank is offers an account for a year that pays 10% interest. • Check the TOTAL Gain or LOSS From this Investment • What if you didn't have a car so you take the Bus to the Bank. It costs you $4 to catch the bus round-trip to go to the bank and deposit the money. • After a year, you pay another $4 to catch another bus to the bank to withdraw your money and interest. • The math on This investment: • $100 + 10% interest = $110 at the end of the year. • MINUS $4 for the first bus and another $4 for the 2nd bus = $8 total. • Subtracting the $8 from the $110 that leaves a total of $102; • the REAL return on your investment = 2/100 = 2% • Not such a good deal after all

  5. EROEI Graphically BackWork Note: EROI ↔ EROEI • If there is NO Surplus, then Eout/Ein <1, and We have WASTED energy

  6. EROEI – Fuel (Thermal) Energy

  7. EROEI – Electrical Energy • From these Lists We Spot a Couple of Dicey Propositions • Solar Electricity • Corn Ethanol as a fuel

  8. EROEI Life Cycle Analysis Example • Consider the Production of a Wind Turbine with a 20-25yr Operating Life

  9. Wind Turbine Nacelle http://www.vestas.com/en/about-vestas/sustainability/wind-turbines-and-the-environment/life-cycle-assessment-(lca).aspx

  10. Turbine Production Environmental NEGATIVE Impacts Manufacturing of raw materials Production of components The wind turbine’s energy production De-commissioning of the wind turbine Wind Turbine LCA

  11. 3.0 MWe Wind Turbine EROEI • Energy Invested = 4,304 MWh/turbine • Energy Returned = 173,580 MWh/turbine • 7,890,000 kWh/Turbine٠Year • 22 Year Operating Life • The EROEI Calculation: • An EXCELLENT Return!

  12. WindPower DownSide • WindPower is NONDispactchable • Can NOT call it up at any time • Needs Supplemental STORAGE

  13. Energy Sources – Fact & Fancy • Question – Which Energy Source Has These Attractive Aspects • NO HydroCarbon or NOx Emissions • NO GreenHouse Gas Emissions • Very High Energy Density • Easy to Transport Fuel • Plug-Compatible With Existing Electrical Grid • Can Easily Produce Hydrogen During “Off Peak” Hours • Low Energy Inputs to Produce?

  14. Answer → Nuclear (Fission) Power

  15. Energy Sources – Fact & Fancy • Nuclear Fission Limitations • Waste Handling is a Political Issue • Have Technological Solutions • Waste Concentration, and Then Storage in Water-Free, Geologically Stable Salt-Mine Structures • Fear of Accidental Radiation Releases Due to Loss of Coolant Accidents Such as TMI • New Designs are Fail-Safe; LoCA’s can Be Engineered OUT • ByProduction of Nuclear-Weapons Compatible Materials; e.g., Plutonium

  16. Energy Sources – Future • Any of the Previous Techniques Could Benefit from Technology “BreakThrus” • Possible Examples • A BioEngineered Fermentation Enzyme Greatly Reduces Energy Required to Make Ethanol • Nuclear FUSION • Fission: Break a Heavy Atom (Uranium) to Liberate Heat (and Neutrons) • FUSION: Combine Light Hydrogen Atoms to Liberate Heat (and Make Heavier Helium Atoms)

  17. Energy Sources – Future cont • Fusion Produces MUCH LESS Radioactive Material Than Fission Reactors • But it’s NOT Zero • Fuel is “Heavy Water” Isotopes That are in More than Sufficient Supply in Sea Water • Fusion Limitations • An EXTREMELY Difficult Technical Problem; Must Generate Local Temperatures That Approximate those found in STARS • 50 Years of Intense Study Have barely Even Reached the Energy Break-Even Point

  18. Fission & Fusion Nuclear Reactions • Fission → Splitting • Fusion → Joining • Dueterium → H with 1 Neutron (2 nucleons) • Tritium → H with 2 Neutrons (3 nucleons)

  19. Electric Cars? • The USA consumes about 140 BILLION Gallons of Gasoline per year • As discussed by Dr. Mike Carnall in his Ethanol presentation • Lets make an estimate of how much electricity would be needed to replace the amount of gasoline used by on-road vehicles

  20. Electricity Estimate Assumptions • 95% of Gasoline is used in Cars/Trucks • Gasoline heat of combustion = 45 MJ/kg • Gasoline Density = 737 kg/cu-m • Piston Engine Thermal efficiency = 25% • Electricity Transmission Efficiency = 96% • Battery charging efficiency = 80% • Battery discharging efficiency = 80% • Electric Motor efficiency = 90% • 1 cubic meter = 264.2 gallon [US, liquid]

  21. Electricity Estimate • 95% of Gasoline used by Vehicles • 133B gallons to Cu-m

  22. Electricity Estimate • Mass of 503M cu-m • Thermal Energy in 371B kg of Gasoline

  23. Electricity Estimate • Energy delivered to DriveShaft using 25% Engine Efficiency • This is the amount of Mechanical Energy that must be delivered to the DriveShaft by the electric motor that REPLACES the gasoline engine • Now Work BACKwards

  24. Electricity Estimate • Electrical Energy applied to the motor using motor efficiency • Energy stored in Batteries to Power the motor using Battery efficiency • Electrical Energy applied to Battery Charger using charger efficiency

  25. Electricity Estimate • Electrical Energy produced at the PowerPlant using Transmission Efficiency • Thus the ADDITIONAL electric energy that power plants must produce to run vehicles is about 7 550 000 TeraJoules in a year

  26. Electricity Estimate • Convert TeraJoules per year into MegaWatts-Electric (MWe) • And a J/s is a watt, so the MWe equivalent:

  27. Electricity Estimate • Now a BIG nuclear PowerPlant such as Diablo Canyon is rated at about 2000 MWe – Use this to Calc the NEW Power Plants needed run vehicles

  28. Electricity Estimate • Thus to Run our vehicles on Electricity we would need to open a NEW Nuclear PowerPlant EVERY MONTH for TEN YEARS

  29. New Electricity for Cars Compared • The TOTAL generating Capacity in the USA is about 1 070 000 MWe • The Electricity for Cars would add about 25% to the USA total • The Total generating Capacity in the CALIFORNIA is about 56 000 MWe • The Electricity for Cars would require about 4 NEW Californias

  30. Energy Summary • In My Humble Opinion ENERGY PRODUCTION is the SINGLE MOST IMPORTANT Technology Issue Facing Human Kind • A Low-Cost, Low-Environmental-Impact Energy Source GREATLY Facilitates The Solution of All Technical Problems • Food Production • Medical Advances • Water Production • Housing & Shelter

  31. All Done for Today Cool Videos https://lasers.llnl.gov/multimedia/video_gallery/ NationalIgnitionFacility Fusion in LIVERMORE

  32. Electricity Estimate • Engery delivered to DriveShaft using 25% Engine Efficiency • Electrical Energy applied to the motor using motor efficiency

  33. DT Reaction