00:00

RCAF Strategy Development and Implementation Overview

The Centre for Operational Research and Analysis (CORA) conducted a strategic analysis to support the Royal Canadian Air Force (RCAF) in developing a comprehensive strategy after years of lacking one. By aligning various guidance documents and conducting surveys and interviews, a sample RCAF Strategy was proposed. The strategy aims to optimize readiness and capabilities to deliver effective kinetic and non-kinetic effects, with a focus on monitoring progress and effectively reporting to the government.

burdaspar
Download Presentation

RCAF Strategy Development and Implementation Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CENTRE FOR OPERATIONAL RESEARCH AND ANALYSIS Strategy to Plans: Strategic Analysis and Operational Research Support to RCAF’s Way Forward 19 July 2023 Dr. Andrew Billyard Dr. Brad Gladman Mr. Bruce Chapman

  2. Problem Space • RCAF lacked a strategy for at least 16 years • What is the purpose of an institutional strategy • How does it influence other institutional guidance (e.g., plans) and what influences the strategy • RCAF’s tactical focus hampers high-level understanding of what key documents mean and understanding of how they should fall out from each other • A need to establish a way for the RCAF Strategy to shape future RCAF activities without merely being “a necessary read” • No current way to systematically monitor progress within the RCAF to achieving the goals of the Strategy • A disconnect between “strategic” documents and reporting to Government on yearly activities • Fixation on groupings rather than activities

  3. The Essential Context: The Essential Context: Eclectic Guidance to Consider Eclectic Guidance to Consider Future Air Operating Environment Future Security Environment RCAF “Vectors” Defence Policy (SSE and DPU) Future Operating Environment RCAF Annual Planning Guidance & Business Plan RCAF Strategy National Military Strategy RCAF Campaign Plan

  4. The Essential Context: The Essential Context: Establishing Linkages Establishing Linkages Defence Policy (SSE and DPU) Future Operating Environment National Military Strategy Future Security Environment RCAF Strategy RCAF Campaign Plan These are the means through which the strategy is ‘implemented’ RCAF Annual Planning Guidance & Business Plan

  5. RCAF Strategy Development • Embedded DRDC CORA (strategic analysts and operational research scientists) were asked to help with development of the RCAF Strategy • OR&A support included: • Establish the linkage between the guiding documents to understand where the RCAF Strategy resides • Review of allied strategies, outlining strengths and weaknesses • Conduct survey of general officers on their views to the RCAF future • Conduct interviews with key general officers, including Comd RCAF, to help develop the Strategy’s vision • Wrote a sample version of the RCAF Strategy. • Red-teamed Strategy versions A. Billyard and B. Gladman, “Analysis and Recommendations for an Effective Vision Statement for the Royal Canadian Air Force Institutional Strategy”, DRDC-RDDC-2022-L037, February 2022, 19pp. A. Billyard, B. Gladman and B. Chapman, “Analysis to Align Air Operations Planning Group (AOPG) Efforts with the RCAF Commander’s Vision Statement”, DRDC-RDDC-2022-L096, April 2022, 17pp. B. Gladman and A. Billyard, “A Proposed Royal Canadian Air Force (RCAF) Institutional Strategy”, DRDC-RDDC-2022-L145, June 2022, 19pp.

  6. Defence Program Segment Architecture (DPSA) • Mandated means to report yearly spending to the government. • RCAF business planners need to align RCAF activities with these bins 1. Operations 2. Ready Forces 3. Defence Team 4. Future Force Design 5. Procurement of Capabilities 6. Sustainable Bases 7. Internal Services 1.1 OPERATIONS IN CANADA 2.1 STRATEGIC COMMAND AND CONTROL 3.1 RECRUITMENT 4.4 AIR AND SPACE FORCE DEVELOPMENT 5.3 AEROSPACE EQUIPMENT ACQUISITION 6.1 DEFENCE INFRASTRUCTURE PROGRAM MANAGEMENT 6.1.1 ADM(IE) Strategic Coordination, Development and Control 7.1 MANAGEMENT AND OVERSIGHT SERVICES 1.1.1 Security and Sovereignty of Canada Operations 2.1.1 Develop and Maintain Strategic Vision for CAF 3.1.6 Air and Space Attraction 4.4.1 RCAF - Conceive 5.3.1 Aerospace Major Acquisition Projects 7.1.1 Management and Oversight 1.1.1.1 (Service Specific) 2.1.1.1 (Service Specific) 3.1.6.1 (Service Specific) 4.4.1.1 (Service Specific) 5.3.1.1 (Service Specific) 6.1.1.1 (Service Specific) 7.1.1.1 (Service Specific) Reasonable comprehensive grouping for all activities within the RCAF – “Line of Operations”

  7. Strategy Vision Action 1 Action 3 Optimize readiness and air/space capabilities to ensure the ability to deliver kinetic and non-kinetic effects. Outcome 1 Outcome 2 Out. 3 Action 2 Action 4 Action 5 Action 6 Action 25 … Action 5: Out. 4 (Completing the action = achieve outcomes)

  8. Strategy Vision Action 1 Action 2 Action 3 Action 4 Action 5 Action 6 Action 25 … Outcome 1 Out. 4 Outcome 2 Out. 3 (Completing the actions = achieve outcomes) Campaign Plan Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 … After building campaign plan activities from strategy actions, group activities by DPSA themes to establish RCAF LOEs “LOE 1” = “1. Operations” “LOE 2” = “2. Ready Forces.”

  9. Strategy Vision Action 1 Action 2 Action 3 Action 4 Action 5 Action 6 Action 25 … Outcome 1 Out. 4 Outcome 2 Out. 3 (Completing the actions = achieve outcomes) Campaign Plan Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 … After building campaign plan activities from strategy actions, group activities by DPSA themes to establish RCAF LOEs “LOE 1” = “1. Operations” “LOE 2” = “2. Ready Forces.” Activity 3 $ Activity 4 $ Activity 1 $ … … … Year 1 Annual Planning Guidance & Business Plan Activity 1 $ Activity 2 $ Activity 3 $ Activity 4 $ Activity 5 $ Activity 6 $ Year 2 Activity 2 $ Activity 3 $ Activity 6 $ Year 3

  10. % towards achieving vision: 42.80% 62.92% 80.35% 86.47% 90.46% DPSA 1 Cost: DPSA 2 Cost: DPSA 3 Cost: DPSA 4 Cost: DPSA 5 Cost: DPSA 6 Cost: DPSA 7: Cost: 357.00 $ 232.00 $ 343.00 $ 273.00 $ 295.00 $ 603.00 $ 53.00 $ 214.00 $ 209.00 $ 114.00 $ 130.00 $ 437.00 $ 328.00 $ 175.00 $ 341.00 $ 355.00 $ 155.00 $ 236.00 $ 432.00 $ 406.00 $ 199.00 $ 135.00 $ 300.00 $ 226.00 $ 83.00 $ 368.00 $ 695.00 $ 234.00 $ 173.00 $ 103.00 $ 221.00 $ 80.00 $ 214.00 $ 518.00 $ 117.00 $ Business Plan Skeleton Year 3 Year 1 Year 2 Year 4 Year 5 % compeltion % completion RCAF Strategy Objective RCAF Strategy Action Action is % Complete by end of BY Plan Campaign Activity (action ↔ DPSA) Campaign Activity Completed by Which BP Year - 4 - - - - - - 5 - - 4 5 5 - - - - 5 3 5 - 3 5 - - - - - - - - - - 2 - % Cost % compeltion % completion Cost % compeltion % completion Cost Cost % compeltion % completion Cost compeltion completion O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O03 O03 A0101 A0101 A0101 A0102 A0102 A0102 A0102 A0103 A0104 A0104 A0104 A0105 A0105 A0105 A0106 A0106 A0107 A0201 A0201 A0201 A0201 A0202 A0202 A0202 A0202 A0202 A0203 A0203 A0203 A0204 A0205 A0205 A0205 A0206 A0301 A0301 96% a010101 ↔ 7.5.6.1 96% a010102 ↔ 5.2.6.4 96% a010103 ↔ 7.2.4.3.6 92% a010201 ↔ 5.1.6.3.7 92% a010202 ↔ 3.1.5.5.4 92% a010203 ↔ 2.2.5.5 92% a010204 ↔ 4.1.3.3 97% a010301 ↔ 4.5.2.3.7 95% a010401 ↔ 5.2.5.4.2 95% a010402 ↔ 4.2.1.2.1 95% a010403 ↔ 6.5.6.5.2 100% a010501 ↔ 7.5.1.3 100% a010502 ↔ 3.4.3.3 100% a010503 ↔ 6.3.2.5 58% a010601 ↔ 2.3.2 58% a010602 ↔ 1.1.2.4.5 90% a010701 ↔ 4.4.3.4 99% a020101 ↔ 6.4.6.3 99% a020102 ↔ 3.5.3.6 99% a020103 ↔ 6.3.4.5.4 99% a020104 ↔ 1.5.1 93% a020201 ↔ 1.4.1.1.7 93% a020202 ↔ 4.1.6.4.6 93% a020203 ↔ 6.3.3.4 93% a020204 ↔ 1.2.3.2 93% a020205 ↔ 1.2.4.1.3 91% a020301 ↔ 1.1.2.3.5 91% a020302 ↔ 4.2.3 91% a020303 ↔ 6.4.6.5.2 97% a020401 ↔ 5.2.6.3.4 96% a020501 ↔ 3.4.4.5 96% a020502 ↔ 6.1.2.3 96% a020503 ↔ 3.4.2.1 96% a020601 ↔ 6.4.2.3.2 97% a030101 ↔ 2.4.1.3.5 97% a030102 ↔ 5.5.4.3 0% 53% 73% 21% 7% 0% 40% 42% 9% 23% 36% 0% 43% 99% 88% 0% 72% 91% 14% 6% 0% 74% 75% 8% 35% 0% 97% 0% 54% 40% 0% 6% 1% 0% 91% 78% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - 27% 8% 5% 67% 0% 61% 16% 6% 70% 0% 62% 0% 51% 0% 3% 0% 0% 0% 63% 82% 84% 19% 19% 72% 13% 11% 0% 8% 0% 25% 89% 65% 0% 0% 9% 8% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 38 60 89 42 62% 38% 3% 7% 66% 19% 35% 49% 13% 0% 0% 69% 0% 0% 6% 17% 16% 2% 12% 12% 10% 6% 6% 0% 31% 0% 0% 21% 0% 18% 1% 27% 91% 90% 0% 0% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 41 76 50 72 11 84 69 72 53 6% 1% 3% 2% 8% 7% 0% 0% 0% 38% 1% 31% 2% 0% 1% 0% 0% 1% 7% 0% 5% 0% 0% 2% 1% 0% 0% 70% 5% 14% 4% 0% 4% 5% 0% 3% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 73 6 59 97 10 6 0% 0% 10% 0% 0% 7% 4% 0% 8% 26% 0% 0% 4% 1% 1% 0% 2% 2% 4% 0% 1% 0% 0% 18% 4% 71% 1% 0% 17% 0% 0% 0% 0% 1% 0% 4% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - - 93 35 65 49 65 - - - - 10 4 31 29 83 12 74 88 16 2 5 - - - - 45 19 - - - 38 50 90 49 39 - - - - 29 73 69 14 2 - - 65 61 12 - - 32 76 59 26 28 43 90 56 99 68 73 - - - - - - - 90 84 54 7 49 36 63 52 95 47 16 59 14 54 84 1 64 - - - 92 13 77 19 54 8 - - - - - 89 35 39 1 9 100 - 100 - - - - 93 - 96 77 - - - - - 86 - - 41 1 45 6 51 33 42 52 - - 43 17 12 71 83 50 18 46 - 49 38 - - - 39 80 - 42 69 96 40 - - - 51

  11. % towards achieving vision: 42.80% 62.92% 80.35% 86.47% 90.46% % towards achieving vision: 42.80% 62.92% DPSA 1 Cost: DPSA 2 Cost: DPSA 3 Cost: DPSA 4 Cost: DPSA 5 Cost: DPSA 6 Cost: DPSA 7: Cost: 357.00 $ 232.00 $ 343.00 $ 273.00 $ 295.00 $ 603.00 $ 53.00 $ 214.00 $ 209.00 $ 114.00 $ 130.00 $ 437.00 $ 328.00 $ 175.00 $ 341.00 $ 355.00 $ 155.00 $ 236.00 $ 432.00 $ 406.00 $ 199.00 $ 273.00 $ 295.00 $ 603.00 $ 53.00 $ 135.00 $ 300.00 $ 226.00 $ 83.00 $ 368.00 $ 695.00 $ 234.00 $ 173.00 $ 103.00 $ 221.00 $ 80.00 $ 214.00 $ 518.00 $ 117.00 $ DPSA 1 Cost: DPSA 2 Cost: DPSA 3 Cost: DPSA 4 Cost: DPSA 5 Cost: 357.00 $ 232.00 $ 343.00 $ 214.00 $ 209.00 $ 114.00 $ 130.00 $ 437.00 $ 328.00 $ Business Plan Skeleton Year 3 Year 2 DPSA 6 Cost: Year 1 Year 4 Year 5 % compeltion % completion RCAF Strategy Objective RCAF Strategy Action Action is % Complete by end of BY Plan Campaign Activity (action ↔ DPSA) Campaign Activity Completed by Which BP Year - 4 - - - - - - 5 - - 4 5 5 - - - - 5 3 5 - 3 5 - - - - - - - - - - 2 - 99% a020102 ↔ 3.5.3.6 % Cost % compeltion % completion DPSA 7: Cost: Cost % compeltion % completion Cost Cost % compeltion % completion 175.00 $ Cost compeltion completion Year 1 Year 2 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O02 O03 O03 A0101 A0101 A0101 A0102 A0102 A0102 A0102 A0103 A0104 A0104 A0104 A0105 A0105 A0105 A0106 A0106 A0107 A0201 A0201 A0201 A0201 A0202 A0202 A0202 A0202 A0202 A0203 A0203 A0203 A0204 A0205 A0205 A0205 A0206 A0301 A0301 96% a010101 ↔ 7.5.6.1 96% a010102 ↔ 5.2.6.4 96% a010103 ↔ 7.2.4.3.6 92% a010201 ↔ 5.1.6.3.7 92% a010202 ↔ 3.1.5.5.4 92% a010203 ↔ 2.2.5.5 92% a010204 ↔ 4.1.3.3 97% a010301 ↔ 4.5.2.3.7 95% a010401 ↔ 5.2.5.4.2 95% a010402 ↔ 4.2.1.2.1 95% a010403 ↔ 6.5.6.5.2 100% a010501 ↔ 7.5.1.3 100% a010502 ↔ 3.4.3.3 100% a010503 ↔ 6.3.2.5 58% a010601 ↔ 2.3.2 58% a010602 ↔ 1.1.2.4.5 90% a010701 ↔ 4.4.3.4 99% a020101 ↔ 6.4.6.3 99% a020102 ↔ 3.5.3.6 99% a020103 ↔ 6.3.4.5.4 99% a020104 ↔ 1.5.1 93% a020201 ↔ 1.4.1.1.7 93% a020202 ↔ 4.1.6.4.6 93% a020203 ↔ 6.3.3.4 93% a020204 ↔ 1.2.3.2 93% a020205 ↔ 1.2.4.1.3 91% a020301 ↔ 1.1.2.3.5 91% a020302 ↔ 4.2.3 91% a020303 ↔ 6.4.6.5.2 97% a020401 ↔ 5.2.6.3.4 96% a020501 ↔ 3.4.4.5 96% a020502 ↔ 6.1.2.3 96% a020503 ↔ 3.4.2.1 96% a020601 ↔ 6.4.2.3.2 97% a030101 ↔ 2.4.1.3.5 97% a030102 ↔ 5.5.4.3 A0201 0% 53% 73% 21% 7% 0% 40% 42% 9% 23% 36% 0% 43% 99% 88% 0% 72% 91% 14% 6% 0% 74% 75% 8% 35% 0% 97% 0% 54% 40% 0% 6% 1% 0% 91% 78% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - 27% 8% 5% 67% 0% 61% 16% 6% 70% 0% 62% 0% 51% 0% 3% 0% 0% 0% 63% 82% 84% 19% 19% 72% 13% 11% 0% 8% 0% 25% 89% 65% 0% 0% 9% 8% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 38 60 89 42 62% 38% 3% 7% 66% 19% 35% 49% 13% 0% 0% 69% 0% 0% 6% 17% 16% 2% 12% 12% 10% 6% 6% 0% 31% 0% 0% 21% 0% 18% 1% 27% 91% 90% 0% 0% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 41 76 50 72 11 84 69 72 53 6% 1% 3% 2% 8% 7% 0% 0% 0% 38% 1% 31% 2% 0% 1% 0% 0% 1% 7% 0% 5% 0% 0% 2% 1% 0% 0% 70% 5% 14% 4% 0% 4% 5% 0% 3% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 73 6 59 97 10 6 0% 0% 10% 0% 0% 7% 4% 0% 8% 26% 0% 0% 4% 1% 1% 0% 2% 2% 4% 0% 1% 0% 0% 18% 4% 71% 1% 0% 17% 0% 0% 0% 0% 1% 0% 4% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - - 93 35 65 49 RCAF Strategy Objective RCAF Strategy Action Action is % Complete by end of BY Plan Campaign Activity (action ↔ DPSA) Campaign Activity Completed by Which BP Year - 4 - - - - - - 5 - - 4 5 5 - - - - 5 % % Cost % compeltion % completion Cost 65 compeltion completion - - - - 10 4 31 29 83 12 74 88 16 2 5 - - - - 45 19 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O02 O02 A0101 A0101 A0101 A0102 A0102 A0102 A0102 A0103 A0104 A0104 A0104 A0105 A0105 A0105 A0106 A0106 A0107 A0201 96% a010101 ↔ 7.5.6.1 96% a010102 ↔ 5.2.6.4 96% a010103 ↔ 7.2.4.3.6 92% a010201 ↔ 5.1.6.3.7 92% a010202 ↔ 3.1.5.5.4 92% a010203 ↔ 2.2.5.5 92% a010204 ↔ 4.1.3.3 97% a010301 ↔ 4.5.2.3.7 95% a010401 ↔ 5.2.5.4.2 95% a010402 ↔ 4.2.1.2.1 95% a010403 ↔ 6.5.6.5.2 100% a010501 ↔ 7.5.1.3 100% a010502 ↔ 3.4.3.3 100% a010503 ↔ 6.3.2.5 58% a010601 ↔ 2.3.2 58% a010602 ↔ 1.1.2.4.5 90% a010701 ↔ 4.4.3.4 99% a020101 ↔ 6.4.6.3 0% 53% 73% 21% 7% 0% 40% 42% 9% 23% 36% 0% 43% 99% 88% 0% 72% 91% 14% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - 27% 8% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 38 60 89 42 - - - 93 35 65 49 38 50 90 49 5% 67% 0% 61% 16% 6% 70% 0% 62% 0% 51% 0% 3% 0% 0% 0% 63% 39 - - - - 29 73 69 14 2 - - 65 61 12 - - 32 76 59 26 28 43 90 56 99 68 2 5 73 - - - - - - - - - 10 4 31 29 90 84 54 7 49 36 63 52 95 74 88 16 47 16 59 14 54 84 1 64 - - - 92 13 77 19 54 8 - - - - - 39 - 89 35 39 1 9 100 - 100 - - - - 93 - 96 77 - - - - - 73 69 14 - - 2 86 - - 41 1 45 6 51 33 - 42 52 - - 32 43 17 12 71 83 50 18 46 84 54 - - - - - 49 38 - 90 - - 39 80 - 42 69 96 40 - - - 47 51

  12. % towards achieving vision: 42.80% 62.92% DPSA 1 Cost: DPSA 2 Cost: DPSA 3 Cost: DPSA 4 Cost: DPSA 5 Cost: DPSA 6 Cost: DPSA 7: Cost: 357.00 $ 232.00 $ 343.00 $ 273.00 $ 295.00 $ 603.00 $ 53.00 $ 214.00 $ 209.00 $ 114.00 $ 130.00 $ 437.00 $ 328.00 $ 175.00 $ Year 1 Year 2 % Completion by end of BP cycle RCAF Strategy Objective RCAF Strategy Action Action is % Complete by end of BY Plan Campaign Activity (action ↔ DPSA) Campaign Activity Completed by Which BP Year - 4 - - - - - - 5 - - 4 5 5 - - - - 5 % % Cost % compeltion % completion Cost compeltion completion 95% 100% 94% O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O02 O02 A0101 A0101 A0101 A0102 A0102 A0102 A0102 A0103 A0104 A0104 A0104 A0105 A0105 A0105 A0106 A0106 A0107 A0201 A0201 96% a010101 ↔ 7.5.6.1 96% a010102 ↔ 5.2.6.4 96% a010103 ↔ 7.2.4.3.6 92% a010201 ↔ 5.1.6.3.7 92% a010202 ↔ 3.1.5.5.4 92% a010203 ↔ 2.2.5.5 92% a010204 ↔ 4.1.3.3 97% a010301 ↔ 4.5.2.3.7 95% a010401 ↔ 5.2.5.4.2 95% a010402 ↔ 4.2.1.2.1 95% a010403 ↔ 6.5.6.5.2 100% a010501 ↔ 7.5.1.3 100% a010502 ↔ 3.4.3.3 100% a010503 ↔ 6.3.2.5 58% a010601 ↔ 2.3.2 58% a010602 ↔ 1.1.2.4.5 90% a010701 ↔ 4.4.3.4 99% a020101 ↔ 6.4.6.3 99% a020102 ↔ 3.5.3.6 0% 53% 73% 21% 7% 0% 40% 42% 9% 23% 36% 0% 43% 99% 88% 0% 72% 91% 14% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - 27% 8% 5% 67% 0% 61% 16% 6% 70% 0% 62% 0% 51% 0% 3% 0% 0% 0% 63% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 38 60 89 42 93 35 65 49 - - 10 4 31 29 74 88 16 2 5 = Σ() / 7 /4 (7 actions for O01) (4 outcomes for vision) - 39 - - 73 69 14 2 - 32 - - - - 90 84 54 47

  13. % towards achieving vision: 42.80% 62.92% DPSA 1 Cost: DPSA 2 Cost: DPSA 3 Cost: DPSA 4 Cost: DPSA 5 Cost: DPSA 6 Cost: DPSA 7: Cost: 357.00 $ 232.00 $ 343.00 $ 273.00 $ 295.00 $ 603.00 $ 53.00 $ 214.00 $ 209.00 $ 114.00 $ 130.00 $ 437.00 $ 328.00 $ 175.00 $ Year 1 Year 2 RCAF Strategy Objective RCAF Strategy Action Action is % Complete by end of BY Plan Campaign Activity (action ↔ DPSA) Campaign Activity Completed by Which BP Year - 4 - - - - - - 5 - - 4 5 5 - - - - 5 % Cost % compeltion Cost compeltion O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O01 O02 O02 A0101 A0101 A0101 A0102 A0102 A0102 A0102 A0103 A0104 A0104 A0104 A0105 A0105 A0105 A0106 A0106 A0107 A0201 A0201 96% a010101 ↔ 7.5.6.1 96% a010102 ↔ 5.2.6.4 96% a010103 ↔ 7.2.4.3.6 92% a010201 ↔ 5.1.6.3.7 92% a010202 ↔ 3.1.5.5.4 92% a010203 ↔ 2.2.5.5 92% a010204 ↔ 4.1.3.3 97% a010301 ↔ 4.5.2.3.7 95% a010401 ↔ 5.2.5.4.2 95% a010402 ↔ 4.2.1.2.1 95% a010403 ↔ 6.5.6.5.2 100% a010501 ↔ 7.5.1.3 100% a010502 ↔ 3.4.3.3 100% a010503 ↔ 6.3.2.5 58% a010601 ↔ 2.3.2 58% a010602 ↔ 1.1.2.4.5 90% a010701 ↔ 4.4.3.4 99% a020101 ↔ 6.4.6.3 99% a020102 ↔ 3.5.3.6 0% 53% 73% 21% 7% 0% 40% 42% 9% 23% 36% 0% 43% 99% 88% 0% 72% 91% 14% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ - 27% 8% 5% 67% 0% 61% 16% 6% 70% 0% 62% 0% 51% 0% 3% 0% 0% 0% 63% $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 38 60 89 42 93 35 65 49 - - 10 4 31 29 74 88 16 2 5 - 39 - - 73 69 14 2 - 32 - - - - 90 84 54 47

  14. The Advantages of this Method • Begins with the RCAF Strategy as the pivotal document • It naturally links everything the RCAF is currently doing to the Strategy’s vision. • The ‘binning’ using the DPSA allows the RCAF to easily report its yearly activities to the GC’s expectations without the need for additional mapping, as is currently required. • Four measures are used to keep track of RCAF initiatives, how they are achieving the vision and yearly apportionment to budget allocation • Focusing on ‘activities’ from the Strategy’s ‘actions’ ought to be a straightforward exercise, which means large teams are not required although consultation with the RCAF writ large might still occur. Indeed, the DPSA has a long list of subcomponent activities that could be used as the progenitor activities.

  15. Questions? B. Gladman, A. Billyard, and B. Chapman, “Strategy Inspired Campaign Plan”, DRDC-RDDC-2023-L053, March 2023, 15pp.

More Related