An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Check out the bingo sign! CAZENOVIA CR. @ STEPHENSON ST. BRIDGE

  2. REPLACEMENT OF ONE BANK OF A CONCRETE-LINED CHANNELCAZENOVIA CREEK @ STEPHENSON STREET BRIDGESPONSOR: CITY OF BUFFALO, NYCONSTRUCTED OCTOBER 2005 - MARCH 2006

  3. CAZENOVIA CREEK @ STEPHENSON STREET BRIDGE • Urban Urban Urban!! Steep bank slopes-fenced off for public safely, concrete lined channel • Roads on top of both banks within feet of sloped bank of stream • Dense urban single-family dwellings • Floods fairly often due to flow, ice jams, & backwater effects from the Buffalo River • City of Buffalo, NY project • Pool-riffle-pool stream, less than 1% slope

  4. PRE-PROJECT PHOTOSby Lallman RambaliNYSDOT REGION 9WINTER 2003

  5. Ice on US side of Stephenson Street bridge. Pix by Lallman Rambali 2003

  6. From Stephenson St. bridge, looking US Pix by Lallman Rambali 2003

  7. PRE-PROJECT PHOTOSby Dave Derrick FEBRUARY 24, 2005

  8. Looking across stream, left bank in background. Pix by Derrick 2/24/2005

  9. CONSTRUCTION PHOTOSby Jeff Fisk, Project Engineer, OCTOBER 2005

  10. Looking across @ left bank, US end of project. Pix by Jeff Fisk - Oct. 2005

  11. Positioning & driving sheetpile. Note worker Pix by Jeff Fisk - Oct. 2005

  12. CONSTRUCTION PHOTOSby Dave Derrick NOVEMBER 4, 2005

  13. Looking DS. Old sheetpile removed, new installed. Pix by Derrick 11/4/2005

  14. Looking DS. Driving sheetpile toe. Project is 1,000 ft long. Pix by Derrick 11/4/2005

  15. CONSTRUCTION COMPLETEPhotos by Derrick MAY 18, 2006

  16. Looking DS. Toe-sheetpile. Mid-bank-cut stone with willows. Pix by Derrick - 5/18/2006

  17. Looking DS. Trees-fence-shrubs-riprap-stone-sheetpile. Pix by Derrick - 5/18/2006

  18. Looking DS. Opposite bank typical concrete. Pix by Derrick - 5/18/2006

  19. Looking DS. Close-up of soil-choked riprap mid-bank & upper bank shrubs. Note engineered soil-clay-gravel-organic mix for stability & plant growth of shrubs. Pix by Derrick - 5/18/2006

  20. Robust upper bank rooted stock shrubs . Pix by Derrick - 5/18/2006

  21. Gravel-clay-soil-organic mix planting medium. Pix by Derrick - 5/18/2006

  22. Looking DS. Shrubs and top-bank trees. Pix by Derrick - 5/18/2006

  23. 5 MONTHS AFTER PROJECT COMPLETIONPhotos by Derrick AUGUST 23, 2006

  24. Mid & Upper bank vegetation growing well Trees No protection, 2 rows of shrubs Riprap with grasses Square cut stone with willow & dogwood whips Sheetpile Pix by Derrick - 8/23/2006

  25. 22 MONTHS AFTER PROJECT COMPLETIONFEB 3-4, 2008

  26. Looking DS @ left bank. Water level has dropped, ice has collapsed Pix by George Cotroneo - 2/3/2008

  27. WHAT A BIG DIFFERENCE ONE DAY MAKES Feb 5, 2008 (3/4 inch of rain + warm temps=10 ft high stage & ice out) ALSO WHICH BANK DO YOU LIKE, LEFT OR RIGHT??

  28. LEFT BANK –Warm temps + rain + high water = quick ICE OUT. All veg still looking very very good. Pix by Joe Kassler - 2/5/2008

  29. 3 YEARS & 1 MONTH AFTER PROJECT COMPLETIONPhotos by Derrick JUNE 12, 2009

  30. Looking DS @ left bank. Veg looking good!! 3YRS 1 MONTH AFTER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-12-09

  31. Looking DS @ left bank. All veg is robust!! 3YRS 1 MONTH AFTER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-12-09

  32. Looking DS @ left bank. Nice species diversity of plants. 3YRS 1 MONTH AFTER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-12-09

  33. Looking DS @ left bank. Even toe veg is coming on. 3YRS 1 MONTH AFTER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-12-09

  34. Vines & some veg growing amongst large toe stone 3YRS 1 MONTH AFTER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-12-09

  35. Close up of robust mid & upper bank veg. 3YRS 1 MONTH AFTER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-12-09

  36. Top bank tall trees to left & upper bank veg on right. 3YRS 1 MONTH AFTER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-12-09

  37. 4.66 YEARSAFTER PROJECT COMPLETIONPhotos by Derrick JUNE 16, 2010

  38. 4.66 years after completion. From bridge looking DS @ the entire project. All planted material showing robust growth 4.66 YRS LATER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-16-2010

  39. 4.66 years after completion. From the bridge looking DS. Except for narrow band of stone at toe, dense veg has covered the entire bank. 4.66 YRS LATER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-16-2010

  40. 4.66 years after completion. From the bridge looking DS. Good diversity of plant species with some volunteer plants (Cottonwood, Black Locust, herbacious, some invasive Japanese Knotweed). 4.66 YRS LATER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-16-2010

  41. 4.66 years after completion. From bank looking DS. 4.66 YRS LATER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-16-2010

  42. 4.66 years after completion. From the bank looking DS. Willow is growing well in the riprap section. 4.66 YRS LATER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-16-2010

  43. 4.66 years after completion. Looking at top bank & overbank 4.66 YRS LATER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-16-2010

  44. 4.66 years after completion. Looking at top bank. 4.66 YRS LATER-CAZENOVIA CR. @ STEVENSON ST-DERRICK 6-16-2010

  45. 5 YEARSAFTER PROJECT COMPLETIONPhotos by Chuck Godfrey Feb. 18, 2011

  46. 5 YEARS AFTER PROJECT COMPLETION. It’s back-looking DS @ ice pounding project, all plants safe for now!! 5 YRS LATER-CAZ CR. @ STEVENSON ST-CHUCK GODFREY 2-28-2011