1 / 10

WSES Relocation

2018 BOND PROGRAM. WSES Relocation. WALNUT SPRINGS ELEMENTARY: MISSION. 2018 BOND SCHEDULE. WSES-DSMS RELOCATION PROJECT SCHEDULE. Relocate Walnut Springs to a new building on the DSMS campus The new school design will: Accommodate 850 students (approximately 104,000 SF)

bryans
Download Presentation

WSES Relocation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2018 BOND PROGRAM WSES Relocation

  2. WALNUT SPRINGS ELEMENTARY: MISSION

  3. 2018 BOND SCHEDULE

  4. WSES-DSMS RELOCATION PROJECT SCHEDULE

  5. Relocate Walnut Springs to a new building on the DSMS campus The new school design will: • Accommodate 850 students (approximately 104,000 SF) • Connect the middle school building and curriculum as deemed appropriate • Redesign the vehicle parking and traffic flow Extend City sanitary utility & remove existing water treatment facility Renovate Dripping Springs Middle School: • Remove extra classrooms to accommodate new flexible, collaborative spaces • Assessment project recommendations WSES-DSMS RELOCATION: SCOPE

  6. PROJECT ROADMAP

  7. Review the district template for an elementary school Walk the existing school sites Meet with existing teachers and staff at both campuses Review in-depth needs with campus leadership groups Host a follow up visioning meeting with the community Develop the space program DESIGN PROCESS: WHERE WE START

  8. Q&A

  9. THANK YOU

More Related