This document outlines the methodology for calculating construction costs in Rapid City, SD, utilizing the CTC process from June 22-24, 2010. It includes steps to acquire bid tabs from the local Department of Transportation, gather project specifications such as length, roadway width, and surface thickness, and identify the route on a detailed map. The CTC worksheet classifies bid items into four categories and calculates costs for all road classifications. Essential data required includes project location, typical roadway width, pavement thickness, and aggregate base specifications.
E N D
New Cost To Construct Calculation Method Rapid City, SD June 22- 24, 2010
CTC Process • Acquire Bid Tab(s) from local DOT • Acquire the Bid Tab(s) project length, roadway width, & surface thickness • Identify the route on a detailed map • Using the map and the classification worksheet, determine what the BIA class is for the representative bid tab(s) • Enter in the CTC worksheet all the bid items with unit and total costs • Classify each bid item into each of the four CTC categories • The CTC worksheet will then calculate the CTC for all ASC and class of roads • Print out the worksheets and submit the data with bid abstracts and other supporting documents to BIADOT
Minimum Proposed Data Required • Project Bid Abstract • Project Length & Location • Roadway Typical finished width • BIA Classification of road • Project pavement thickness • Aggregate base or gravel surface thickness