Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: ISO/IEC JTC1 SC6 Liaison Report Date Submitted: 20 July 2005 Source: Ho-In Jeon, Dept. EE, Kyung-Won University

brone
Download Presentation

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: ISO/IEC JTC1 SC6 Liaison Report Date Submitted: 20 July 2005 Source: Ho-In Jeon, Dept. EE, Kyung-Won University Address: (461-701) San-65 Bok-Jung-Dong, Soo-Jung-Gu, Sung-Nam-Shi, Kyung-Gi-Do, Korea Voice: 82 – 19 – 9101 - 1394, FAX: 82 – 31 – 753 - 2532, E-Mail: jeon1394@kornet.net Re: [] Abstract: Liaison Report of ISO/IEC JTC1 SC6 to IEEE 802.15 Working Group Purpose: For the purpose of informing the body. Notice: This document has been prepared to assist the IEEE P802.15 members to understand the standardization activities of ISO/IEC JTC1 SC6. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. NOTE: Update all red fields replacing with your information; they are required. This is a manual update in appropriate fields. All Blue fields are informational and are to be deleted. Black stays. After updating delete this box/paragraph. Ho-In Jeon, Kyung-Won University

  2. ISO/IEC JTC1 SC6 Liaison Report July 20, 2005 San Francisco, California Ho-In Jeon, Kyung-Won University

  3. Terms of References of SC6 WGs • WG 1 Terms of Reference : Services and protocols in the OSI Physical and Data Link Layer. • WG 7 Terms of Reference : Network and transport layer services and protocols. • WG 8 Terms of Reference : Directory services and protocols. • WG 9 Terms of Reference : Abstract Syntax Notation One (ASN.1) and Registration. • SC6 is responsible for 284 published International Standards and 57 open project items Ho-In Jeon, Kyung-Won University

  4. Memberships and Liaisons (1/2) • 16 Participating members and 22 Observer members • Internal liaison within ISO/IEC JTC1 • ISO/IEC JTC1/SC 17 • ISO/IEC JTC1/SC 25 • ISO/IEC JTC1/SC 29 • ISO/IEC JTC1/SC 31 • Internal liaison within ISO/TCs and IEC/TCs • ISO TC 215(Health Informatics) Ho-In Jeon, Kyung-Won University

  5. Memberships and Liaisons (2/2) • External-Category A liaison • ITU-T (International Telecommunication Union -Telecommunication Standardization Sector) • ECMA International (European Computer Manufacturer’s Association) • ETSI (European Telecommunication Standards Institute) • IETF (Internet Engineering Task Force) • OASIS (Organization for the Advancement of Structured Information Standards) • External-Category B liaison • SITA (International Society for Airline Telecommunication and Information) • External-Category C liaison • IEEE 802 LMSC (LAN/MAN Standard Committee) • ATM Forum • FR Forum Ho-In Jeon, Kyung-Won University

  6. An Event Happened. • At July 4, 2004, China NB submitted Chinese WAPI (Wireless Authentication and Privacy Infrastructure: Chinese WLAN security standard) to JTC1 as an NP intending Fast Track. • JTC1 issued the JTC1 number as 1N7506 in July 2004. • As soon as JTC1 found that WAPI, as an NP, did not go through SC6, it voided the 1N7506 in August 2004. • China NB claimed the unfair treatment. • SC6 and JTC1 decided to resolve the issue in the Orlando meeting, Nov. 8, 2004 Ho-In Jeon, Kyung-Won University

  7. SC6 Plenary Meeting at Orlando • Held in November 2004 at Orlando. • China NB claimed • Failure to notify China NB and correct the procedure. • Unfair treatment by VISA denial to Chinese security experts • Possible Conspiracy between IEEE and US Government • Suspension of IEEE 802.11i Fast Track • Decided to have Ad Hoc meeting at Frankfurt, Germany to have the technical discussion of WAPI and 802.11i Ho-In Jeon, Kyung-Won University

  8. SC6 WG1 Interim at Frankfurt • 15 security experts from China. • 5 security experts from IEEE 802.11. • JTC1 Chairman • 5 National Bodies • China NB assumed that 1N7506 has been alive since last Orlando meeting. • When they knew that it does not exist, they requested to make 1N7537 suspended indefinitely. • The convener suggested 3 possible options, but not accepted by China NB. Ho-In Jeon, Kyung-Won University

  9. Time-Line for the Standardization Aug. 2004 Aug. 11 2005 June 9 2005 July 2004 Nov. 8 2004 Feb. 21 2005 Mar. 11 2005 Aug. 2004 Aug. 29 2005 SC6 Plenary In France Orlando Meeting: Allowed Discussion of Technical Maturity Submit WAPI as the Fast Track Frankfurt Meeting: No Conclusion Made IEEE 802.11i Letter Ballot Ends IEEE 802.11i Submit as a Fast Track: 1N7537 WAPI Submit as an NP and Got 1N7506 WAPI Letter Ballot Ends 5 Months 1N7506 Voided Ho-In Jeon, Kyung-Won University

  10. Chinese Sue to the SMB and TMB • China NB sued the case to TMB and SMB, the higher hierarchy of JTC1 in the last April. • Results: • ISO decided to hold resolution meeting on May 17 (Tuesday), 2005 at Geneva. • The Geneva meeting was overlapped with IEEE 802.11, 15 Interim meeting at Cairns, Australia. • So, IEEE security experts could not attend. Ho-In Jeon, Kyung-Won University

  11. Agenda of the Geneva Meeting • Welcome and introductions (09:30) • Review of JTC1 related events and procedures • Review of SAC concerns and objectives • Perspectives and expectations from IEEE, BSI, JTC1 (ANSI), IEC and ISO • Review key issues and possible solutions (including way forward on suspended ballot of ISO/IEC 8802-11 Amd No. 6) • Develop procedural action plan • Adjournment (16:30) Ho-In Jeon, Kyung-Won University

  12. The Resolutions (1/3) • To establish a special group, to be convened by a person appointed by the ITTF, and comprising representatives of the national bodies of ISO/IEC JTC1/SC 6, representatives of IEEE and representatives from the JTC1 Secretariat and the Central Secretariats of ISO and IEC, • The special group will review the technical content of the two proposals, i.e. IEEE 802.11i and the Chinese WAPI-proposal and make recommendations to ISO/IEC JTC1/SC 6 on how best to proceed. • A desired objective of the special group is to develop a single technical solution acceptable to all parties, Ho-In Jeon, Kyung-Won University

  13. The Resolutions (2/3) • The recommendations shall be developed at a meeting prior to the ISO/IEC JTC1/SC6 plenary meeting in August 2005, tentatively planned for 25-29 July 2005 in Beijing, China and submitted to the ISO/IEC JTC1/SC 6 Secretariat prior to the committee’s meeting in August 2005. • decides that the current ballot of Amd 6 to ISO/IEC 8802-11 shall continue to be suspended until the August 2005 plenary meeting of ISO/IEC JTC1/SC 6, • prior to the SC6 meeting, SAC shall submit a document for potential fast-track ballot to ITTF to allow, if needed, initiation of a fast-track ballot on 07 September 2005, Ho-In Jeon, Kyung-Won University

  14. The Resolutions (3/3) • should SC6 not be able to provide a recommendation acceptable to the ISO and IEC Secretaries-General, then the fast-track ballot on Amd 6 shall restart on 07 September 2005 with the SAC fast-track document simultaneously initiated for fast-track ballot and to close at the same date, • at the conclusion of the fast-track ballots, a joint comment resolution meeting shall be held to review the comments received on both proposals, • IEEE and the JTC 1 secretariat note that exceptional steps are being taken outside the existing policies and procedures of the JTC 1-IEEE cooperative agreement, Ho-In Jeon, Kyung-Won University

  15. Current Status • The meeting has been determined to be held on August 8 – 12, 2005 at Beijing. • No more than 6 SAC members from China. • No more than 6 IEEE 802 members. • No more than 2 delegates from P-member countries. • Mr. Jan Van den Beld hasbeen chosen as the convener of the Beijing meeting • 1991 – today: Secretary General of ECMA • 1983-1990: Philips co-ordinator for IT standardization • 1980-1982: Manager of the development centre and the information centre in the main computer centre of Philips in Eindhoven. Ho-In Jeon, Kyung-Won University

  16. Agenda of the Beijing Meeting • Review of meeting objectives • Presentation of Chinese WAPI project (document N....) • Presentation of IEEE 802.11i (document N....) • Examine possible technical solutions: • technical elements that may be harmonized into single approach • elements that may co-exist in ISO/IEC 8802-11 • Possible drafting of a single proposed amendment to IEEE 802.11 • Recommendations to ISO/IEC JTC1/SC 6 • Close of meeting Ho-In Jeon, Kyung-Won University

  17. Fundamental Limitations of the Beijing Meeting • No conclusion can be made if China NB and IEEE agree upon a single consensus. • This ad hoc meeting is not allowed to make any decision based on any voting procedure. • The decision is rather based on consensus than voting. • The final decision is validated only at the plenary meeting. • Most probably, separate independent standard will be generated. Ho-In Jeon, Kyung-Won University

  18. Next Step of SC6 • Related mostly with Internet Infrastructure Technologies. • Specifications on LAN, MAN and WAN • QoS and Speed Enhancement for the Infra • Routing protocols (IS-IS and Inter Domain) • Message Handling Systems • Directories, and ASN.1 • The workscope of WG1 on PHY and DL Layer is not enough for the future market including technologies supporting Ubiquitous Networking Environment. • Ubiquitous Networking Environment requires not only the infrastructure but also the terminals which contains all the layers. Ho-In Jeon, Kyung-Won University

  19. Proposal and Rationale to Extend • Revised SC6 WG1 Terms of reference • Physical and data link layer services and protocols, and additional services and protocols running over these layers • Rationale • WG1 Project Scope needs to be extended to cover diverse and fast changing market requirements in various IT areas including ubiquitous networking applications. • Since WG1 deals with network issues of Physical and Data Link Layer, it is rather easy to extend the scope to higher layers including application layers and services that require hardware specifications across the entire layers. Ho-In Jeon, Kyung-Won University

  20. Next Meeting of SC6 Plenary • August 29 – September 2, 2005 at Saint-Paul de Vence, France. Ho-In Jeon, Kyung-Won University

  21. Any Questions? Ho-In Jeon, Kyung-Won University