  1. BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH SUNDAY SCHOOL & FELLOWSHIP AREA

  2. Costs BUILDING COST $280,000 PARKING LOT COST $80,000 SUBTOTAL $360,000 10% CONTINGENCY $36,000 TOTAL$396,000 BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH SUNDAY SCHOOL & FELLOWSHIP AREA

  3. Cost Basis • includes demo of existing S.S. building • includes some sitework around new building • assumes wood framed building, with brick exterior • assumes nice level of finish, not real cheap, not real expensive • assumes commercial kitchen requirements • some ceramic floors: toilets and entry • lay-in ceiling • $4300 for appliances BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH SUNDAY SCHOOL & FELLOWSHIP AREA

  4. VOLUNTEER ASSUMPTIONS • rough carpentry labor • painting • finish carpentry • cleaning • general labor • OTHER POTENTIAL AREAS • electrical • plumbing • tile work • ceilings BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH SUNDAY SCHOOL & FELLOWSHIP AREA

  5. STATISTICS EXISTING CONDITION BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH SUNDAY SCHOOL & FELLOWSHIP AREA

  6. STATISTICS PROPOSED PROJECT BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH SUNDAY SCHOOL & FELLOWSHIP AREA

  7. BABY ROOM TOILET ROOMS FOYER CLASSROOMS OFFICE FURNACE CLASSROOMS EATING AREA KITCHEN SINGING TOILET PANTRY BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH SUNDAY SCHOOL & FELLOWSHIP AREA

  8. BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH SUNDAY SCHOOL & FELLOWSHIP AREA

  9. SANCTUARY FOYER • GENERAL DESIGN ASSUMPTIONS: • Covered main entry from parking area • secondary/ service entry from parking area • ability to expand to the north a little • create large flexible space rather than multiple small ones BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH renovation February 26th, 2006

  10. NOISE NOISE BARRIER SANCTUARY FOYER NOISE BARRIER • ISSUES (not in order of importance): • Noise • Safety • Current and future flexibility • Cost BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH renovation February 26th, 2006

  11. KITCHEN • ISSUES (not in order of importance): • Noise • Safety • Current and future flexibility • Cost BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH renovation February 26th, 2006

  12. ONE OPTION TO DEAL WITH CRAFTS STORAGE • ADD BASE CABINETS, COUNTERTOP AND UPPER CABINETS ON OPEN AREA SIDE OF “STORAGE” • STORAGE SPACE GETS A LITTLE SMALLER BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH renovation February 26th, 2006

  13. ANOTHER OPTION TO DEAL WITH CRAFTS STORAGE • GROW A CLASSROOM AND PUT FULL SIZE STORAGE UNITS IN ROOM – IT WOULD SERVE AS CRAFT ROOM • STORAGE SPACE GETS A LITTLE SMALLER BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH renovation February 26th, 2006

  14. BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH renovation February 26th, 2006

  15. Next Steps • Meet with city building official to determine his wants • Hire surveyor and civil engineer for site drawings • Submit for site plan approval • Submit for Land use approval • Finish construction Drawings • Bid out subcontracts • Start Construction BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH SUNDAY SCHOOL & FELLOWSHIP AREA

  16. TIMEFRAME • Do we want to have all the money in hand before we start or are we willing to start the process with what we have? • Building Committee Recommendation: • Start with the process now • Hire civil engineer, surveyor • Proceed with plans, talk with city • Keep fundraising • Send out notes asking for pledges BEVERLY HILLS APOSTOLIC CHRISTIAN CHURCH SUNDAY SCHOOL & FELLOWSHIP AREA