390 likes | 522 Views
Disrupting Class and the Future of Learning . Michael B. Horn mhorn@innosightinstitute.org Twitter: @ innosightinstit. Performance that customers can utilize or absorb. Pace of Technological Progress. Sustaining innovations. Incumbents nearly always win . Performance.
E N D
Disrupting Class and the Future of Learning Michael B. Horn mhorn@innosightinstitute.org Twitter: @innosightinstit
Performance that customers can utilize or absorb Pace of Technological Progress Sustaining innovations Incumbents nearly always win Performance Sustaining innovations Time
40% on $2,000 20% Performance that customers can utilize or absorb Pace of performance improvement Different measure Of Performance Disruptive Innovations: Competing against non-consumption Non-consumers or Non-consuming occasions Time Disruptive innovations Incumbents nearly always win 60% on $500,000 Sustaining innovations Performance 45% on $250,000 Time Entrants nearly always win
Disruption = affordability, accessibility • Yesterday • GM • Dept. Stores • State universities • Digital Eqpt. • Delta • JP Morgan • Xerox • IBM • Cullinet • AT&T • Sony DiskMan Today • Toyota • Wal-Mart • Community colleges • Dell • Southwest Airlines • Fidelity • Canon • Microsoft • Oracle • Cingular • Apple iPod
Disruption = affordability, accessibility • Yesterday • GM • Dept. Stores • State universities • Digital Eqpt. • Delta • JP Morgan • Xerox • IBM • Cullinet • AT&T • Sony DiskMan • Tomorrow • Chery • Internet retail • Online universities • Smart phones • Air taxis • ETFs • Zink • Linux • Salesforce.com • Skype • Smart phones Today • Toyota • Wal-Mart • Community colleges • Dell • Southwest Airlines • Fidelity • Canon • Microsoft • Oracle • Cingular • Apple iPod
Hearing aids Pocket radios Portable TVs Tabletop Radios, Floor-standing TVs Performance Different measure Of Performance Path taken by vacuum tube manufacturers Non-consumers or Non-consuming occasions Time Time It’s not a technology problem
Modular, open architectures Linux; Dell PCs Different system architectures Proprietary, interdependent architectures: Microsoft Windows; Apple products Customization is straightforward Customization is very expensive
Different learning needs @ different times Multiple intelligences Learning Styles Talents Motivations/interests Aptitude Depends on subject/domain Different paces Ongoing neuroscience research
Core curriculum Performance Different measure Of Performance Path taken by most schools, foundations and education software companies Non-consumers or Non-consuming occasions Time Time Crammed computers historically
Performance that customers can utilize or absorb Sustaining the chalkboard Performance Time
Looming budget cuts and teacher shortages are an opportunity, not a threat Prime examples of nonconsumption • Credit recovery • Drop outs • AP/advanced courses • Scheduling conflicts • Home-schooled and homebound students • Small, rural, urban schools • Unit recovery • Disaster preparedness • Tutoring • Professional development • Pre-K • After school • In the home • Incarcerated youth • In-school suspension • School bus commute • Summer school • Teacher absenteeism • Migrant worker families
% new % old 10.0 1.0 0.1 .01 .001 .0001 03 05 07 09 11 13 15 Substitution follows S-curve pattern % new
Online learning gaining adoption • Over 4M K-12 students doing online learning, says Ambient Insight • 30% of high school students & 19% middle school students, says Project Tomorrow
Online learning inherently modular Image courtesy of Khan Academy
Definition of blended learning Any time a student learns in part through online delivery, with some element of student control over time, place, path and/or pace and At least in part in a supervised brick-and-mortar place away from home
Emerging blended-learning models Rotation Flex Self-Blend Enhanced Virtual Students learn sometimes at a physical school, other times remotely Students attend physical school & take 1 or more courses online • Station rotation • Lab rotation • Individual rotation • Flipped classroom Online platform with F2F support and fluid schedules
Test Prep Specialized Online Instruction Tutoring Curricula Intervention/ Core Digital Texts Games Courses
Communication Assessment Systems Collaboration Instructional Systems LMS Teacher Tools Social Learning
Data Systems Data Warehouse Reporting SIS
Talent Management PD Systems Observation HR Systems
Practical implications • Begin at the end. Define outcomes. • Make technology the slave to your strategy, not the other way around. • Harness the power of time, place, path, and pace for student personalization. • Personalize for your circumstances too. Think in terms of “SWOT.” • Take advantage of rapidly improving content and communication tools. • Shift to outcome accountability, not input-based rules.
Practical implications • Not beholden by the old metrics • Seat time Competency-based • Geographic boundaries • Teacher certifications • In general, move beyond focus on inputs/processes • Self-sustaining funding • Autonomous • Human resources pipeline & PD • Broadband/wireless infrastructure • Portal/Based on usage and what works • Treatment and use of data
Fixed time, variable learning Progress to next grade, subject, or body of material Deliver content to students Testing & assessment Receive results
Competency-based learning Deliver content to students Testing & assessment Receive real-time interactive feedback Progress to next grade, subject, or body of material
Disrupting Class and the Future of Learning Michael B. Horn mhorn@innosightinstitute.org Twitter: @innosightinstit
Individual-rotation model: Carpe Diem Central Learning Lab T Intervention T 5:1 T T Direct Instruction 15:1 T 12:1 T Seminar Learning Lab Group Projects 273 students 6teachers (T) Source: Alex Hernandez, Charter School Growth Fund
Station-rotation model: KIPP Empower T Source: Education Elements
Classroom-rotation model:Summit Public Schools T Khan Academy Challenge projects Source: Alex Hernandez, Charter School Growth Fund
Lab-rotation model: Rocketship Education Teacher (T) Paraprofessional (P) T T Direct Instruction Direct Instruction Literacy/ Social Studies Math/Science T P Learning Lab Direct Instruction Literacy/ Social Studies Reading, Math Source: Alex Hernandez, Charter School Growth Fund