1 / 11

HXRSS Design Status

HXRSS Design Status. P. Emma et al Feb. 25, 2011. Figure 1 of the paper…. “…introduces no path delay of x-rays”. Taper works better. 1- m m rms e - pulse length (3 fs). Taper last 10 undulators for 100-GW power level. HRXSS Physics Requirements Document:

brandy
Download Presentation

HXRSS Design Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HXRSS Design Status P. Emma et al Feb. 25, 2011

  2. Figure 1 of the paper… “…introduces no path delay of x-rays” Taper works better 1-mm rms e- pulse length (3 fs) Taper last 10 undulators for 100-GW power level

  3. HRXSS Physics Requirements Document: Electron & FEL parameters (e.g., 20 pC) Chicane parameters Magnet requirements Crystal with position/angle controls Vacuum chamber requirements Bragg diagnostic requirements All tolerances

  4. New HXR Self-Seeding Chicane for the LCLS Undulator (~U12) 3.4 m QUAD QUAD BFW existing undulator segment BPM Remove one segment and add chicane (1.5 Å, 13.64 GeV) 3.20 m QUAD QUAD BFW 60 cm 60 cm 36cm 36cm 36cm 36cm BPM 58 cm ELEVATION VIEW e- provides 0-40 fs delay 2.6 mm crystal QUAD QUAD BFW B1 B4 B2 B3 BPM e- chicane raft 0-80 mm PLAN VIEW Beam Finder Wire |B0| ≈ 3.34 kG, R56 = 12 mm, cDt = 6 mm, hmax = 2.6 mm, q = 2.67 mrad

  5. e- beam with dipoles ON & inserted e- & x-ray beam with dipoles retracted x-ray beam with dipoles inserted 356 mm 80 mm 2.6mm 8 mm 32 mm 0 - 80 mm alignment stage alignment stage chicane raft chicane raft existing horizontal slider motor existing girder existing girder cross-sectional view elevation view

  6. CCD camera YAG screen (>0.3-mm thick?) vacuum window Bragg reflected x-rays f v 0.1 mm incident x-rays transmitted x-rays q crystal FEL Wavelength Range: lr = 1.4 to 1.7 Å (somewhat arbitrary) Bragg Crystal Angles :q = 51.7° (1.4 Å) to 72.4° (1.7 Å) Camera Viewing Angles: f= 2(p/2 -q) = 35.2° to 76.6° (>41°)* * Compromise: Allow camera viewing only from 1.4 to 1.6 Å or f= 77.6° to 51.4° (~27° range)

  7. HXRSS Chicane Dipole Magnet Design is Ready • D. Walz • 0-6 A • 576 main coil turns • ±1% trim coils (±6 A) • No water cooling • ~50 W/magnet • 0.02° C tunnel rise

  8. Possible 4-Axis Diamond Positioning System D. Shu (ANL)

  9. Possible HXRSS Layout at U15 (or U16) Crystal chamber (ion pump must move) Sliding raft to move all 4 dipoles IN or OUT (8 cm) J. Amann (SLAC) D. Shu (ANL)

  10. Issues • Do we place it at U15 or U16 (need ~1 GW seed)? • Will we lose power in SASE mode (25% so far)? • Can the chicane be tweaked to fix the phase error? • Is a 0-40 fs chicane OK (i.e.,only 20-40 pC supported) • OK to have 2.6-mm crystal-to-electron hor. clearance? • Commissioning plan started, but needs more thought. • Existing LCLS monochromator only measures 10-4 BW. This will have to suffice OK for now? • What will go wrong and how do we avoid it?

More Related