SC8 Liaison Report. 2014 Exploration & Production Standards Conference. API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick SC18 Liaison: Shawn Firenza. SC8/TG1 . Coverage – API SPEC 4F & RP 4G Chair – Shawn Firenza Document Status

brac
Download Presentation

SC8 Liaison Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick SC18 Liaison: Shawn Firenza

  2. SC8/TG1 • Coverage – API SPEC 4F & RP 4G • Chair – Shawn Firenza • Document Status • Spec 4F 4th ed. published January, 2013, effective August 1, 2013 • RP 4G published April, 2012 • Ongoing Activity • SES reported on the current design methodology comparison. We are working to define the next stage of the study to design. • Upcoming Letter ballot items • Modifications to account for rig moves. • Modification to the definition of substructure to clarify the inclusion of pony substructures. • Revisions to RP 4G to include platform rig structures in CAT IV inspections and to recommend evaluation of rig structures when a rig is moved to a new location.

  3. SC8/TG2 • Coverage – API SPEC 7K and RP 7L • Chair – Shawn Firenza/Faisal Yousef • Document Status • Spec 7K 5th ed. published June, 2012. Spec 7K 6th ed. Draft in progress. • RP 7L, reaffirmed August, 2012 • Ongoing Issues • Working to define specification for drawworks • Revisions to BOP handling specifications • Review of 6th edition draft for publication • Upcoming Letter Ballots • Purchaser Guideline • Revisions to hose specifications to allow for rotary hose used in underbalanced and gas drilling applications, increases in rated pressures, and fire ratings. • Removal of Power Tongs from the scope of covered equipment.

  4. SC8/TG3 • Coverage – API SPEC 8C, & RP 8B • Chair – Ken Kondo • Document Status • Spec 8C 5th ed. published April, 2012, errata issued May, 2014 • RP 8B 8th ed. Published May, 2014 • Ongoing Issues • Nominal Equivalent Stress • Sheaves • Many ballot items were resolved last year • Hydraulic Cylinders in hoisting and pull down applications • Wear limits on elevator bores • Addition of top drives and casing running tools in RP 8B • Allowance for pressure drop due to temperature variance during hydrostatic testing • Upcoming Letter Ballots • Purchaser Guideline

  5. SC8/TG4 • Coverage – API SPEC 7F, 9A & RP 9B • Chair – Dennis Fetter • Document Status • Spec 7F 8th ed. published November, 2010. Errata published May, 2013 • Spec 9A 26th ed. published May, 2011. Errata published October, 2012 • RP 9B 13th ed., published October, 2011. Errata published April, 2012, and January, 2013 • Ongoing Issues – • Wire rope design factors for setting BOP’s • Upcoming Letter Ballots • RP 9B revision – this revision gives much more guidance on the inspection and removal criteria for wire rope.

  6. SC8/TG5 • Coverage – API 7HU1 • Chair – Cindy Taff and Jason Shell • Document Status • API 7HU1, 1st ed. Published May 2009 • Ongoing Issues • Developing a Technical Specification for Design and Manufacture of Hammer Unions. Stress Engineering is performing analysis of the proposed design. • Currently the TG is expected to reaffirm 7HU1.