ARIZONA COUNTIES’ ROADWAY NEEDS STUDY 2008 UPDATE

ARIZONA COUNTIES’ ROADWAY NEEDS STUDY 2008 UPDATE. AACE 2009 January Quarterly Meeting, January 29, 2009 Rancho De Los Cabelleros, Wickenburg, AZ. Arizona Association of County Engineers. Total County Roadway Needs 2008 Compared to Previous Study Years. $12.85 Billion.

borna
Download Presentation

ARIZONA COUNTIES’ ROADWAY NEEDS STUDY 2008 UPDATE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ARIZONA COUNTIES’ ROADWAY NEEDS STUDY 2008 UPDATE AACE 2009 January Quarterly Meeting, January 29, 2009 Rancho De Los Cabelleros, Wickenburg, AZ Arizona Association of County Engineers

  2. Total County Roadway Needs 2008Compared to Previous Study Years $12.85 Billion

  3. How Can One Declare “$12.85 Billion”…As Costs Rise and Fall Daily? • The Easy Answer: Study Methods and Cost Inflator Series are Consistent with Previous Studies • Yes, but… Costs are Inflated to 3rd Quarter 2008 Dollars • Cost of $1.00 in 2004 became $1.308 in 3rd Quarter 2008 • Users of the Study during 2009-2013 Should Revise the Costs to the (Current) Year as they use the Study Results. • But What about 2009? • Gasoline, in one year, $3.09 to $4.11 to $1.68 /gal. • Copper, in one year, $ 3.46 to $4.10 to $ 1.84 /lb.

  4. Costs Rise and Fall…Continued • If Costs are coming Down, could adjust the inflator • Are contractor labor costs coming down? • Are Asphalt costs coming down? • Let’s decide--in the Strategy Session--whether to Adjust the Inflator

  5. Revenue and Needs Effects of Decline in Travel DECLINE IN VEHICLE-MILES TRAVELED ON RURAL HIGHWAYS, UNITED STATES, 2006-NOVEMBER, 2008 Source: USDOT, FHWA, Policy Information, Travel Monitoring

  6. Decline in Vehicle-miles Traveled on Rural Arterial Roads, 2008 vs. 2007 Source: USDOT, FHWA, Policy Information, Travel Monitoring *Alaska, Arizona, California, Colorado, Hawaii, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, Wyoming

  7. Revenue Effects of Decline in Travel… HURF and VLT Funds HURF AND VLT REVENUE PROJECTIONS ($MILLIONS) Source: September projections, adopted by AZ State Transportation Board; January, by consultant to AACE study

  8. Needs Effects of Decline in Travel… Needs Effects of Less Growth in Travel… • If Travel is Down by 10% for a Few Years, Can the Period For Repaving Stretch (from 7..from 20…from 40…to longer multiple-year intervals ?) • If it is decided to reduce Population Projections, the Model would Indicate fewer Capacity Failures • Should the Population increases for 2009-2013 be adjusted?

  9. How Did the Model Calculate the “$12.85 Billion”… • Asked the question previously, as a jumping-off point to discuss the current economic conditions • Do we adjust Inflator for Needs? • Do we adjust Population Projections? • Do we adjust Maintenance Periods? • Now asked the question again to transition to discussion of • Progress • Methods • Findings in the Data Counties Supplied

  10. Scope and Study Progress • Kickoff Meeting on September 25th • Requested County Data on Cost Factors • Requested County 2008 Roadway Inventory Data • Developed Revised Cost Factors and Economic Inflators • TAC Meeting on October 30th; Focus upon Cost Factors and Planning Guidelines • Received Inventories from many counties; received Bridge Data from ADOT • Ran the AACE Model with 2004 County Data and Revised Cost Factors • County Engineers’ Meeting, December 11th; Interim results by county • Continued to receive and update county data • Remainder of Study applied Revised Cost Factors to 2008 Roadway Inventories • Draft Report Provided to MCDOT • County Needs Study Report at AACE January 2009 Meeting (Wickenburg): Draft Report and Presentation Slides Distributed • Final Written Report, March 2009

  11. Arizona Counties Roadway ADOT Bridge Maintenance County Road Mileage Road Cost Factors and Planning Guidelines Cost Factors InspectionReports Plans/CIPs by Type Inventories from 2004 Study from 2004 Study Review by Review by AACE Committee AACE Committee Revised Calculate Revised Cost Select Eligible Cost Factors Maintenance Factors Projects and Planning Costs Guidelines Calculate Maintenance Analysis of Operating Needs Deficiencies Costs Program Calculate Safety Needs Upgrading Existing Roads Needs New Bridges on Existing Roads Needs Operating Cost New Road Maintenance Existing Bridges Needs Safety Needs Needs Needs Needs Total Needs Procedure: Same as in 2004

  12. Comparison of Urban vs. Rural Miles

  13. Breakout of Roadways by Functional Classification 2004

  14. Breakout of Roadway by Functional Classification 2008

  15. 2009-2018 Needed Expenditures by County

  16. Nearly Finished, but Will Ask Help Refining… • New Roads and Bridges • Bridge Repairs /Replacements • Other Items You Discover in Your Review