NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA June 26-27, 2008. PC Current Activities. Reliability Concepts Document Reliability Fundamentals Working Group being formed – need volunteers Additional Chapters Suggested:

bono
Download Presentation

PC Current Activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NERC PC Issues UpdateWECC PCC MeetingJohn Simpson, Reliant EnergyPlanning Coordination CommitteeSpokane, WAJune 26-27, 2008

  2. PC Current Activities • Reliability Concepts Document • Reliability Fundamentals Working Group being formed – need volunteers • Additional Chapters Suggested: • Transmission Planning • Resource Planning • Load Forecasting • System Protection and Control • Voltage and Reactive Assessment • Metrics

  3. PC Current Activities • Reliability Metrics Working Group • WECC Members: Brian Furumasu, BPA; Jerry Rust, NPPC • Formed 2 teams for LTRA Metrics: • Generation and Demand Side Management • Transmission Expansion • Plan to submit LTRA Metrics to PC for approval to post for comments at Sept ‘08 PC Meeting • RMWG meet in Oct to review comments and make changes • Submit final LTRA Metrics to PC for approval at Dec ‘08 PC meeting

  4. PC Current Activities • Integration of Variable Generation Task Force (IVGTF) • 50 Participants in 5 Subgroups • First draft report is 250 pages • Focus is Impacts and Implications of Variable Generation • “What” not “How To” • Second draft goal is 30 to 40 pages with key themes and recommendations • Second draft report to be presented to PC in Sept ‘08 • Final report and recommendations to be approved in Dec ‘08 • Meeting to present results to public in Jan ‘09

  5. PC Current Activities • Reliability Assessment Improvement Task Force (RAITF) • Recent work focused on : • Enhanced Capacity Definitions • Treatment of Deliverability • Emerging Issues • Scenario Assessment schedules

  6. Enhanced Capacity Definitions: • Current definitions: • Existing – Certain • Existing – Uncertain • Future – Planned • Future – Proposed • Proposed Definitions: • Existing – Certain • Existing – Other • Existing – Undeliverable • Future – Planned • Future – Proposed • Conceptual

  7. PC Current Activities • Reliability Assessment Guidebook – Ad Hoc Task Force • Small Task Force to develop guide for seasonal and long term assessments • Aggressive schedule to complete by Sept ‘08 PC meeting • Use will start with following seasonal and long term assessments • Need WECC representative to serve on task force!!!

  8. PC Current Activities • Reliability Assessment Subcommittee (RAS) • Scenario Outlines prepared by the Regions approved by the PC • Emerging Issue templates approved by the PC except for Natural Gas Transportation which was referred back to the RIS to redevelop as Fuel Transportation and Storage

  9. PC Current Activities • Transmission Availability Data System Task Force (TADS) • Phase I webTADS Reporting • 1st Qtr ‘08 data submittal deadline extended from 5/30 to 6/30 • TO Data Submittal • RE Data Review • NERC Data Review and Analysis • Results available Aug 2008 • Phase II Final report due in Aug 2008 • PC approval of final report in Sept 2008 • Board approval in Oct 2008 • Begin reporting in 2009

  10. PC Current Activities • Reliability Standards Development Plan • Draft of 2009 to 2011 plan in late July or early Aug • Standards Committee approval scheduled for Sept 22 • Board of Trustees approval scheduled for Oct 28 – 29 • File plan with FERC in Nov 2008