Calculating Peak Flow Rates

Calculating Peak Flow Rates. Rational and graphical peak discharge methods. Rational Method. Empirical method developed in 1851 to estimate q p (cfs) Many limitations but still widely used q p = peak flow (cfs) C = coefficient (dimensionless)

bonnie
Download Presentation

Calculating Peak Flow Rates

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Calculating Peak Flow Rates Rational and graphical peak discharge methods

  2. Rational Method • Empirical method developed in 1851 to estimate qp (cfs) • Many limitations but still widely used • qp = peak flow (cfs) • C = coefficient (dimensionless) • i = rainfall intensity (in/hr) with duration (D) = tc • tc = time of concentration • A = drainage area (ac) • 1.008 is conversion factor from ac-in/hr to cfs.

  3. Rational Method • Rationale of rational method: • As rain falls steadily across watershed runoff will increase until the entire watershed is contributing runoff • Occurs when rainfall duration (D) = tc • If D ≠ tc , runoff less than when D = tc • qp is at a maximum when D = tc • Assumptions of rational method: • Uniform rainfall over drainage area • Maximum qp is a function of the average rain intensity • Runoff frequency = rainfall frequency used

  4. Time of Concentration (tc) • The time it takes flow to move from the most hydraulically remote point in a watershed to the watershed outlet • The distance from the hydraulically most remote point to the outlet is called the hydraulic length • tc is the sum of flow times for the various flow segments as the water travels to the watershed outlet • Overland flow + shallow channel flow + open channel flow • Travel time for each segment depends on length of travel and flow velocity

  5. Hydraulically most remote point in the watershed

  6. Rational Method • Runoff Coefficient (C) • Difficult to accurately determine • Must reflect factors such as: interception, infiltration, surface detention, antecedent moisture conditions • Studies have shown that C is not a constant • C increases with wetter conditions • Table 5.5 contains a range of values for C • Compute average C for composite areas • Area weighted basis • Cavg = SCiAi / SAi(same method used with Curve Numbers)

  7. Runoff Coefficients for the Rational Method

  8. Rational Method Summary • Peak flow equation only • Cannot predict time to the peak (tp) • Should not be used to develop hydrographs

  9. Example Problem Given: • Location: St. Louis, MO • Watershed area: 40 ha (1 ha = 2.47 ac) • 30 ha, medium density residential / 7% slope / HSG = A • 3 ha, high density residential / 1% slope / HSG = C • 7 ha , agricultural / 4% slope / HSG = B • tc = 60 min. • Rainfall event: 5-yr storm • Required: • Find the peak runoff (qp)

  10. Example Problem Solution: • Rainfall intensity (i) = 2.0 iph (Figure 2.17) • Land Use Area Area C (ha) (%) (Table 5.3) Med. Residential 30 75.0 0.31 High Residential 3 7.5 0.49 Agricultural 7 17.5 0.15 • Cavg = 0.31(0.75) + 0.49(0.075) + 0.15(0.175) = 0.30 • Area = 40 ha = 98.8 ac • qp = 1.008CiA = 0.30(2.0 in./hr)98.8 ac  qp = 59.75 cfs

  11. AGSM 335 • Homework # 5

  12. Time of concentration calculation • Most common tc equation for use with Rational Method. • tc – time of concentration (minutes) • L – hydraulic length (ft) • S – slope along hydraulic length (ft/ft)

  13. Graphical Peak Discharge Method • Used for small rural and urban watersheds • q – peak discharge (ft3/s) • qu – unit peak discharge (ft3/s-mile-in) [Fig. 5.16 and 5.17; based on Ia = 0.2S and tc] • A – drainage area (mi2) • Q – runoff depth based on 24 hour rainfall (in) [Curve Number Q] • F – adjustment factor for ponds and swamps. [Table 5.3]

  14. tc for Graphical Peak Discharge Method • Based on NRCS lag equation: • tL – lag time (hours) • L – hydraulic length (ft) • S – CN (II) S • Y - average land slope (%) • Time of concentration (tc)

  15. tc for Graphical Peak Discharge Method • If the CN conditions for Eqn. (5.6) not met than can use a combination of Eqns. (5.8, 5.9 and 5.10) or • v = velocity (ft/s) • K2 is from Table 5.4 • S = slope (%) • tc – time of concentration (hrs)

  16. BAEN 460 • Homework #5