1 / 30

REHAB-REKON (RR) ACTIVITIES FOR WEST SUMATRA post- EARTHQUAKE

REHAB-REKON (RR) ACTIVITIES FOR WEST SUMATRA post- EARTHQUAKE. DINAS PETERNAKAN SUMATERA BARAT.

bonner
Download Presentation

REHAB-REKON (RR) ACTIVITIES FOR WEST SUMATRA post- EARTHQUAKE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REHAB-REKON (RR) ACTIVITIESFOR WEST SUMATRApost- EARTHQUAKE DINAS PETERNAKAN SUMATERA BARAT

  2. wali nagari dari Kota Pariaman (6 orang), Kabupaten Padangpariaman (34 orang), Kabupaten Agam (6 orang), Kabupaten Pasaman Barat (26 orang), Kabupaten Pesisir Selatan (6 orang), Kabupaten Solok (18 orang), ditambah dari daerah lain 4 orang. Total 100 peserta. 

  3. TAHAP I

  4. JENIS KEGIATAN • BANTUAN KANDANG (RP.820.000.000) • 41 KELOMPOK (RP.20.000.000/KELOMPOK) • BROILER,LAYER,AYAM KAMPUNG,PUYUH,KAMBING DAN SAPI POTONG • LOKASI 6 KABUPATEN ( PASBAR,PDG,AGAM,PDPR,PR,PESSEL) • BANTUAN OBAT HEWAN (RP.48.000.000) • UNTUK 9 KABUPATEN/KOTA • BANTUAN PERALATAN KESWAN (RP. 46.300.000) • UNTUK 9 KABUPATEN/KOTA • BANTUAN PERALATAN INSEMINASI BUATAN (RP.90.500.000) • UNTUK 6 KABUPATEN/KOTA ( 6 KAB/KOTA)

  5. Obat Hewan • 10 PAKET

  6. Peralatan Keswan • 10 PAKET

  7. Insemination Kit • .1. Carrying case • 2. AI Gun • 3. AI Gun container (Tempat/wadah AI Gun, untuk menghindari bengkok bila sedang di bawa-bawa) • 4. Short apron • 5. Plastic Gloves • 6. Plastic sheet • 7. AI sheet container (Tempat/wadah Plastic Sheet, untuk menghindari patah bila sedang di bawa-bawa) • 8. Surgical Scissor • 9. Scalpel Blade • 10. Steril Gloves • 11. Goblet • 12. Goblet forceps • 13. Straw tweezer • 14. Cooling bag (Thermos pendingin berbentuk tas) • 15. Ice Pack • 16. Vaginoscope • 17. Clinical Digital Thermometer

  8. OPERASIONAL • HONOR ( RP.24.000.000) • PETUGAS TEKNIS KAB/KOTA ( 6 KAB X 2 ORG) KEGIATAN BANTUAN KANDANG • PETUGAS TEKNIS PROPINSI 3 ORANG • TIM PENGADAAN DAN PEMERIKSA BARANG DAN JASA • ATK DAN ADMINISTRASI DAN CETAK • PENDUKUNG ADM PROYEK • BIAYA RAPAT • PROPINSI • KAB/KOTA • BIAYA PERJALANAN • PUSAT 2 OP • PROPINSI 140 OH • KAB/KOTA 250 OH (20 OH/KAB/KOTA

  9. PERSONAL • PROPINSI • PENANDATANGAN SPM : IR.EDWARDI,MM * • KUASA PENGGUNA ANGGARAN ; DRH.ERINALDI,MM* • PEJABAT PENGESAH SPJ : YUSRIZAL,SE* • BENDAHARA ; NENG AIDA* • PENGELOLA BARANG BNPB : NOVRIZAL* • PEJABAT PEMBUAT KOMITMEN : IR.ARYATI* • PETUGAS TEKNIS • PRODUKSI ; Ir. YOLAS PENDRA • KESEHATAN HEWAN ; Drh.Rury Dasril • PENYULUHAN ; Dearman Jamal, SPt • KAB/KOTA • PETUGAS TEKNIS • BIDANG PRODUKSI • BIDANG PENYULUHAN DAN LAPANGAN

  10. PEDOMAN TEKNIS • BROILER • LAYER • PUYUH • AYAM BURAS • KAMBING • SAPI POTONG

  11. SATUAN BIAYA BANTUAN KANDANGTERNAK -RR • BROILER Rp.10.000.000 • LAYER Rp.7.500.000 • PUYUH Rp. 2.000.000 • AYAM BURAS Rp. 1.000.000 • KAMBING Rp. 500.000/ekor • SAPI POTONG Rp. 1.000.000/ekor

  12. PERSIAPAN • ADMINISTRASI • SK PERSONIL • SK PENERIMA BANTUAN • PERSIAPAN BESTEK • TEKNIS • PENYUSUNAN JUKLAK DAN JUKNIS • PERTEMUAN TIM TEKNIS • VERIFIKASI PETANI • MODEL BANTUAN • PERSIAPAN KELOMPOK PENERIMA • PENYERAHAN BANTUAN

  13. SKEDUL

  14. REALISASI TAHAP I • PENGADAAN BARANG 100% • ALAT KESWAN 100% • OBAT HEWAN 100 % • PERALATAN IB 100 % • BANTUAN KANDANG 45% • DPA 41 K2LOMPOK DAN REALISASI 56 KELOMPOK • ADMINISTRASI 100 % • REALISASI BANSOS MENUNGGU PERSETUJUAN REVISI • OPERASIONAL 70 %

  15. KELOMPOK REHAB-REKON BANTUAN SOSIAL KANDANG TERNAK

  16. TAHAP II

  17. AKSELERASI PROGRAM PEMULIHANSEKTOR EKONOMI PRODUKTIFPASCA GEMPA SUMATERA BARAT

  18. AGENDA • BANTUAN SOSIAL EKONOMI PRODUKTIF PENGEMBANGAN BUDIDAYA TERNAK DI PEDESAAN • PELATIHAN USAHA PETERNAKAN SKALA EKONOMI PRODUKTIF • BIMBINGAN TEKNIS DALAM BENTUK TOT • BIMBINGAN TEKNIS LAPANGAN OLEH KAB/KOTA

  19. KRITERIA USAHA • UNGGAS • PUYUH • ITIK • AYAM BURAS • RUMINANSIA KECIL • KAMBING • DOMBA • ANEKA TERNAK

  20. STANDAR PEMBIAYAAN • PEMBUATAN KENDANG (20%) • PENGADAAN BIBIT/TERNAK BAKALAN (60%) • PAKAN TERNAK DAN OBAT-OBATAN ( 20%) • TOTAL BIAYA SETIAP PAKET USAHA 12,5 JT

  21. ANALISA USAHA SEDERHANA • AYAM • POPULASI 200 EKOR • PRODUKSI 70% ( 140 BTR / HARI) • INCOME RP 1000 X 140 BTR = RP 140.000 / HARI • PENGELUARAN 90 GR X 200 = 18 KG/HR = RP 80.000 • PENGHASILAN RP 60.000 / HR = RP 1,8 JT/BLN

  22. LANJUTAN • ITIK • POPULASI 200 EKOR • PRODUKSI 70% ( 140 BTR/HR) • PEMASUKAN 140 BTR X RP 1200 = RP 168.000/HR • PENGELUARAN 140 GR /HR/EKOR X 200 EKOR= 28 KG X 4000 = RP.96.000/HR • PENGHASILAN RP 72.000 / HARI ( 2.160.000/BLN)

  23. LANJUTAN • PUYUH • POPULASI 1000 EKOR • PRODUKSI TELUR 700 BTR/HARI • PEMASUKAN 700 BTR X RP 250 = RP 175000/ HARI • PENGELUARAN 1000 X 25 GR/HR = 25 KG X RP. 4000 = RP.100.000/ HR • PENGHASILAN 75.000 X 30 HR = 2.25 JT/BLN

  24. LANJUTAN • KAMBING • POPULASI 10 EKOR ( 1 JANTAN, 10 BETINA) • PENAMBAHAN POPULASI BETINA MELAHIRKAN 3 KALI DALAM 2 TAHUN ( 2 TAHUN SETIAP BETINA PUNYA ANAK 5 EKOR ) • TAMBAHAN POPULASI MENJADI 60 EKOR • TAMBAHAN NILAI 50 EKOR X RP 500.000 = 25 JT/24 BLN • PENGHASILAN RP 1,25 JT/BULAN

  25. REKOMENDASI • JANGKA PENDEK • AYAM • ITIK • PUYUH • JANGKA MENENGAH • KAMBING/DOMBA

  26. SASARAN • MENINGKATKAN EKONOMI MASYARAKAT KORBAN GEMBA 30 SEPTEMBER 2009 . • PENGEMBANGAN EKONOMI PRODUKTIF PEDESAAN BIDANG PETERNAKAN • MENINGKAT PELUANG USAHA DAN LAPANGAN KERJA UNTUK MASYARAKAT DI WILAYAH BENCANA. • MENJADIKAN USAHA PETERNAKAN SEBAGAI USAHA KELUARGA

  27. TARGET • 9 KABUPATEN/KOTA • 200 KELOMPOK PETERNAK( 3000-4000 KK ) • DANA YANG DI PERLUKAN UNTUK BANSOS PERMODALAN ( 5 MILYAR ) • DANA UNTUK PEMBINAAN/PENYULUHAN / PEMBENTUKAN KELOMPOK 500 JT • PELATIHAN TEKNIS BUDIDAYA UNTUK 200 KLP DIPERLUKAN 1,8 MILYAR • DANA KEBUTUHAN PENUNJANG DAN OPERASIONAL PROJECT 400 JT • BANTUAN KANDANG TAHAP 300 JT • TOTAL KEBUTUHAN 8 MILYAR

More Related