1 / 10

Update on Supplier’s Declaration of Conformity – USA

Update on Supplier’s Declaration of Conformity – USA. William Hurst Federal Communications Commission Office of Engineering and Technology. Equipment Authorization Program. The FCC currently has four equipment approval programs Verification Declaration of Conformity (DoC)

blemus
Download Presentation

Update on Supplier’s Declaration of Conformity – USA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on Supplier’s Declaration of Conformity – USA William Hurst Federal Communications Commission Office of Engineering and Technology Update on SDoC - USA

  2. Equipment Authorization Program • The FCC currently has four equipment approval programs • Verification • Declaration of Conformity (DoC) • Supplier Declaration of Conformity (SDoC) • Certification • The product approval requirement is specified in the rule part under which equipment operates • All four programs involve the use of the private sector to varying degrees Update on SDoC - USA

  3. Equipment Authorization Program Certification (Approved by FCC or TCB) Maximum The type of approval is specified in the rules for the particular type of device DoC (Self-approval using an accredited lab) SDoC (Self-approval Database by ACTA) Verification (Self-approval) Minimum Update on SDoC - USA

  4. FCC Authorization Requirements (1) TTE does not require the use of an accredited lab. (SDoC) (2) A TCB may certify this equipment Update on SDoC - USA

  5. Telephone Terminal Regulations 47 CFR Part 68 – Telephone Terminal Equipment (TTE) • Public Switched Telephone Network (PSTN) • Private Line Interfaces • Analog Interfaces • Digital Interfaces Update on SDoC - USA

  6. Options TCB Reviews Application Issues Certificate Record in ACTA Database Test Report and Supporting Documentation Application for Certification Submit SDoC to Administrative Council Prepare SDoC Update on SDoC - USA

  7. Suppliers Declaration of Conformity Section 68.324 • Responsible Party • Model Number • Statement of compliance • Reference to technical requirements • Date and place of issue • Signature, name and function of signatory • Statement of HAC compliance • Requirements established by Administrative Council Update on SDoC - USA

  8. SDoC Section 68.324 • Included in User’s Manual or separate document provided with equipment • Instructions as required by the Administrative Council • Copy of the declaration provided to Administrative Council • Make declaration available on company website Update on SDoC - USA

  9. SDoC Section 68.326 – Records • Copy of Supplier’s Declaration of Conformity • Identity of testing facility • Detailed testing procedure used • Test results • Maintain records for at least 10 years after the manufacture of the equipment has been permanently discontinued (or investigation) Update on SDoC - USA

  10. SDoC Section 68.346 - Description of Testing Facilities • Responsible party shall retain a description of the testing facilities used • Required description to be given by the Administrative Council. Update on SDoC - USA

More Related