An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IRNs for 200f Study • Agenda • Top Level Scope • NWA • Document Location • Roles and Responsibilities

  2. Top Level Scope • Study in FY2011 Time Frame • Review IS-GPS-200e IRNs (7 IRNs) • Scope of the Study • Evaluate 200e IRNs for Impact to DAGR PRF • HW and/or SW Change Description, if any • Recommend Solutions if Other DAGR PRF Requirement are Impacted • Final Report December 14, 2011 • Includes Cost and Schedule ROMs • Two options • PRNs 1-32 option • PRNs 1-37/63 option

  3. NWA • NWA - GH12 IS-GPS-200e SW Updates FY12 B&P (000100090405 / 0100 / xxxx)

  4. Document Location • IS-GPS-200f IRNs • RCI has agreed to use these versions • T:\03_projects\DAGR\dev_systems\system_analysis\200f study\IRNs • Review Karl Kovach’s slides: 2011-09-23 Above&Beyond_vA.pdf • Report • T:\03_projects\DAGR\dev_systems\system_analysis\200f study

  5. Roles / Responsibilities • Program Manager – Joy Hoffman • Technical Lead - Gary Bachman • Software - Steve Adams (PE), Nate Becker, Eric Stumpf • Systems - Linda Carollo (PE), John Bader, Kimball Behning • Simulator - Dave Taylor (PE), Sandy Phelps • CORE Systems - Mark Whiting • CORE Software – Jo Lynn Bentz (PE), Jonathan Sebast • Other – Paul Jagnow, John Nielson • PFA - TBD

  6. Roles / Responsibilities • IS-GPS-200f • Gary is coordinating the review activities • John Nielson has been leading RCI’s review of this independent of the DAGR contract • Need everybody to do an initial review to point out potential problems areas • Similar to what we did for 200e • Follow-on assignments will be determined based on the initial review results • Provide review comments to Gary • Initial review comments by November 10, 2011 or ASAP • Gary will create report with input from others • PEs will help assemble Cost and Schedule ROMs