A brief presentation about Tapovan Vishnugad Hydro Power Project (TVHPP) of NTPC Ltd at Joshimath, Uttarakhand expressing the proud feeling of Binay Krishna, Sr, Egr. (Planning & System) for being associated with such a great team of dedicated professionals.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'TVHPP Proud' - binay2001in


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2
A DIFFERENT VIEW OF TVHPP
  • BINAY KRISHNA
  • Sr. Er. (P&S)
  • NTPC LTD.
slide4
Today we are going to see a different aspect of this ambitious 520 MW Mega Power Project.
slide5
The salient features of the projects often over look these details,

The details about the professionals constructing the project…

slide6
Professionals from Sikkim in East to Rajasthan in West, from Andaman in South to Ladakh in North...
slide7
Speaking six different languages and representing Hindu, Muslim, Sikh and Christian religions but duty prevailing these factors…
slide9
Each of them being the toppers of their class/college/university…
slide11
Having only two things in common:
  • Dream of a stronger and prosperous India..

..AND…

  • Devotion to NTPC.
slide14
Where half of them have to travel 2 continuous days to reach their home even in the case of emergency…
slide19
With minimum of facilities:
  • Working initial years without a seat to sit,
  • Living three years in shared rooms,
  • Most of the time without any communication facility.
slide26
Tackling head on the adverse Geological conditions of Himalayan geology like Shear zone, water ingress and being close to Main Central Thrust…
slide27
At the same time fighting with the adverse climatic conditions of sub zero temperatures and land slides at every site during every rain…
slide28
Working day and

Night…

  • While temperature of night goes well below zero.
slide29
Night…
  • When the water on the streets turns in to solid ice - at times posing high risk to commuting vehicles and persons.
slide30
Winter Night…
  • When the metal gets stuck to the skin the moment it touches.
  • When the water ingress of tunnel on your head and feet is at freezing temperature.
slide31
Working with average working hours probably more than any other project in the world…

…and working happily, fully aware of the importance this Mega Power Project holds in the growth of their motherland.

slide32
Fueled with the fire of self motivation and vision of “Power to all” while families of some of them are still living without electricity.
slide33
I Salute these unsung heroes and un-armed soldiers of the nation contributing their sweat and blood to the project and hence the nation…….