1 / 35

NPDES REQUIREMENTS

NPDES REQUIREMENTS. NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance is a major initiative of the Department. P.O.M. SECTION B 4 10-1. E & S Plan . Pollution Prevention Plan includes

bianca
Download Presentation

NPDES REQUIREMENTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NPDES REQUIREMENTS

  2. NPDES REQUIREMENTS • Pollution Control is Contractor’s responsibility • PennDOT is responsible for enforcement • Its our Public Duty • Environmental compliance is a major initiative of the Department

  3. P.O.M. SECTION B 4 10-1

  4. E & S Plan • Pollution Prevention Plan includes • Maps and Drawings • Narrative • Sequencing

  5. Terminology • NPDES • BMP • CCD • Rain Event

  6. Monitoring and Reporting • All NPDES Permits require • Weekly Inspection of Site • Site Inspection after every measureable rain event within 24 hours • Written reports for every inspection • Inspections performed by Department and Contractor

  7. VISUAL INSPECTION CHECKLIST

  8. So What • Non-Functioning BMP repaired in 48 Hr • If not fixed – PennDOT to report to CCD • What makes more sense? • You Have contractor fix OR • Call CCD to have contractor fix it • Details are in Permit

  9. So What if Contractor is Fined • It is his problem • He will have to pay the fine • It is not PennDOT’s fault • WRONG

  10. IIC Responsibility • Attain Transfer/ Co-Permittee Application • Coordinate required Inspection process with Contractor • Details how inspection reports are provided to CCD • Rain gage on Project

  11. Violations - NOV • What are they: • Non-Functioning BMP from Inspection • BMP not repaired after 48 hrs • CCD comments that a BMP needs repaired • None of the above

  12. Violations - NOV • Official NOV issued by DEP or CCD • Result of Serious violation • Has DEP Case Number on it • District must submit copy to • BOCM • Office of Chief Counsel • Within 48 hours

  13. N.O.V. TRACKING The NOV Tracking spreadsheet has been placed at the following location: P:\Penndot Shared\NOV District Tracking\Notice of Violation Capture With Threat of NOV.xlsm

  14. N.O.V. TRACKING INFORMATION • COUNTY • DEP REGION • SR/SEC • CONTRACT # • ISSUING AGENCY • CONTRACTOR • CONTRACTOR INFO • DATE OF VIOLATION • NATURE OF VIOLATION • DESCRIPTION OF VIOLATION • ACTIVITY CAUSING N.O.V. • RESOLUTION • STATUS OF NOV • CITATION AMOUNT

  15. APPROVAL FROM D.E.P. OR C.C.D. Individual Permits (PAI) General Permits (PAG)

  16. PERMIT RETURNED FROM D.E.P.

  17. PERMIT RETURNED FROM C.C.D.

  18. PERMIT DETAILS

  19. Permit Approval • Approval with Conditions • E & S Plan, • Post Construction Stormwater Management (PCSM) • Preparedness, Prevention and Contingency (PPC) Plans

  20. E & S POLLUTION CONTROL PLAN

  21. E & S POLLUTION CONTROL PLAN

  22. P C S M PLAN EXAMPLE

  23. P C S M PLAN EXAMPLE

  24. P P C PLAN Preparedness, Prevention And Contingency Plan

  25. P P C PLAN EXAMPLE

  26. P P C PLAN EXAMPLE

  27. TRANSFEREE/CO-PERMITTEE APPLICATION

  28. TRANSFEREE/CO-PERMITTEE APPLICATION

  29. TRANSFEREE/CO-PERMITTEE APPLICATION • MAKE SURE THAT ALL APPLICABLE PAGES ARE SIGNED BY ALL PARTIES • MAKE SURE DOCUMENT IS NOTARIZED • THIS DOCUMENT IS VITAL IF CONTRACTOR BEGINS WORK AND A VIOLATION OCCURS !

  30. BORROW EXCAVATION AND WASTE AREAS • E & S PLAN for all Borrow and waste Areas • SUBMITTED TO THE DEPARTMENT and AUTHORIZED C.C.D. • FORM 4345 COMPLETED • ENVIRONMENTAL DUE DILIGENCE FORM COMPLETED

  31. OTHER ENTITIES (IF APPLICABLE) • US ARMY CORPS OF ENG. WATER OBSTRUCTION – ENCROACHMENT PERMIT • US FISH & WILDLIFE SERVICE • US COAST GUARD • PA DEPT OF ENVIRONMENTAL PROTECTION • PA FISH & BOAT COMMISSION • PA GAME COMMISSION • PA DEPT OF CONSERVATION & NATURAL RESOURCES • US ENVIRONMENTAL PROTECTION AGENCY

  32. EXPIRATION OF PERMIT Revisions to the Permit may be necessary upon renewal!

  33. NOTICE OF TERMINATION • MANAGEMENT REQUIREMENTS • permitteeor co-permitteemust submit a Notice of Termination (NOT) form • signed with Signatory Requirements of this permit. • All NOTs certifying discharge termination are to be sent to the Department, or the authorized County Conservation District.

  34. NOTICE OF TERMINATION • CCD indicated this is a MUST • C.C.D. will confirm that the stormwater Management activities are complete. • This relieves PennDot and the contractor from any further responsibilities

  35. ANY QUESTIONS ?

More Related