An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Contra Costa Approach (I):Initial Implementation of LID Tom Dalziel, Assistant Program Manager Contra Costa Clean Water Program Dan Cloak, P.E., Principal Dan Cloak Environmental Consulting

  2. Contra Costa Approach: Afternoon Presentations • Experience So Far with LID(Tom Dalziel and Dan Cloak) • Sizing IMPs to manage hydrograph modification (Tony Dubin, Brown & Caldwell) • Stream Classification Methodology (Andy Collison, Philip Williams & Associates) • Next Steps in Implementation(Dan Cloak)

  3. NPDES Permit New Development requirements • Treat runoff before discharge from site. • Match runoff peak flows and durations to pre-project conditions. • Cover or control sources of stormwater pollutants. • Maintain treatment facilities in perpetuity.

  4. Cities, Towns, and County must • Incorporate requirements into their policies and processes for development review • Verify that on-site treatment devices are maintained • Prepare a Hydrograph Modification Management Plan to control future increases in runoff peaks and durations

  5. Program Objectives • Comply with NPDES permit requirements. • Achieve reasonable protection of beneficial uses. • Minimize staff time required for additional project review. • Minimize costs to applicants. • Encourage “smart growth” and maintain economic competitiveness. • Adopt a flexible approach. • Encourage participation and consensus among interested parties.

  6. Key Implementation Steps • Update to Model Stormwater Ordinance • Requires Stormwater Control Plan with Planning and Zoning Application • Adopted by each municipality countywide • Stormwater C.3 Guidebook • Workshops for municipal staff and land development professionals • Assistance with initial projects and preparation of examples

  7. Stormwater C.3 Guidebook • Step-by-Step Approach to Compliance • How to Prepare a Stormwater Control Plan • Guidance for Selecting Treatment Facilities • Design Checklists and Standard Details for LID IMPs • Spreadsheet for Sizing BMPs and presenting calculations • Sample Outline and Examples • How to prepare an Operation and Maintenance Plan for treatment facilities • References and Hyperlinks to Design Resources

  8. Stormwater Control Plan Contents • Project Setting • Measures to Limit Imperviousness • Selection & Design of Treatment BMPs • Source Control Measures • Permitting and Code Compliance Conflicts • BMP Maintenance • Construction Plan C.3 Checklist • Certification

  9. Development Review Pre-Application Meeting Completed Application “Deemed Complete” Section Review Planning Commission Conditions of Approval CEQA Review Detailed Design Plan Check Permits to Build

  10. Stormwater C.3 Compliance Section staff may review planning & zoning docs forC.3 Pre-Application Meeting Completed Application “Deemed Complete” Planning staff may determine if C.3 req’ts are addressed Staff identifies general C.3 requirements Section Review Planning Commission Conditions of Approval CEQA Review C.3 requirements attached to COAs Detailed Design Plan Check Permits to Build Staff reviews C.3 implementation in drawings & specs

  11. Operation & Maintenance General descriptionof O&M requirements Detailed description and maintenance plan for each facility Certification of inspection &continued operation Stormwater Control Plan Stormwater Facilities Operation & Maintenance Plan Stormwater Facilities Compliance Certificate Submitted with Planning & Zoning Application Draft submitted with construction documents Renewedeachyear

  12. Results so far • Development community has responded positively to: • Consistent ordinances countywide • Usability of Stormwater C.3 Guidebook • Workshops • Biggest Challenges: • LID requires a different approach to drainage design • Resolving conflicts with public works standards • IMP ownership and maintenance responsibility

  13. Low Impact Development in Contra Costa County:Problems and Solutions Dan Cloak, P.E. Dan Cloak Environmental Consulting

  14. Implementing LID • Showing compliance with NPDES permit criteria for treatment • Designing effective IMPs • Residential Subdivisions: • Street and drainage design • IMP operation and maintenance • Integrating with the HMP

  15. Showing Compliance • NPDES Permit sizing criteria for treatment control: • “collect and convey” drainage design • conventional, “end of pipe” treatment • use of runoff factors to determine design inflow or volume

  16. Accounting for Pervious Areas • Self-treating areas • “Zero discharge” or “self-retaining” areas • Reduced runoff areas LID Conventional

  17. Zero discharge areas Conventional grading Zero-discharge area

  18. Zero-discharge areas

  19. Example LID Site Design

  20. Example LID Site Design • Make landscaped areas “self-retaining”

  21. Example LID Site Design • Delineate areas that drain to each IMP • Decide where roofs will drain • Divide paved areas along grade breaks

  22. Example LID Site Design • Fit IMPs into landscaping at low points of each drainage area

  23. Example LID Site Design • Show each IMP is sized to treat runoff from its tributary area

  24. IMP Design Gallery } • Flow-through Planter • In-ground Planter • Bioretention Area • Vegetated or Grassy Swale • Infiltration Basin • Dry Well • Infiltration Trench “Indirect Infiltration” } “Direct Infiltration”

  25. Indirect Infiltration Turf or planting Planting medium Gravel or drain rock Perforated pipe

  26. Sizing Criterion 0.2 inches/hour BMP Area/Impervious Area = 0.2/5 = 0.04 Planting medium i = 5 inches/hour

  27. Flow-through Planter

  28. Vegetated (“Dry”) Swale

  29. Design Checklists • Vegetated Swale • Setbacks from structures • Sizing criteria • Minimum depth • Side slopes • Specification for imported soil • Specification for underdrain • Irrigation

  30. Direct Infiltration Dry Well

  31. Residential Subdivision

  32. Residential Subdivision • Suitably sized infiltration basin would require 3 of 80± lots • Roofs, driveways, and landscaped areas drain to front yard swales • Streets drain to same swales

  33. Seattle “SEA” Streets

  34. Swales in Front Yards • Some jurisdictions prefer monolithic curb & gutter • Access to parked vehicles • Avoid trip hazards • Standard location for public utilities • Still developing “standard” designs and maintenance responsibility

  35. Curb and sidewalk

  36. HMP Requirements • NPDES permittees must propose a plan • Manage increases in flow and volume where increases could: • Increase erosion • Generate silt pollution • Impact beneficial uses • Post-project runoff may not exceed pre-project rates and durations • Option: “Equivalent Limitation” • Account for expected stream change • Maintain or improve beneficial uses

  37. Contra Costa HMP • Succinct standard, with four compliance options • Encourage Low Impact Development Integrated Management Practices (LID IMPs) • Allow proposals for stream restoration in lieu of flow control where benefits clearly outweigh potential impacts • No exemptions for: • Project size (>1 acre impervious area must comply) • Infill projects in highly developed watersheds • Project cost

  38. Four Compliance Options • Demonstrate project will not increase impervious area • Implement pre-designed hydrograph modification IMPs • Use a continuous simulation model to compare post- to pre-project flows • Demonstrate increased flows will not accelerate stream erosion