The PM-QPSK Pick and Place machine leverages trusted technology and creative engineering to enhance productivity in packaging and assembly processes. Equipped with flexible gantry systems and epoxy dispensers, this machine efficiently handles various components including tape and reel waffle packs. With impressive throughput times for first and second-pass operations, it can complete 200 packages in approximately 3 days. Each production line is optimized for accuracy and speed, ensuring reliable performance for modern manufacturing needs.
E N D
PM-QPSK Pick and Place machine X Gantry Y Gantry Tape and Reel Waffle Pack PM QPSK Package Trusted Technology. Creative Engineering
PM-QPSK Pick and Place machine Trusted Technology. Creative Engineering
PM-QPSK Pick and Place machine Trusted Technology. Creative Engineering
PM-QPSK Pick and Place machine Pick Up Head Epoxy Dispenser Trusted Technology. Creative Engineering
PM-QPSK Pick and Place machine Camera Epoxy Dispenser Pick Up Head Trusted Technology. Creative Engineering
PM-QPSK 1st Pass PnP Trusted Technology. Creative Engineering
PM-QPSK 2nd Pass PnP Trusted Technology. Creative Engineering
PM-QPSK 2nd Pass PnP Trusted Technology. Creative Engineering
PM-QPSK 2nd Pass PnP Trusted Technology. Creative Engineering
Through put for 1st Pass Time to complete 4 pcs PLC Spacer 60.40sec Time to complete 2 pcs TIA Spacer 35.20sec Time to complete 3 pcs TL Spacer 43.80sec Time to complete 1 pcs TL Ceramic 26.10sec Time to complete 2 TIA Submount 43.40sec Total time for 1st pass for 1 Package 208.90 sec Trusted Technology. Creative Engineering
Through put for 2nd Pass Time to complete 2 pcs TIA 42.80sec Time to complete 18 pcs SL Cap 306.00sec Time to complete 8 pcs ESD Cap 136.00sec Time to complete 1 pcs PLC 35.00sec Time to complete 9 SL Cap 153.00sec Time to complete 12 0201 Cap 232.80sec Total time for 2nd pass for 1 Package 905.60sec Trusted Technology. Creative Engineering
3 Days to complete 200 package Time to complete 200 pcs of 1st Pass = 200 x 208.90 sec = 700 min Time to complete 200 pcs of 2nd Pass = 200 x 905.60 sec = 3020 min Conversion time from 1st pass to 2nd Pass 40min Total time is 3760min = 62.67 hours Base on 21 hour per day, that will work out to approximately 3 days Trusted Technology. Creative Engineering