1 / 24

GLAST Large Area Telescope Tracker Subsystem

Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope Tracker Subsystem. 5B: EEE Parts and Electronic Packaging Nick Virmani LAT EEE parts and Electronic Packaging Manager nvirmani@swales.com (202) - 767 - 3455. Outline. EEE Parts Requirements EEE Part Implementation Plan

bernad
Download Presentation

GLAST Large Area Telescope Tracker Subsystem

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gamma-ray Large Area Space Telescope GLAST Large Area Telescope Tracker Subsystem 5B: EEE Parts and Electronic Packaging Nick Virmani LAT EEE parts and Electronic Packaging Manager nvirmani@swales.com (202) - 767 - 3455

  2. Outline • EEE Parts Requirements • EEE Part Implementation Plan • EEE Parts Status • Process Flow for ASICs and MCM Fabrication, Screening, and Qualification • Radiation Testing • Radiation testing Results • Electronic Packaging Program • ASIC and MCM Documentation Status • EEE Parts Issues & Risk Mitigation • Manufacturing and Test Process Flow of TKR Hardware

  3. EEE Parts Requirements • Requirements Summary • Parts screening and qualification per GSFC 311-INST-001, Level 2, • Additional requirements outlined in the LAT EEE parts program control plan, LAT-MD-00099-1 • Review and approve EEE Part Lists. • Derate EEE Parts per PPL-21 • Review and approve derating information before drawing sign-offs. • Perform stress analysis • Parts Control Board (PCB) Approach, a partnership arrangement with NASA/GSFC parts engineer and code 562.

  4. EEE Parts Implementation Plan • Part lists are reviewed and approved by the project PCB prior to flight procurements. • Special considerations include: • Radiation evaluation of all active components • Radiation testing (TID and/or SEE ) when necessary • Parts stress analysis • PIND testing on all cavity devices • Destructive Physical Analysis (DPA), when applicable • Mandatory in process inspections and verification on Multi-Chip Modules (MCMs) and other devices as required • Life Testing if Quality Conformance Inspection (QCI) data within one year of the lot being procured is not available • No pure tin, cadmium, and zinc plating is allowed • Vendor surveillance where required.

  5. EEE Parts Implementation Plan • Special considerations include cont’d: • 50V ceramic capacitors require 850C/85RHlow voltage testing • Mandatory surge current testing on all tantalum capacitors • MCM testing and verification requires special evaluation as outlined in the EEE parts plan • Age control requirements. Lot Date Code (LDC) older than 5 years requires DPA and room temperature re-screen • Parts traceability from procurement to assembly of board and components. • GIDEP Alerts & NASA Advisories review and disposition from selection of parts until subsystem integration. • Parts Identification list (PIL) includes LDC, MFR, Radiation information on the flight lot

  6. EEE Parts Status • The TKR subsystem EEE parts lists have been reviewed by the PCB all parts have been approved except ASIC screening, MCM screening, flex cable screening and qualification, and cristek connectors. • Resettable polyswitch fuse specification LAT-SS-01116-04 was approved by the PCB and will review test data after completion of the tests. • All part test data will be reviewed prior to flight assembly by the PCB where applicable. • The goal is to approve the remaining parts on the parts lists prior to the CDR • Discuss EEE parts availability weekly, to support fabrication schedule. • Perform 100% incoming inspection as per defined procedures.

  7. EEE Parts Status • Performed stress analysis of most of the approved parts on the parts lists and they meet derating criteria after stress application. Will complete the remaining analysis by the CDR. • Perform screening and qualification tests as required per approved procedure. • Hold regular meeting with GSFC Parts Engineer to resolve any parts-related issues and approve parts though the Parts Control Board (PCB). • Attribute data for screening and lot specific qualification/QCI data shall be reviewed for acceptance of parts for flight. • Parts Identification List (PIL) and As-built parts lists is maintained and will be submitted to GSFC.

  8. Process Flow for ASICs and MCM Fabrication, Screening, and Qualification WAFERS RECEIVE FROM MOSIS USING AGILENT PROCESS Wafer Probe 100% Sort dies INSPECTION WAFER LAPPING MOUNT PROCEDURE WAFER SAW PROCEDURE Wafer Probe Procedure 100% INSPECTION PACK DIE IN WAFFLE PACK OR GEL PACK FOR SHIPPING TO TELEDYNE WITH DATA PACKAGE & TRACEABILITY DPA & Scanning Electron Microscope (SEM) Inspection CONTROL MONITORS FOR RADIATION OPTICAL QC GATE SAMPLE RADIATION TESTING 2ND OPTICAL INSPECTION VERIFY ADHESION AND INSPECTION Receive/Inspect ASIC die in waffle or gel packs, PWBs and parts, record data at Teledyne Clean/Bake PWBs as per NASA-STD-8739.3 BOND PITCH ADAPTER FLEX CIRCUIT

  9. Process Flow for ASICs and MCM Fabrication, Screening, and Qualification

  10. Process Flow for ASICs and MCM Fabrication, Screening, and Qualification Clean Die Bonding Surfaces of PWB Plasma and Local cleaning (IPA) Die Attach Monitor Apply Die Attach Material to PWB (MCM) COB Die Placement on the PWB Die Attach Material Cure per Manufacturer’s Suggestions Plasma Clean PWB and Die Bonding Surfaces for Wedge Wire Bonding In Process Wirebond Pull Testing on samples and Monitor Wirebond of ASIC die and MCM PWB Rework, if required 100% Optical Inspection Functional Testing and verification of MCM as per test program * Rework or replace dies if required Encapsulate ASIC die and bond areas Install connectors by hand-soldering * Test all register and memory locations, all I/O functions, including LVDS bias levels, all inter-chip communication, power consumption, all amplifiers by charge injection and test the trigger output, and for excessive noise or instabilities.

  11. Process Flow for ASICs and MCM Fabrication, Screening, and Qualification 100% Inspection Full Functional Testing using configured software test & EGSE Conformal Coat Clean 100% Inspect Pack each MCM individually in the ESD container with pigtail hanging outside of the container for testing Full Functional Testing using configured software test & EGSE 100% thermal cycling –30 to +85 degrees C, unpowered MCM ready functional test & environmental test 100% Dynamic burn-in at 85 degrees C with continuous monitoring for 168 hours 100% Visual Inspection Review results data package Functional Testing

  12. Process Flow for ASICs and MCM Fabrication, Screening, and Qualification 100% Visual Inspection Present data to the Parts Control Board (PCB) Screening & Qualification Store MCM in nitrogen purge storage Obtain approval from PCB MCM ready for next step and sample selection for qualification 100% powered thermal cycling –30 to +85 degrees C, 100 cycles Select 38 MCMs from screened lot Radiograph 2 samples and DPA on 1 sample 100% Dynamic burn-in testing for 240 hours 100% Visual Inspection Thermal Vac testing for 10 samples, 12 cycles 100% Visual inspection

  13. Process Flow for ASICs and MCM Fabrication, Screening, and Qualification Vibration Testing 10 samples 100% Visual Inspection Radiograph CSAM & DPA Functional Testing Review of Data PCB Approval

  14. Radiation Testing • All EEE parts are being reviewed by PCB and screened for radiation susceptibility against the radiation specification defined in GLAST IRD-433-SPEC-001. • Requirements: • Total dose requirement, including standard factor of 2 safety margin is 4.5 Krad (Si) for 5 years behind 100 mils Aluminum. • Our goal is to test all parts up to 10 Krads (Si). • SEE Damage – no SEE shall cause permanent damage to the subsystem.

  15. Radiation Testing • SEE Rate and Effects Analysis: • SEE rates and effects shall take place based on threshold LET (LETth) as follows: SEE immune is defined as a device have an LETth > 37 MeV*cm2/mg • Our goal is to test each part to this specification.

  16. Radiation Testing Results • Radiation testing was performed on engineering parts produced using similar processes and materials. • An earlier version of ASICs tested and met requirements. • No outstanding issues

  17. Electronic Packaging Program • Electronic Packaging, Manufacturing, Test, and Process Control program • Manufacturing, Assembly, and Quality Control of electronic system will be in compliance to the NASA technical standards: NASA-STD-8739.1, NASA-STD-8739.2, NASA-STD-8739.3, NASA-STD-8739.4, NASA-STD-8739.7, and IPC-6012 & 6013. • Rigid MCM PWBs shall meet the requirements of LAT Procurement Specification, LAT-DS-01127-01 based on Mil-PRF-55110, Revision F, and GSFC S-312-P-003 with a minimum internal annular ring of 0.002”. • Flex circuit and cables shall meet requirement of LAT-PS-01132 and IPC 6013 class 3. Coupons shall be submitted to GSFC for evaluation.

  18. Electronic Packaging Program • PWB Coupon will be analyzed by GSFC prior to flight assembly. • Particular attention will be paid to the quality of workmanship, soldering, welding, wiring, marking of parts and assemblies, plating and painting. • Verification of flight hardware will be performed by NASA certified and qualified personnel other than the original operator. • An item inspection will be performed on each component to verify: • Configuration is as specified on each component drawing/specification. • Workmanship standards have been met. • Test results are acceptable

  19. ASIC and MCM Documentation Status • Wafer Procurement from MOSIS / Agilent • LAT-PS-1279: Overview • LAT-PS-1201: Front-end readout chip (GTFE) approved by PCB • LAT-PS-1222: Readout controller chip (GTRC) approved by PCB • LAT-PS-1250: wafer probing, review in process • LAT-PS-01321: wafer lapping, dicing, and inspection, review in process. • LAT-TD-1325: Radiation testing, to be reviewed. • Several other documents such as MCM assembly, SMT assembly, part procurements are in draft format and shall be released by CDR. • Final board prototypes were recently produced and are being tested: • PWB: loaded with parts and new ASICs for functional testing • Pitch Adapter: Teledyne is bonding 3 of them to MCMs to check that the new design works • Bias: sent to Italy for review

  20. EEE Parts Issues & Risk Mitigation • MCM board qualification and handling. • To mitigate this risk, processes, procedures, qualification plan, and vendor verification plan is in process and will ensure they are implemented successfully. • Pitch adapter flex gluing and alignment accuracy when bonding to PWB. • To mitigate this risk, processes will be verified and controls will be implemented at Teledyne. • Flight ASICs testing • To mitigate this risk, all processes and procedures are being approved. Test software is being improved, which will be used for verification. • MCM Assembly and Verification • To mitigate this risk, manufacturing readiness reviews will be performed and mandatory inspection points will be selected.

  21. EEE Parts Issues & Risk Mitigation • Flex Cable to LAT-PS-01132, defines procurement and qualification requirements. • To mitigate this risk EM flex cable will be manufactured to this specification and will be qualified. • A visit to the vendor (Parlex) is planned for early April, together with GSFC representatives. • Flex Cable Assembly. • To mitigate risk a detailed procedure being written & EM flex will be assembled and will be tested prior to flight production. • Radiation Testing & Plans • To mitigate risk GSFC is involved in approving plans but radiation plans yet not approved.

  22. Connectors • Nano-connectors: Omnetics was recently approved and the parts are now on order, including the connector savers. • Micro-D connectors: Kristek connectors are not yet approved, but we don’t expect any difficult issues. On MCM On cable Larger 080 screws

  23. SMT Parts • HV capacitors: Novacap • Procurement spec: LAT-PS-01194 • On order for the Tracker and Calorimeter • Polyswitches: Raychem (Tycho) • Procurement spec: LAT-SS-01116 • A sample lot was already procured and all testing performed, so no surprised are expected in the flight lot • Recently finalized and approved, and the parts are on order • Long process of testing at UCSC and discussions with the vendor • 100% of parts: screening after thermal cycle • 10% of parts: more extensive tests after soldering • Smaller sample for qualification testing at UCSC • Ceramic & tantalum capacitors: approved with no issues • Resistors: approved with no issues • Thermistor: approved with no issues

  24. Manufacturing and Test Process Flow for Tracker Hardware Pre-Production Procurement Fabrication Assembly • Initial Quality Planning • Design Reviews • Critical Components • Documentation Reviews • Lessons Learned • Quality Criteria • Design Requirements • Workmanship Standard • Training and Certification • Pre-award surveys • Supplier Evaluation • Purchase Document Review • Source inspection where applicable • Critical Components • Nonconforming Material Control • Manufacturing Reviews • Work instructions and procedures • Calibration • Process Readiness • Nonconforming Material Control • Inspection • Material Review Board • Audits • Work instructions, procedures, and travellers • Audits • Configuration verification • Inspection Integration & Test Storage & Shipping • Test Readiness Review • Nonconforming material control • Previous Operation Audits • Component Data/Subsystem packages • Test Procedures • Test Monitoring • Data Review • Closeout of open NCMRs. • Storage and Shipping Requirements • Inspection and storage shipping controls • Data Package Reviews • Audits

More Related