HP BY PASS WARM UP. METHODS: (A) Equalising line with orifice (B) Drain line at upstream side of valve connected to downstream side of Main Steam line strainers. Method (A):

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'HP BY PASS WARM UP' - bennett


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
hp by pass warm up

HP BY PASS WARM UP

METHODS:

(A) Equalising line with orifice

(B) Drain line at upstream side of valve connected to downstream side of Main Steam line strainers

slide2

Method (A):

This method results in certain amount of loss of heat energy and increases HP By Pass downstream temperature and some times causes problems in proving emergency operation of HP By Pass.

Method (B):

This method is suitable for short HP By Pass upstream line

suggestions
SUGGESTIONS
  • To effectively warm up Main Steam line it is preferable to take tap off for HP By Pass near to strainer or after the strainer similar to LP By Pass
  • The lines are to be taken to the higher elevation . The horizontal portion of the line to be kept as minimum as possible to prevent condensate collection in the upstream side of HP By Pass
suggestions contd
SUGGESTIONSContd….
  • It is preferable to have a drain pot at the downstream side of individual Hp By Pass with provision to drain condensate through level switches
  • Water collection in the downstream side orifice plate is expected at Simhadri since the orifice dia. is more than the pipe size.Such deviations are to be prevented
slide5

60.3 *12.5 (STUB AT BOTTOM OF THE PIPE)

FE

TE

HP BP VAV

200 MM

TO MAIN STEAM STRAINER DOWN STREAM

Nb 50 LINE

DIRT TRAP

MSL

LOCK OPEN

CRH

HP BYPASS WARMUP SCHEME -1

slide6

60.3 *12.5 (STUB AT BOTTOM OF THE PIPE)

FE

TE

HP BP VAV

200 MM

Nb 50 LINE

MSL

LOCK OPEN

CRH

TO TURBINE FLASH TANK

10M min.

HP BYPASS WARMUP SCHEME -2