Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy. BOTTOM LINE UP FRONT. EST 2000 is: Most advanced/effective/proven simulation … meets total Army requirements including IET. Cost-effective alternative to LMTS and NOPTEL.

bela
Download Presentation

Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engagement Skills Trainer 2000 (EST 2000) Basic Combat Training BRM Strategy

  2. BOTTOM LINE UP FRONT • EST 2000 is: • Most advanced/effective/proven simulation … meets total Army requirements including IET. • Cost-effective alternative to LMTS and NOPTEL. • IET BRM training strategy with integrated EST 2000 is defined … sound & effective. • Can be fielded to ATCs (Knox & Benning) in Oct 03 • If facilities remain tall pole, then ISO containers remain low cost alternative to MILCON.

  3. BR 02 BR 04 BR 05 BR O6 BR 03 BR 01 6 Hours 8 Hours 8 Hours 8 Hours 6 Hours 5 Hours PRELIMINARY GROUPING ZERO DOWN RANGE WEAPONEER FUNDAMENTALS FEEDBACK RIFLE INSTRUCTION BR 07 BR O8 4 Hours 4 Hours FIELDFIRE FIELDFIRE PERIOD 11 BR 09 BR 10 BR 12 BR 13 BR 14 8 Hours 8 Hours 8 Hours 2 Hours 3 Hours 3 Hours PRACTICE PRACTICE QUALIFICATION BURST - ARM - ARM NIGHT RECORD FIRE I RECORD FIRE II ARM - NBC FIRE Basic Combat Training Current BRM Strategy 81 Hours

  4. Basic Combat Training NEW BRM Strategy with EST 2000 75 Hours PERIOD 01 5 Hours PERIOD 02 6 Hours PERIOD 04 8 Hours PERIOD 05 8 Hours PRELIMINARY RIFLE INSTRUCTION FUNDAMENTALS Of RIFLE MARKSMANSHIP GROUPING (Live) ZERO (Live) PERIOD 06 8 Hours LOMAH Down Range Feedback (Live) PERIOD 08 8 Hours PERIOD 09 8 Hours PRACTICE QUALIFICATION (Live) EST 2000 FIELD FIRE 2nd Multiple Exposure PERIOD 03 8 Hours EST 2000 GROUPING/ZERO PERIOD 07 6 Hours EST 2000 FIELD FIRE 1st Single Exposure PERIOD 08 8 Hours PERIOD 10 8 Hours PERIOD 12 2 Hours ARM - NBC EST 2000 QUALIFICATION (Live) GATES

  5. BenningJacksonLeonardwoodKnoxSill BCT 9 24 9 6 6 OSUT 15 9(12) 9 6 SUBSYSTEMS 24 24 18 (21) 15 12 ATCs EST 2000 REQUIREMENTS • 24 x 5-lane EST 2000s (subsystems) available Oct 03 • First 9 subsystems will go to Benning; 15 go to Knox • Benning (9+15), Jackson (24), LW (18) (21), Sill (12) require EST facilities in FY 04/05 … ISO containers can achieve facilities issues • Total EST Container requirement is for 78 x 5-lane subsystems at $3.9M

  6. JACKSONBENNINGLEONARD WOODKNOXSILL BCT BNs 8 3 3 2 2 OSUT BNs 0 5 3 (4) 3 2 EST 2000 REQUIREMENTS ARMY TRAINING CENTERS Total Bns 8 8 6 (7) 5 4 JACKSONBENNINGLEONARD WOODKNOXSILL OCT 03 (FY04) 0 9 0 15 0 OCT 04 (FY05) 12 6 9 0 9 OCT 05 (FY06) 12 9 9 (12) 0 3 Total Fielded24 24 18 (21) 15 12

  7. PROPOSED FIELDING PLAN - 93 ATC Subsystems can be procured over FY03 and FY04 - 78 ATC Subsystems can be placed in 26 Deployable Containers (15 Subsystems will be housed in fixed facilities at Ft Knox) - OPA Funds required/ OMA mix could be utilized

  8. EST 2000 DEPLOYABLE CONTAINER Container Cost Estimates: - 5 Lane Prototype = $60K - 5 Lane Configuration in Production = $50K - 10/ 15 Lane Configuration in Production = $140K * 26 (10/ 15 Lane Configuration Containers) x $140K = $3,640M * 26 (Site Preparation) x 10K = $260K * Total EST 2000 Requirement = $3.9M (UFR) Notes: - Other Procurement Army (OPA) Funds & Operational Maintenance Army (OMA) mix - PEO STRI/ PM GCTT Needs to Develop the Sustainment Requirement/ Profile - Cost are a Rough Order of Magnitude (ROM) Based on Initial Contractor Discussions 2 Container Configurations: - 5 Lane Deployable Container (Prototype Developed) = 20ft x 40ft footprint - 10/ 15 Lane Container = 40ft x 52ft footprint

  9. EST 2000 DEPLOYABLE CONTAINER Recommendations: - Field the Army Training Centers the 10/ 15 Lane Configuration Deployable Container for EST 2000 Marksmanship Training Device: - Pursue as an EST 2000 Program Strategy the use of the Deployable Container as Either the Interim and/ or Long Term Solution to the MCA/ Facilities Requirement where Applicable

  10. MARKSMANSHIP Instructor ratio can be 1:5 - 1:15 Trigger pressure and weapon cant recorded Aim point trace System collects data to help instructor diagnose marksmanship problems Visual feedback to shooters at conclusion of training event Weapons zero recorded and stored for next training session Blue = aim point before round fired Red = round hit target Yellow = aim point after round fired • Supports training of all BRM / ARM skills • 209 Courses of Fire • Post Fielding Training Effectiveness Analysis

  11. CONCLUSION • IET BRM training strategy must transform to include simulations … to remain sound & effective • Integration of EST 2000 with integrated “gated” training strategy will: • Improve BRM skills & feedback • Reduce BRM training periods • Reduce ammunition • Reduce environmental impacts on ranges • EST 2000 meets all Army requirements … supports all Army standard courses of fire.

  12. Tasks for Army Training Centers. Confirm need for shelters, that is, fixed facilities are not available and will not accommodate EST 2000s. Identify number of 5-, 10-, and 15-lane EST 2000 configurations that are required (see total requirement matrix below). Identify minimum weapons required for each configuration. Priority is BRM POI immediate needs with spares. Ensure response concurrence from ATC Commanding General. SUSPENSE: 3 February 2003 Assumption: BCTs will get M16A2s only for their EST 2000s. OSUTs must determine any other weapons needed. An example of this is Fort Knox stated at the brief they would need M16A2s for BCT and a M16/M4 mix with M9s for OSUT. Course of Actions