An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The American University in CairoMechanical Engineering DepartmentToyota Production System (TPS)Presented by: Doaa Abdel AzimMohamed Abdel MotalebOmar El Kholy

  2. Outline Taken from: http://www.gemba.com/uploadedImages/Picture5.png

  3. Background: • Established in 1950s by the Japanese engineer Ohno. • Known as TPS in the 1970s. • It is targeting: Best cost, quality, delivery, empowering people, and minimizing wastes. http://www.optiprise.com/images/Taichii_Ohno_large.jpg

  4. Foundation: • Heijunka: • averages the daily production in order to have smooth production schedules. • averages both the volume and sequence of different model types on a mixed-model production line

  5. Foundation (cont.): • Standardized work: • organizing all jobs and creating an efficient production sequence. • Consists of three components: • Takt time: used to set the rate of production • Working Sequence and Standard sequence of operations in a single process • Standard in-process stock: The least amount of stock on hand that is needed for a process to be completed

  6. Foundation (cont.): • Kaizen • Monitoring quality of the product • Studying the work place • Ensuring the workplace safety to increase efficiency of the worker and the process.

  7. Pillars: • Just In Time: • Eliminates all steps required in production planning • produce the product in the exact time it is required to be completed (not before or after) • minimizes manufacturing wastes (storage, moving…etc)

  8. Pillars (Cont’d): • Components of JIT: • Takt time: to be able to deliver on time • Downstream Pull: customer is the one who “pulls” what he wants from the producer, thus allows the producer to minimize overproduction • One piece flow:one work piece should be moving between different operations within one work cell

  9. Pillars (Cont’d): Example of one piece flow (Taken from: http://www.mamtc.com/lean/building_onePiece.asp)

  10. Pillars (Cont’d): • Jidoka • Jidoka is a quality system built in the process. • concerned with the process of dealing with the faults which may take place during production. http://www.strategosinc.com/jidoka_1.htm

  11. Pillars (Cont’d): • Pakayoke: ”error proofing“ • Searches for the reason of the defect. • Create "error proofing" techniques.

  12. References: • Online, http://personal.ashland.edu/~rjacobs/m503jit.html, accessed 15 May 2005 • Online, http://www.gemba.com/resources.cfm?id=41#P, accessed 10 May 2005 • Online, http://www.mamtc.com/lean/building_onePiece.asp, accessed 18 May 2005 • Online, http://www.plant-maintenance.com/articles/tpm_intro.shtml, accessed 12 May 2005 • Online, http://www.strategosinc.com/takt_time.htm, accessed 10 May 2005 • Online, http://www.swmas.co.uk/Lean_Tools/Takt_Time.php, accessed 13 May 2005 • Online, http://www.toyota.co.jp/en/about_toyota/history/, accessed 5 may 2005 • Online, http://www.toyotageorgetown.com/terms.asp, accessed 7 May, 2005 • Online, http://www.gemba.com/consulting.cfm?id=144, accessed 8 May 2005 • Online, www.kybiz.com/lanereport/issues/november02/toyota.html, accessed 10 May 2005 • Online, www.strategosinc.com, accessed 19 May, 2005 • Online,www.toyotageorgetown.com/terms.asp, accessed 17 May 2005 • Online, www.vorne.com/solutions/learning_center/tps.htm, accessed 12 May, 2005

  13. Thank you very much Any Questions???