1 / 3

CV Experience

CV Experience. Alternatives to T&D Upgrades. T&D Alternatives. Southern Loop after Chester Londonderry Rate Design Special Contracts Targeted DSM T&D lite –var support; new transformer Southern Loop Next Dynamic VAR support for reliability

becca
Download Presentation

CV Experience

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CV Experience Alternatives to T&DUpgrades

  2. T&D Alternatives • Southern Loop after Chester Londonderry • Rate Design • Special Contracts • Targeted DSM • T&D lite –var support; new transformer • Southern Loop Next • Dynamic VAR support for reliability • DR/T (Energy Efficiency/Load Control/Generation) for capacity

  3. Alternatives Cost/Availability • Top Down Analysis (location, location, location;DSM least-cost) • Load Flow • DSM (Collaborative Screening Tool) • DG (Rough Cost Estimates) • Is all available DSM sufficient? • If not, add DG • Next Steps – detailed DR assessments

More Related