An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 Etude de faisabilit Etude de faisabilité é photovolta photovoltaï ïque que Fr Fré éd dé éric Janssens ric Janssens 29 avril 2008 29 avril 2008 Objectif Analyser les caractéristiques techniques du bâtiment et de ses installations en détail. Calculer la rentabilité financière du système. Rédiger le cahier spécial des charges. www.ef4.be 1

  2. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 Contenu 1.Aspects techniques 2.Aspects financier 3.Aspects juridiques et administratifs 4.Etude de cas – Projet Fedesco Aspects techniques • Situation Géographique • Orientation • Inclinaison • Sources d’ombrage • Plan du bâtiment • Contraintes mécaniques • Structure de la toiture • Charges portante • Amiante • Contraintes électriques • Analyse profil de consommations • Raccordement au réseau électrique • Endroit des onduleurs www.ef4.be 2

  3. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 Aspects financiers Prix total de l’installation Prix des CV + primes Prix d’électricité Taux d’ inflation Taux d’ actualisation Taux d’ indexation prix électricité Aspects juridiques + administratifs • Mode de paiement • Gestion des CV • Gestion vente externe électricité • Maintenance du système • Garantie de production • Pénalités • Assurances • Rédaction CSC + contrat www.ef4.be 3

  4. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 Contenu 1.Aspects techniques 2.Aspects financier 3.Aspects juridiques et administratifs 4.Etude de cas – Projet Fedesco 4.Etude de cas – Projet Fedesco Etude de cas – Projet Fedesco • Brasschaat / Bruxelles / Gembloux • Total 3200 m² • Lancement CSC mai 2008 • Installation 2008 - 2009 • Mise en service 2009 www.ef4.be 4

  5. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 Musée des Sciences Naturelles - les acteurs Maitre d’ouvrage Propriétaire du bâtiment Occupant GRD Les étapes de l’étude 1. Visite du site 2. Contact Sibelga 3. Etude du GRD + accord 4. Stabilité de la toiture 5. Autres contraintes 6. Simulation ombrage 7. Schémas d’installation 8. Etude financière 9. Draft clauses techniques 10.CSC www.ef4.be 5

  6. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 1. Visite du site - Bruxelles 2. Contact Sibelga - Bruxelles Peut-on se raccorder sur le réseau? Raccordement interne / externe? Client HT/BT? Type de transfo? Code EAN? Profil de consommation? Profil électrique - Musée Sciences Naturelles 800,000 700,000 600,000 500,000 kW 400,000 300,000 200,000 100,000 0 DATE 80107 160107 230107 310107 70207 150207 220207 20307 100307 170307 250307 10407 90407 160407 240407 20507 90507 170507 240507 10607 80607 160607 Date 230607 10707 90707 160707 240707 310707 80807 150807 230807 310807 70907 150907 220907 300907 71007 151007 221007 301007 71107 141107 221107 291107 www.ef4.be 6

  7. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 3. Etude du GRD - Bruxelles 1. Accord Sibelga pour raccord interne 2. Sibelga installera un nouveau compteur télérelevé 3. Sibelga installera le compteur CV Opbrengst PV (45kWp) vs. verbuik 250000 200000 150000 kWh 100000 50000 0 Januari Juni Mei Juli November Maart Augustus April December September Oktober Februari Opbrengst PV-installatie Verbruik 2006 Verbruik 2007 4 . Stabilité de la toiture - Bruxelles Structure béton ? ? OK Roofing en mauvais état + infiltration eau ? ? Etude destructive • Remplacer la toiture avant de placer le système PV • Prévoir les budgets + CSC • Installer modules flexibles couches minces www.ef4.be 7

  8. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 4. Stabilité de la toiture - Brasschaat Site Brasschaat ? ? Etude de stabilité Bureau de stabilité Matriche Etudier les charges portante de la toiture existante kg/m² Conformité Eurocode 1 5. Autres contraintes 1. Le câblage 2. L’amiante 3. Contrat pour la revente d’électricité ? ? Obligation du GRD ! Opbrengst PV (150 kWp) vs. Verbruik piekuren 18000 16000 14000 12000 10000 kWh 8000 6000 4000 2000 0 Januari April Mei Maart November Juli September Oktober Juni Februari Augustus December Opbrengst PV-installatie Dagverbruik www.ef4.be 8

  9. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 6. Simulation ombrage – Brasschaat Eviter l’ombrage ? ? Perte de rendement !!! 6. Simulation ombrage – PVSYST 1 janvier – 12h45 www.ef4.be 9

  10. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 6. Simulation ombrage – PVSYST 1 juillet – 18h45 7. Schémas d’installation www.ef4.be 10

  11. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 8. Etude financière – Gembloux Coûts 1. Prix installation PV 2. Désamiantage 3. Remplacement toiture Primes 1. Prime à l’investissement (fédéral) 2. CV’s Région Wallonne 3. Vente de l’électricité 8. Etude financière – Gembloux 44 kWp Puissance PV 5000 €/kWp Prix installation 220.000 € Prix total 808 kWh Production énergie / kWp 35.500 kWh/an Production énergie annuelle 30 € / m² Désamiantage Pas prix en compte Remplacement toiture 14,5 % de 33% = 4,8 % de l’investissement Prime fédéral à l’investissement =(5*0.7+5*0.5+34*0.4)/44 0,445 €/kWh CV 15 ans Octroi des CV 0,082 €/kWh Vente électricité 3% Taux d’indexation du prix énergie 2,5% Taux d’inflation 5% Taux d’actualisation www.ef4.be 11

  12. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 8. Etude financière – Gembloux TRS: 4,2 % RSI: 11,5 ans VAN: - 14,045 € Les étapes de l’étude 1. Visite du site 2. Contact Sibelga 3. Etude du GRD + accord 4. Stabilité de la toiture 5. Autres contraintes 6. Simulation ombrage 7. Schémas d’installation 8. Etude financière 9. Draft clauses techniques 10.CSC www.ef4.be 12

  13. PHOTOVOLTAIQUE POUR LES PROS Wépion, le 29 avril 2008 www.altran-europe.be/energy.html \ Olivier Englebert Energy practice manager energie@altran-europe.be GSM: + 32 ( 0) 473 755 009 www.ef4.be 13