An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Network Distribution Center (NDC) Activations July 2009

  2. Agenda • Overview of Network Reengineering • Status of Phase 1 Activation • Accelerated Phase 2-4 Schedule • Customer Impacts • Summary

  3. Overview Network Reengineering • Transformation of Bulk Mail Centers (BMC) to Network Distribution Centers (NDC) • Enhanced mail preparation • Consolidate package distribution • Combine BMC & Surface Transfer Center (STC) containerization and dispatch plans • Leverage multiple trailer loading and dispatching techniques Transformation BMC NDC

  4. NDC Responsibilities • 11 - Tier 1 NDC (Springfield, Philadelphia, Washington, Atlanta, Detroit, Cincinnati, Chicago, St. Louis, St. Paul, Kansas City, San Francisco) • Distribution of local (turnaround) and destination Standard Mail, Periodicals, and Package Services • 6 - Tier 2 NDC (New Jersey, Greensboro, Jacksonville, Dallas, Seattle, Los Angeles) • Tier 1 responsibilities • Distribution of outgoing Standard Mail, Periodicals, and Package Services to the network • Including, MXD States Outgoing single piece sort • STC containerization & dispatch operations – outgoing / incoming Priority, First Class, Periodicals, Standard Mail • 4 - Tier 3 NDC (Pittsburgh, Memphis, Des Moines, Denver) • Tier 1 and Tier 2 responsibilities • Consolidation points for less than truck load volumes from Tier 2 sites

  5. Tiers 1, 2, and 3 • Directional dispatch for 4 NDCs (noted by *) • Reduces backtracking • Improves service • Highlighted indicates Phase I sites • ASFs will be Tier 1 NDC for package processing

  6. Impacts • Operational Impacts • NDCs operate like P&DCs • Live loads and unloads at all NDCs • Operating plan changes required to coincide with STC containerization & dispatch plan • NDC sort to ADCs, AADCs and NDCs • Transportation Impacts • Streamline network • Increase utilization of assets • Improve transit time

  7. Status of NDC Phase I Activation • Activation began on May 18 in New Jersey, Philadelphia, and Springfield NDCs • Phase I was originally scheduled to be completed – 8/07 • Accelerated completion date – 7/17 • Redesign is yielding anticipated benefits • Package Service Performance is up 20.0% • Successful integration of STC & NDC transportation • Beginning to eliminate transportation and reduce workhours

  8. Origin Package Service Improvement from NJ NDC

  9. Accelerated Phase 2 – 4 Schedule • Network fully activated by 11/14

  10. Customer Impacts • Improved Service • No expansion to the number of entry points • No required changes to FAST or Critical Entry Times (CETs) • Minimal changes to origin induction preparation

  11. Mail Preparation • Separation requirements • Local NDC service area • Network NDC split(s) • Multiple splits required for directional dispatch sites • Integration of Origin mail preparation • USPS Retail and BMEU separation enabled through the use of Retail Distribution Codes • Establish customer supplier agreements (CSA) to mirror required make-up during implementation

  12. Summary • Objective –Create a flexible distribution and logistics network to reduce cost and improve the consistency of service • Manage cost –consolidation of outgoing operations (match workhours to workload) • Improve service –reduce cycle time by eliminating some destinating BMC handlings and shared product transportation • Need your help –origin separations to move mail on right network as quickly as possible • Change is needed to keep the network viable for years to come