EOVSA Prototype Review MONITOR DATABASE

EOVSA Prototype Review MONITOR DATABASE. GIL JEFFER. Brand new to your domain, it’s a learning event for me. I’ve read the 2004 CARMA document Dale answered high-level questions At this point, I can’t offer much in the way of specifics. Yesterday’s meeting served as a welcome introduction.

ban
Download Presentation

EOVSA Prototype Review MONITOR DATABASE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EOVSA Prototype ReviewMONITOR DATABASE GIL JEFFER EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 1

  2. Brand new to your domain, it’s a learning event for me. • I’ve read the 2004 CARMA document • Dale answered high-level questions • At this point, I can’t offer much in the way of specifics. • Yesterday’s meeting served as a welcome introduction. • I saw color-coded slides to show status; so I’ll do the same. • Black indicates “Yet to be started” INTRO EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 2

  3. Minimum… • Multicore server with plenty of memory (12 GB+). • RAID 5/50/10 disk subsystem for database storage. • RAID 0 disk subsystem for volatile TempDB. • (memory and fast disk more important than fast CPU) • Downsides… • No redundancy except for disk subsystem. • Any maintenance / failure takes the system offline. HARDWARE RAID 50 RAID 0 EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 3

  4. Better… • Two near-identical systems. • Linked with dedicated 1 GBe crossover cable to ports. • Set up as SQL Replication between systems. • Advantages… • Full hardware redundancy. • Can set up Fallover Cluster; automatic switch on failure. • Distribute loading (collection on one, reporting on other). • Effectively serves are real-time database backup. HARDWARE EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 4

  5. Not Quite Yet!… • Need to study data schema (structure) first. • Need to determine in what way it will be interrogated. • In a way, need to see both ends to design the middle. • Feeding the database… • Can accept many data types (text, binary, XML, etc). • Set up parent/child relational hierarchies (settings/data). • Primary keys to relate tables, records carry timestamps. • Insert (instead of) triggers can help handle processing. • Programming language… • Transact-SQL built into database engine. • Used for ad-hoc queries, triggers, stored procedures, etc. DESIGN EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 5

  6. DESIGN EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 6

  7. Accessing the database externally… • Create executables in most any programming language. • Tabular reports or graphics using any tool/language. • Create web applications • Get data, build in browser • Build on server, deliver to browser • Often determined by which pushes less data across • Reporting tool built into SQL Server… • SQL Reporting Services used to build web-based reports. • Includes tools for tabular, graphic, or gauge reports. • End-user can select data sources, date ranges, etc. • Some examples (from NJIT’s Antarctic AGO stations)… REPORTING EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 7

  8. TABULAR: RptSvcs • Reporting Services… • Builds report on server, delivers it to end-user. • Does not require end-user to download a web app. EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 8

  9. GRAPHICS: RptSvcs EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 9

  10. SPARKLINES: RptSvcs EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 10

  11. GAUGES: RptSvcs EVOSA Project Review Meeting MONITOR DATABASE 24-26 September 2012 11