An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. L4 Housing Economics Course : Housing economic (AE 435) level 5 FALL 2012 LEC 4 : Effecting elements of economics for housing design ( part1)

  2. Life cycle costing

  3. Life cycle costing

  4. Life cycle costing

  5. why do we need LCC? A building is for life not just for the opening ceremony

  6. definition of life cycle costing • Life cycle cost: ‘the cost of an asset, or its parts throughout its life cycle, while fulfilling the performance requirements’ (ISO 55686-5) • Life cycle costing: ‘methodology for systematic economic evaluation of life cycle costs over a period of analysis as defined in the agreed scope’ (ISO 55686-5)

  7. definition of life cycle costing Life cycle costing is therefore • an economicevaluation method • that accounts for all relevant costs • over the investor’s time horizon • adjusting for the time value of money where appropriate

  8. Kuala Lumpur Airport Westin Resort Life-Cycle Cost Analysis (LCCA)‏ A method of economic analysis that sums up, over a given study period, all relevant costs of a building, building system, or building component, in present value (PV) dollars, today’s dollar.

  9. Relevant costs • Construction costs (year zero costs) • Construction, fees, decanting etc • Maintenancecosts • Major replacement, minor replacement, redecorations etc • Operation costs • Cleaning, energy, administration etc • Occupancy costs • Reception, catering, occupants security etc • Endof life costs • Disposal, reinstatement, continued value etc

  10. LIFE CYCLE COSTS 5. Construction 2. Maintenance 3. Operation 4. Occupancy 5. End of Life

  11. LIFE CYCLE COSTS