Sofient Solutions
240 likes | 374 Views
Discover Sofient Works Appliance (SWA) - your virtual shop floor supervisor designed to capture real-time production data and improve operational efficiency. SWA monitors key parameters such as overall equipment effectiveness (OEE), downtime, and production speed, delivering vital insights for informed decision-making. With user-friendly touch screen displays and integrated analysis tools, SWA helps identify productivity issues and enhances overall factory performance. Contact Sofient Solutions in Mohali for more information on optimizing your production processes.
Sofient Solutions
E N D
Presentation Transcript
Sofient Solutions SCF-86, 2nd Floor, Phase XI, Mohali (Punjab)Phone No: 0172-4653667, 099146-86677 “ Sofient Works Appliance ” Email: sachin@sofient.com Website: http://www.sofient.com
Why Sofient Works Appliance Email: sachin@sofient.com Website: http://www.sofient.com
SWA is like a Virtual Shop Floor Supervisor present every where all the time. Email: sachin@sofient.com Website: http://www.sofient.com
Captures All Events “At the Time of Happening” “From the Place of Happening” Email: sachin@sofient.com Website: http://www.sofient.com
Real Time Message Display on Shop Floor Scrolls Current Status on Efficiency and Production to keep People Informed, Involved, and Motivated. Email: sachin@sofient.com Website: http://www.sofient.com
Provides Analysis on following Parameters. • Efficiency (OEE) • Down Time • Production • Speed Rate • Machine Log Email: sachin@sofient.com Website: http://www.sofient.com
How all this helps ? • Helps to find out the key Issues Affecting Productivity. • Helps in appropriate Decision making . • Identifies Production / Engineering Areas Requiring Improvisation • Provides real-time reports for Current Equipment / Production Status locally or at a remote location (Optional) • Link with existing ERP averts manual production data Entry • An Essential Basic TPM Tool for Down Time Analysis • Analytics provide Reports on Production / Down Time / Efficiency by Equipment / Shift / Operator / Product etc. Email: sachin@sofient.com Website: http://www.sofient.com
“SWA” for Liquid Line ? Email: sachin@sofient.com Website: http://www.sofient.com
Liquid Line Layout Filling Sealing De-cartoning Washing Dozing Cap Visual Inspection Sensor 1 Sensor 2 Sensor 3 Touch Screen Monitor for Filling Labeling & Printing Shipping Collator Carton Taping Visual Inspection Visual Inspection Touch Screen Monitor for Packing Sensor 5 Sensor 4 Sensor 6 Common Display Scrolling Current Production Status of both Liquid Lines Email: sachin@sofient.com Website: http://www.sofient.com
Process 1. De-cartoning 2. Bottle Washing 3. Visual Inspection 4. Filling & Sealing 5. Dozing Cap 6. Visual Inspection 7. Labeling & Printing 8. Visual Inspection 9. Collator 10. Carton Taping 11. Weighing 12. Stripping Identified Process for Sensors Email: sachin@sofient.com Website: http://www.sofient.com
Factory Pulse Data Collection Network Factory Pulse in Production Factory Pulse with Plant Head Factory Pulse Server With Prod. Head Sensors Interface Hardware for Liquid Lines On-Line Display For Liquids Area Filling Line 1 Touch Monitor Packing Line 1 Touch Monitor Filling Line 2 Touch Monitor Packing Line 2 Touch Monitor Email: sachin@sofient.com Website: http://www.sofient.com
Provides Quantitative Information on following Aspects • De-cartoned Bottles • Rejection Before Filling • Bottles Filled • Rejection After Filling • Rejection after Labeling • Total Packed for Shipping • Equipment Down Time • Effective Utilization (Efficiency) Email: sachin@sofient.com Website: http://www.sofient.com
Implementation • Master System of SWA Server (Software) will be installed on the PC with Production Head for Data Acquisition. • PCs in Production and PC with Plant Head shall be installed with SWA Reporting and On-Line Status Display Software. • Each of the Two Filling & Packing lines shall be installed with Six sensors for Production data capturing. • There shall be two Touch Screen Monitors on each of the lines, one for Filling and second for Packing for Down Time allocation. • Training to Supervisors and operators on both lines shall be provided by Sofient. Email: sachin@sofient.com Website: http://www.sofient.com
Reports and Analysis Email: sachin@sofient.com Website: http://www.sofient.com
Histogram of OEE Email: sachin@sofient.com Website: http://www.sofient.com
Hourly QEE Email: sachin@sofient.com Website: http://www.sofient.com
Production Analysis Email: sachin@sofient.com Website: http://www.sofient.com
Downtime Analysis Email: sachin@sofient.com Website: http://www.sofient.com
Machine Log Email: sachin@sofient.com Website: http://www.sofient.com
Speed Rate Graph Email: sachin@sofient.com Website: http://www.sofient.com
Thank You Team SWA Sofient Solutions SCF-86, 2nd Floor, Phase XI, Mohali (Punjab)Phone No: 0172-4653667, 099146-86677 Email: sachin@sofient.com Website: http://www.sofient.com