QuickZone — A Work Zone Delay Estimation and Analysis Tool PowerPoint Presentation
Download Presentation
QuickZone — A Work Zone Delay Estimation and Analysis Tool

Loading in 2 Seconds...

play fullscreen
1 / 24

QuickZone — A Work Zone Delay Estimation and Analysis Tool - PowerPoint PPT Presentation


  • 185 Views
  • Uploaded on

QuickZone — A Work Zone Delay Estimation and Analysis Tool. Matthew H. Hardy Senior Transportation Engineer Mitretek Systems James J. Larkin Senior Transportation Engineer Mitretek Systems Karl E. Wunderlich, Ph. D. Senior Principal Analyst Mitretek Systems. What is QuickZone?.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'QuickZone — A Work Zone Delay Estimation and Analysis Tool' - ayoka


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

QuickZone —

A Work Zone Delay Estimation and Analysis Tool

Matthew H. Hardy

Senior Transportation Engineer

Mitretek Systems

James J. Larkin

Senior Transportation Engineer

Mitretek Systems

Karl E. Wunderlich, Ph. D.

Senior Principal Analyst

Mitretek Systems

what is quickzone
What is QuickZone?
  • Work Zone Delay Impact Analysis Tool
    • FHWA-sponsored
    • Developed by Mitretek Systems
    • Available for purchase at McTrans ($200)
  • Microsoft Excel-based Application
  • Open Source Code for the Ability to Customize
  • Targeted at State and Local Traffic Construction Staff, Operations and Planning, and Construction Contractors
quickzone capabilities
QuickZone Capabilities
  • Quantifies corridor delay resulting from capacity decreases in work zones
  • Identifies delay impacts of alternative construction phasing plans
  • Supports Trade-Off Analyses between construction costs and delay costs
  • Considers Alternate Phasing Schedules:
    • Location along mainline
    • Time-of-day (peak vs. off-peak)
    • Season (summer vs. winter)
  • Assesses Impacts of Delay Mitigation Strategies:
    • E.g., Variable message sign deployments
    • Signal retiming on detour routes
slide4

QuickZone Analysis Process

Little Bras d’Or Bridge

Highway 105

Gerard Kennedy, P.Eng

Project Engineer, NS DOT&PW

  • Key bridge under repair
  • Capacity limited because of two-way, single lane operations
  • Work coincided with peak of travel season
  • Significant community concern about delays
slide7

Newfoundland

Boularderie Island

Great Bras d’Or

(Seal Island) Bridge

Little Bras d’Or

Bridge

Trans Canada

Highway

slide9

Bridge

Site

slide14

NODES

LINKS

6

1

5

1

2

3

4

2

Inbound

3

4

Work

Zone

exurban freeway application knoxville tn quickzone network

Mainline

Detour

Exurban Freeway ApplicationKnoxville, TN QuickZone Network

I-140

Cedar Bluff

Harden Valley Road

Lovell Road

N. Campbell Station

Parkside

I-40/I-75

Work Zone

US-70

quickzone partnership program
QuickZone Partnership Program
  • Partnership Between the FHWA and State or Local DOT
    • Takes Advantage of QuickZone’s Open Source Code
  • Designed to:
    • Further Improve the Software
    • Provide State and Local DOT with a Tool that Best Meets their Needs
  • Current Partners
  • Wisconsin DOT
  • Washington DOT
  • Utah DOT
  • Maryland SHA
  • Pennsylvania DOT
  • Ohio DOT
  • North Carolina DOT
how can quickzone be customized
How Can QuickZone be Customized?
  • State-specific queue-length estimation
  • Additional mitigation strategies
  • More detailed detour route volume assessment
  • Custom capacity reduction for work zones
  • Different calculations for user delay, queue estimation or cost analysis
  • Ability to import networks from other transportation modeling and simulation packages
exercise 1
Exercise #1
  • Nova Scotia Bridge Deck Replacement Case Study
slide22

5

8

4

6

7

7

18

12

6

17

11

5

3

16

4

10

3

15

1

2

1

9

2

13

14

8

slide23

5

8

4

6

7

7

10

18

12

5

12

9

6

11

6

17

7

11

5

3

16

4

10

3

15

1

2

1

9

2

13

14

8