200 likes | 535 Views
Capital Improvement Program Overview. Capital Improvement Program is a tool for:Planning Long Term (20 years)Capital ProgramsExisting AssetsAdded, New AssetsPrioritizing ResourcesMission Critical, Mission Support, Mission EnhancementDetermining Impacts From ChangesMARTA Priorities
E N D
1. Monday, February 5, 2001 Capital Improvement Program andCondition Assessment Program A Briefing for MARTA Management Presented by:
Richard Boullain, MARTA
Troy Cowan, PB Facilities
2. Capital Improvement Program Overview Capital Improvement Program is a tool for:
Planning Long Term (20 years)
Capital Programs
Existing Assets
Added, New Assets
Prioritizing Resources
Mission Critical, Mission Support, Mission Enhancement
Determining Impacts From Changes
MARTA Priorities & Policies, Gov./GRTA/GASB policies, Funding and Grant Programs, Significant External Events, Disasters/Emergencies
3. Capital Improvement Program Model
4. *PB Inspectors assess the visual condition of the asset and do not include testing or measuring of equipment and systems Condition Assessment Study
5. Condition Assessment Study
6. Condition Assessment Study
7. Condition Assessment Study
8. Condition Assessment Study Methods for Assessing Condition
Inspections for Selected Assets
Stations, Bldgs, Maintenance Facilities, Garages, Shops, HVAC, Electrical
Sampled: TPSS, GBSS
Verified MARTA Inventory List: Electrical, HVAC
Data From Existing Studies
Facilities Assessment Study (FAS), Sizemore Floyd Architects, (1996)
FAS Update (September 2000)
Financial Capacity Study, KPMG Consulting, LLC (1998)
9. Field Assessment Photos
10. Field Assessment Photos
11. Field Assessment Photos
12. Condition Assessment Study Buildings
Mechanical
Traction Power
Vehicle Servicing Equipment Track
Structures
Fare Collection
ATC
Other Structures
Signage
Why we didn’t assess everything
Duplication
Efficiency
or
Assessment doesn’t add much to rehab/replace decisionWhy we didn’t assess everything
Duplication
Efficiency
or
Assessment doesn’t add much to rehab/replace decision
13. Condition Assessment Study Condition Assessment Study (CAS) Report includes:
CAS Database
With current condition snapshot
Proposed Rehab/Replacement Cycle and Cost
Suggested Maintenance Actions
Requiring Immediate Attention
Recommendations
14. Condition Assessment Study Completed Actions to Date
Completed Stakeholder Meetings
Acquired Asset Inventory Files
Pilot Inspection Checklists
Pilot Inspections
Final Inspection Checklists
15. Condition Assessment Study Completed Actions to Date (cont.)
Review of Pilot Inspection Results
Inspections Checklist Update
Data Collection
Proposed Replacement Model Review
Performed Inspections
Report of Preliminary Results
Final Report Delivery
16. Condition Assessment Study Analysis Based on Review of
3,522 MARTA ‘s Assets & Sub-levels (system, component, type)
1,105 Assessed by Condition (535 by PB, 570 by MARTA)
2,417 Assessed by Age
Summary of Infrastructure Included
17. Condition Assessment Study Analysis Resulted in 40 Year Projections of
13,117 Rehab and Replacements Actions
Each individually priced & scheduled
$5.5 Billion 40-Year Total Cost
Shown in Current Year Dollars
$138.6 Million Average Annual Cost Shown in Current Year Dollars
$370.9 Million in Current Backlog
Annual Average Does Not Include Backlog Work-Off Plan
18. Condition Assessment Study Findings To Date
Excellent Support from MARTA Personnel
Issues in Obtaining Asset Inventory Data
Existing Inventory
Multiple data sources, with no common cross-reference
Cumbersome data reporting, complicating access to data
Significant amounts of incomplete, outdated data found in key parameters
Asset Breakdown Structure
Developed categories for assets in inventory
19. Condition Assessment Study *Projections use the mid-range of unit costs.*Projections use the mid-range of unit costs.
20. Condition Assessment Study *Look-ahead, 10-year average: for each $ value, add the cost projection for the next 10 years and divide by 10.
High End: Calculated using the higher end unit costs.
Mid Range: Calculated using the mid-range unit costs (these were used in the CA Projections Chart)
Low End: Calculated using the lower end unit cost.
20 year average - Mid-Range: Total of cost projections from 2001 - 2020 divided by 20.
40 year average - Mid-Range: Total of cost projections from 2001 - 2040 divided by 40.*Look-ahead, 10-year average: for each $ value, add the cost projection for the next 10 years and divide by 10.
High End: Calculated using the higher end unit costs.
Mid Range: Calculated using the mid-range unit costs (these were used in the CA Projections Chart)
Low End: Calculated using the lower end unit cost.
20 year average - Mid-Range: Total of cost projections from 2001 - 2020 divided by 20.
40 year average - Mid-Range: Total of cost projections from 2001 - 2040 divided by 40.
21. Condition Assessment Study Follow-on Needs
Define Priorities for Ranking Rehabilitation and Replacement Requirements
Improved Asset Information Systems
Methods to Acquire and Maintain Asset Data
Inventory, Condition, Capability and Capacity
Updated Asset and Business Management Practices