Tier i working group 1 st quarter fy 2010
Download
1 / 21

Tier I Working Group 1 st Quarter FY 2010 - PowerPoint PPT Presentation


  • 144 Views
  • Uploaded on

Tier I Working Group 1 st Quarter FY 2010. March 5, 2010. Overview. Rollup of 1 st Quarter FY 2010 Tier I Inspection Findings BHSO Issue Database Trending Report (P. Sullivan) Buildings Where Complete Panel Directory Updates Will Be Done (M. Paquette)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Tier I Working Group 1 st Quarter FY 2010' - avram-carrillo


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Tier i working group 1 st quarter fy 2010

Tier I Working Group 1st Quarter FY 2010

March 5, 2010


Overview
Overview

  • Rollup of 1st Quarter FY 2010 Tier I Inspection Findings

  • BHSO Issue Database Trending Report (P. Sullivan)

  • Buildings Where Complete Panel Directory Updates Will Be Done (M. Paquette)

  • Facility Operations Center Update Funded OSHA Work (M. Paquette)

  • New Tier 1 Database –Category/SubCategory

  • Finalize Fire Safety Checklist

  • Exit Sign Criteria (J. Levesque)

  • Preliminary Cryogen Guide (M. Gaffney)

  • Location of Floor Mats

  • Unsecured Buildings (M. Delph)

  • Requirements for Non-Functional Eyewash Stations


Rollup of 1 st quarter fy 2010 tier i inspection findings
Rollup of 1st Quarter FY 2010 Tier I Inspection Findings






Bhso issue database trending report
BHSO Issue Database Trending Report

BHSO Issue Trends


Facility operations center update funded osha work panel directory updates
Facility Operations Center UpdateFunded OSHA Work Panel Directory Updates

OSHA Work

Panel Labeling


New tier 1 database status
New Tier 1 Database - Status

  • Several requirements for new database requires significant programming or upgrade to Maximo

    • Reminder notices (14, 30 day)

    • Workflow

    • Review/update/approve “draft” Tier I Inspection Reports (Release authority)

    • Notification to Action Owners

    • Report drafting and approval

    • Scheduling

  • Maximo update into PPM for contracting

    • Anticipate 2 months for upgrade



Finalize fire safety checklist
Finalize Fire Safety Checklist

Fire Safety Checklist


Exit sign criteria
Exit Sign Criteria

Exit Sign Criteria


Preliminary cryogen guide
Preliminary Cryogen Guide

Preliminary Cryogen Guide


Location of floor mats
Location of Floor Mats

Location of Floor Mats


Unsecured buildings
Unsecured Buildings

Unsecured Buildings


Requirements for non functional eyewash stations
Requirements for Non-Functional Eyewash Stations


Requirements for non functional eyewash stations1
Requirements for Non-Functional Eyewash Stations

  • Procedure prescribed in Chemical Safety Subject Area

    • See Exhibit entitled Permanent Procedure for Interim Administrative Controls in Case of Eyewash or Safety Showers Pathway Deficiencies

  • Procedure Purpose

    • Interim administrative control for a deficient ANSI Z358.1 eyewash/shower pathway

      • Access to a safety shower and eyewash must be barrier-free


Requirements for non functional eyewash stations2
Requirements for Non-Functional Eyewash Stations

  • Use procedure only when the following options are not feasible :

    • Discontinue corrosive chemical use

    • Move corrosive chemicals to an area with appropriate eyewash and safety shower

    • Install temporary eyewash and safety shower compliant with ANSI 358.1 design and capable of 15 minute flush

    • Install ANZI Z358.1 compliant plumbed eyewash and shower equipment


Requirements for non functional eyewash stations3
Requirements for Non-Functional Eyewash Stations

  • Applicability

    • When eye/skin corrosives handled in closed containers or used outside containers in process that is not splash/vapor proof and:

    • Eyewash or safety shower is not located within the contiguous room, and

    • There is an obstruction in the pathway to the eyewash/shower equipment. Obstructions include doorways, stairs, equipment, supplies, or furniture, and

    • There is a shower and eyewash accessible within 10 seconds (and 50 feet) with limited/no vision with the only obstruction being a door.


Requirements for non functional eyewash stations4
Requirements for Non-Functional Eyewash Stations

  • Interim Administrative Procedure

    • Keep door open;

    • Post sign;

    • Train workers;

    • Include in ESR/Work Planning

  • See Exhibit in Chemical Safety Subject Area for exact procedure, applicability and limitations


ad