HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY. ELECTRICITY. Hyde Park Towers. Energy audits subsidised through the NSW Office of Environment & Heritage’s Energy Saver program. Consumption 30\% v Network & other charges 70\%. LIGHT LEVELS BEFORE UPGRADES. SUSTAINABILTY INITIATIVES TO DATE.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'HYDE PARK TOWERS COST SAVINGS/SUSTAINABILITY' - aurek


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide2
Hyde Park Towers

Energy audits subsidised through the NSW Office of Environment & Heritage’s Energy Saver program.

sustainabilty initiatives to date
SUSTAINABILTY INITIATIVES TO DATE
  • November 2010 Installed Power Factor Correction Equipment
  • August 2011– Approval for LED Upgrades at Annual General Meeting
  • September 2011 –156 Fluoro Lights in Fire Stairs converted to 82 LED multi function sensor lights
  • November 2011 – Converted 262 x 35w Halogen down lights
  • to 7w LED globes on residential levels, gym, pool and lobbies
  • February 2012– Converted 307 Fluoro Lights in Car Park
  • from T8 to T5 Eco Savers Kits
  • June 2012 Completed LED Upgrade
  • July 2012 Adjusted Variable Speed Controllers - TOU
  • March/April 2013 Installed 4 new Hydraulic Water Pumps Sets
conversion cost energy saving certificates
Conversion Cost/Energy Saving Certificates
  • Fire Stairs Multi Function LED
  • Project Cost = $28,750.00
  • Generated 858 ESC’s = $18,000
  • Net Cost = $10,750.00
  • LED LIGHTS IN COMMON AREAS
  • Project Cost = $9,633.00
  • (Not eligible for ESC’showever power savings significant)
  • T8-T5 CAR PARK CONVERSIONS
  • Project Cost = $8,018.00
  • ESC Rebate = $4,650.00
  • Net Cost $3,330
  • Total Project Cost After ESCs = $23,713
no initiatives
NO INITIATIVES?
  • $15,400
  • PER MONTH
  • $184,000 per year
  • Budget $117,000
slide13
What is Power Factor Correction?

Power Factor is the ratio of “useful” power to “total” power consumed.

In simple words Power Factor is a measure of how efficiently electrical power is consumed.

The ideal Power Factor is unity - or one. Anything less than one, (or 100% efficiency), means that extra power is required to run equipmentand a significant amount of wastage occurs.

no initiatives1
NO INITIATIVES?
  • $15,400
  • PER MONTH
  • $184,000 per year
  • Budget $117,000