An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENGINEERING PROCESS MONITORING FOR CONTROL ROOM OPERATION GTPMGestion Technique d’une Panne Majeure Mario Bätz CERNST-MO-TC

  2. GTPM - Objectives • Improvement of collaboration and understanding PCR-TCR (roles & resp.) • Reduction of the SPS restart time after major breakdown • Monitoring documents for the SPS restart (logic of SPS restart, process description, instructions etc.) • A structured method, which can be generalized to future projects

  3. Gestion Technique d’une Panne Majeure - GTPM • Control Room Representatives • PCR, TCR, MCR, (CRN) • Control specialists • ST/MO, SL/CO, SL/OP, ... • Equipment specialists • ST/EL, ST/CV, LHC/VAC, …

  4. Accelerator Oriented Monitoring:Systems, Interaction & Data Electricity HT, MT, BT, Access Technical breakdowns GTPM • Major breakdown (alarms, logbooks,…) • System identification • System interdependency • Restart objectives • ... Water Pumping Stations, Raw, Prim, Chilled, Demi, ... Monitoring Hardware, Software, network ... Thermal Air-conditioning, Ventilation SL timing, power supplies, magnets, ... Vacuum Pumps, Pressures CPS

  5. Example SPS Restart Diagram

  6. Example TCR Restart Diagram

  7. Monitoring System • Dynamic “restart diagrams” • UMMI’s in PVSS • Drivers for various data sources • TDS, electricity, vacuum, access, transfer lines, timing, power converters, ... • SAME tools in PCR,TCR, MCR,…

  8. PVSS Implementation

  9. Added Value • All control rooms work with the same information • Breakdown impact at one glance-> faster situation assessment • Optimised restart strategy (priorities, order) • Shorter restart time • Visual system documentation for training

  10. Outlook / next steps… • Use paper tools in operation this year • Assess improvement • Finish PVSS implementation • Formalise and document the method • MCR asked for same project shutdown2001/2002 and 2002/203 • Promote results and method for LHC operation