June 24 , 2013. All Experimenters ’ Meeting. Shutdown 2012 - 2013. Machine Status: NTF Treatments and Dosimetry as scheduled Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster Main Injector Power Supply studies on weekends

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'All Experimenters ’ Meeting' - atara


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
shutdown 2012 2013
Shutdown 2012 - 2013

Machine Status:

  • NTF Treatments and Dosimetry as scheduled
  • Proton Source Commissioning and Studies
    • RFQ Injector Line (RIL)
    • Linac
    • Booster
  • Main Injector
    • Power Supply studies on weekends

TeV & Muon Rings – Partially available for tours with approval and appropriate training

mss bypass project impact areas
MSS Bypass Project – Impact Areas
  • Project Completion Date
    • July 17th – July 25th
  • A0 Parking Lot Work
    • May 28th – June 26th
    • Install new pad and switches
    • TeV road closure at A1 (Monday, July 1st or Tuesday, July 2nd from 0700-1530)
    • TeV road reduction at A1 (Thursday, June 20th for about 3 weeks during cable terminations)
    • Power off to A1, A2, & A3 (Daily for ~ 3weeks)
    • Pave parking lot on Tuesday, June 25th
mss bypass project impact areas cont
MSS Bypass Project – Impact Areas Cont.
  • CHL
    • ~5 day outage/reduction (only house power available)
    • Monday, June 24ththrough Friday, June 28th
    • Two 5 minute power outages needed
    • Monday, June 24th @ 0730 – 0735 (Completed)
    • Friday, June 28th @ 0700 – 0705
    • Cable pulls and splices in PMH 210
  • Meson
    • Two 15 minute outages one week apart
    • Monday, June 17th @ 0700 – 0715 (Completed)
    • Monday, June 24th@ 0700 – 0715 (Completed)
    • Monday, June 24th @ 0815-1215 (Bonus MCC-2 outage @ MS3)
    • Cable pulls and splices in PMH 110
    • Impacts MCC, Holometer, MW9, all enclosures, systems, and buildings
kautz road substation
Kautz Road SubStation
  • Status
    • MI backfed from Master SubStation
      • Using Feeder 45 for MI conventional power which is normally T85 on KRS
    • We ordered 6+ new surge arrestors (4.7k each) from Hubbell and wait for delivery in 8-9 weeks
    • Schedule a ~1-2 day KRS outage (not really an outage, we can’t run power supplies) to replace all surge arrestors on transformers T85 & T87
    • There will be a 20 minute outage to remove the backfeed after the surge arrestors are installed
shutdown 2012
Shutdown 2012

Schedules and Links:

Schedule can be accessed from the Operations Home Page

- Schedules -> Operations Schedule

Direct link to schedule

- http://www-ad.fnal.gov/ops/schedule.html