Building for Air Tightness

The Building Regulations Approved Document Part L1A require that new build developments, must be built with air tightness in mind with a focus on the conservation of fuel and power. For more details about our services, contact Ashby Energy Assessors Limited.

ashbyenergy
Download Presentation

Building for Air Tightness

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 1 Building for Air Tightness Building Regulations Compliance The Building Regulations Approved Document Part L1A require that new build developments, must be built with air tightness in mind with a focus on the conservation of fuel and power. This is mandatory for any new build development but can also be applied to existing buildings as part of an energy assessment, which can reduce the buildings energy usage and improve the EPC rating for the building. Air Pressure Testing Air Tightness Testing is a process of pressurising or depressurising a building, measuring the air flow during the test, and using this data to calculate the air tightness of the building. This must be undertaken by an accredited and competent person using equipment which is designed for air tightness testing and calibrated for accuracy. https://www.ashbyenergy.co.uk

  2. 2 Preparing for the test Air tightness testing must be considered at every stage of a build, from design, al the way till hand over. Incorporating air tightness into the design of a building will massively improve the chances of compliance on the first test. Ensuring that tradesmen who are skilled, follow the design and that at every fix stage, the quality of their work is checked. General Requirements All plaster work must be finished, and skirting boards fitted All external doors and windows fitted All plug sockets, light fittings and any other fittings finished All loft hatches must be in place 240v electricity must be connected Water must be running Before we arrive on site, we will require: Scaled or dimensioned, up to date plans with onsite construction. Both plans and cross sections of the property. To accurately work out if you have passed your air pressure test on site, we require the Air Permeability figure. This figure normally between 2 and 10 is found on the individual SAP calculations for each specific dwelling. To pass your test your results are required to be equal to or below this figure. To maximise the chances of passing on the first test: All skirting board should be sealed along the top and the bottom if plasterboard is fitted with dot and dab. Ensure that individual plasterboards have a continuous line of dot and dab around the top, sides and bottom. All sockets and light switches are fitted (Ideally dot and dab around each socket) Ensure any penetration made within a kitchen or bathroom for plumbing and electrical purposes are sealed to ensure no air leakage can come from the gap created. Ensure lights fitted to the ceiling are airtight and will not allow air to be drawn through the light itself. Ensure loft hatches are fitted correctly along with its draught seal. For rooms in the roof - Any cupboard provided that is exposed to the roof space must have a door seal and be correctly fitted to prevent it from opening during the test. Where spotlights are fitted in the ceiling ensure they are sealed units. Ensure that windows and doors are fitted correctly with no air leakage. Ensure all windows and doors have draught seals fitted. Ensure no cracks / gaps between the window / door frame and the opening. https://www.ashbyenergy.co.uk

  3. 3 Ensure service voids are completely sealed therefore preventing any air leakage. After the Test Once the test is complete weather your score is a pass or fail, Ashby Energy will provide you with a certificate with your result. Providing the result passes, this can then be passed on to the SAP assessor and building control to complete any other certificate of the building. But all is not lost if the result has failed the target requirement, as using the depressurising method of air tightness testing it is possible to diagnose and resolve air tightness issues. Using none temporary sealing methods or addressing critical design elements for alteration, we will do our best to help your building gain compliance. For more details about our services, contact to Ashby Energy Assessors Limited. Contact Details Ashby Energy Assessors Limited Address: The Lodge, Friars Well Estate, North Dr, Wartnaby, Melton Mowbray LE14 3HQ, United Kingdom Phone No.: 01476 870504 Email: info@ashbyenergy.co.uk Website: https://www.ashbyenergy.co.uk https://www.ashbyenergy.co.uk