The Concurrent Design Facility was an initiative of and sponsored by

General Studies Workshop GSP / CDF Concurrent Design Facility Activity Report and Plans ESTEC - 14 September 2006 M. Bandecchi - TEC-SYE Concurrent Engineering section. The Concurrent Design Facility was an initiative of and sponsored by the General Study Program in 1998

Download Presentation

The Concurrent Design Facility was an initiative of and sponsored by

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. General Studies WorkshopGSP / CDFConcurrent Design FacilityActivity Report and PlansESTEC - 14 September 2006M. Bandecchi - TEC-SYEConcurrent Engineering section GSP workshop

  2. The Concurrent Design Facility was an initiative of and sponsored by the General Study Program in 1998 It became a TEC operational facility in 2000. GSP workshop

  3. Activities performed • 60+ (potential) future missions studied and designed internally at pre-Phase A, conceptual, system level • 3 new launcher concept design • 8 complex payload instrument design (IDA), incl. Platform, system, mission • 10 reviews of Industrial Phase A studies (internal + Industry) • 5 ISS on-board facilities/experiments accommodation studies; teaming with/supporting Industry in Phase A • Joint studies (Distributed Concurrent Engineering) with NASA/JPL/PDC-Team X, CNES CIC, Industry • Educational, training, promotion and standardisation activities Other figures: • 270 currently registered users • 497 ESA specialists, scientists, study/project managers have used the CDF • 55000 hours of CDF server desk-top provided in 1 year (Sept.05-Aug.06) • Hundreds of visitors every year (e.g. 800 in 2004) Achievements GSP workshop

  4. GSP workshop

  5. Spin-off • Request to transfer CDF know-how and software tonational Agencies, Industry, Academia. • Core CDF model (IDM) delivered to CNES, ASI, CSA, various industries, being subject of an ECSS standardisation exercise: ECSS E-10-01 (“TM”) How influential have we been? Based on the CDF model, the following facilities have been (are being) created: • CNES CIC 2005 • ASI CEF 2006 pl. • AAS (F) “Cannes” CDF 2006 pl. • Un. Sapienza Rome CDF 2006 • EPFL (CH) CDF 2006 pl. • VSSEC (Aus) CDF 2006 GSP workshop

  6. CDF Customer Distribution2001 - 2005 Launchers Earth Observation 6% Science 6% 31% MSM / ISS 13% Science GSP Aurora / Exploration MSM / ISS Earth Observation Launchers Aurora / Exploration GSP (*) 27% 17% Overall activity 80% GSP funded (*) GSP direct GSP workshop

  7. Studies planned in 2006 • EOP: • XMWR: modelling activity for a LEO cross track MicroWave Radiometer • SCI: • REIS: Review of Europa Industrial Study • WFI: Wide Field Imager • FIM: Far Infrared Mission • LAU: • Socrates 2 • GSP: • DCP: Dual cryogenic propulsion study • SOC: System on Chip • FBW: fly by wireless • DMA5: A5 Dual mission launches • RamELEC: Ram Electric propulsion thrusters for very low orbit observation satellites and planetary exploration • HME: • Phobos Sample return GSP workshop

  8. Looking for new applications of CDF and CE Application of CE to later phases and to a large community New technologies Implementation for future missions Model technologies development • - GSP contract • on application of CE • to anomaly treatment • GSP CDF study: • NEO review of phase A GSP contract on instrument modelling • GSP CDF studies: • Fly by wireless • in flight demonstration • Combined long term • cryogenic propulsion • for interplanetary mission GSP workshop

  9. Plans • Consolidation of the CDF Integrated Design Model (IDM) – creation of a ‘product’ IDM - to be able to distribute it to the institutional partners • Extension of the CDF service to other Customers / Programmes (e.g Telecom), developing/integrating related tools and competences • Application to new mission and system concepts (e.g. system on chip), developing new specific models and architectures • Creation of an European distributed concurrent / collaborative environment to favourite the application of Concurrent Engineering to later phases of the project life-cycle. • “GRID-based Distributed Concurrent Design” on-going TRP project for the study and prototype of a Virtual Distributed Design Facility, GRID based GSP workshop

  10. GSP workshop

More Related