Playground Project for Wellton Elementary School

Help Wellton Elementary School by purchasing and installing a playground structure for pre-school and elementary children. Also includes repurposing a swing set, installing a shade structure for the play gym, and painting a map of the USA outside the cafeteria. Project dates: December 11th, 12th, and 13th. Addressing outstanding issues and budget limitations.

arlenehayes
Download Presentation

Playground Project for Wellton Elementary School

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Wellton Elementary School / Fort Yuma Rotary Project29126 San Jose Ave, Wellton, AZ 85356

  2. Fort Yuma RotaryWellton Elementary School Project Purchase and install a playground structure for pre-school and early elementary children Playground structure Repurposed Swing Set and Slide Shade Structure for Play Gym Set Paint a Map of the USA outside Cafeteria Repaint sidewalk paw prints & hopscotch Project dates: December 11th, 12th & 13th.

  3. Areas designated for Play Structure & Additional Swings

  4. Areas designated for Play Structure & Additional Swings – alternate view

  5. Play Gym Structure – Proposed option (not finalized)

  6. Double Swing SetRefurbish, Paint and Install similar style swing set.Swing sets to separate larger play area from the new play structure for pre-school children

  7. USA Map – Proposed area to paint

  8. USA MAP – Arizona Sparkles

  9. Outstanding Issues to be addressed Play Gym structure design to be finalized Swing Set required to be stripped and painted School uses wood mulch for Fall zone material Wood mulch is cost prohibitive vrs Pea Gravel Alternatives are being sought Budget limitations may require to chose between shade structure and fall zone material. Wellton Elementary School / Fort Yuma Rotary Project