html5-img
1 / 28

Australia: Best Practices

Australia: Best Practices. Canberra, Goulburn, Sydney, Melbourne, Brisbane, Perth SE and SW are agricultural areas Population very urbanized: most in large cities near coast >~1 million or others in towns <~10,000 (Few cities of ~100,000). Australia: water. World’s driest inhabited continent

arawn
Download Presentation

Australia: Best Practices

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Australia: Best Practices

  2. Canberra, Goulburn, Sydney, Melbourne, Brisbane, Perth • SE and SW are agricultural areas • Population very urbanized: most in large cities near coast >~1 million or others in towns <~10,000 (Few cities of ~100,000)

  3. Australia: water • World’s driest inhabited continent • Droughts common: world’s largest per capita constructed water storage • Droughts (& floods) becoming more severe, esp. in SE & SW corners. Global warming? • Yet use ~280L/c/d, 3rd after US/Canada, almost double Netherlands

  4. Australia: gov’t • Federal nation like Canada • Wealthy elderly paternal national gov’t, impoverished child states • Not nerdy somewhat well-off older brother tolerated when his money or brains are useful, not always well loved otherwise • Cities quite weak (Brisbane exception)

  5. Goulburn • Inland city of 22,000 • 1 hour NE of Canberra, 2 hrs SW of Sydney • Big Merino: agricultural area • Industries: abbatoir, wool-scouring • Maximum security prison

  6. Pejar Dam April 2004Goulburn’s principal water supply

  7. Lake Pejar • Worst drought in 100 years • 5 yrs ago, 10m deep, 1000 ML water • May 20 2005: 8% capacity, possibly gone by end of year

  8. Pejar May 2005 What to do? • Close or move town? • Move water by truck or rail? • Move 300 max. security prisoners? • Close industries?

  9. What they did: emergency • Closed swimming pools: kids shuttled to Canberra by bus • Closed sports grounds: injuries on hard ground • Townfolk: 100 second shower limit • Prison: 70 inmates shower in an hour • May: people asked to use <150L/day (=15 minute shower) • June: 120 L/day (washing machine full) • Per capita use was <1/2 that 3 yrs ago • Biggest businesses reduced water use by 1/3 despite concerns re meeting cleanliness standards for export

  10. What they did not do • Close industries - town would die • Use truck/railcar to bring water - has worked in small communities of a few hundred, not at this scale 4 million L/week

  11. Effect of drought on farms • Some compensation from Canberra • Some farmers sold livestock • Concerned about paying back money borrowed to continue

  12. What they did: response • Bores dug for C$1.5 million, ->5 million L/day, enough for 6 months • Planned a C$3 million pipeline to nearby river • Considering drinking re-treated sewage treatment plant effluent. Mayor: “Someone’s got to do it.” Could be built in 5 yrs for C$30 million

  13. Some roots of the problem • High water use/capita in an uncertain climate. Examples: • No requirements for water-efficient appliances (washing machines, dual flush toilets) • No requirement for swimming pool covers to reduce evaporation

  14. Sydney • Largest city in Australia • Sydney Harbour: picturesque, also a unit of volume in Australia: • 1 Sydney Harbour =0.5 million ML • 70% use is household, 360L/c/d • Recycles 14 billion L/yr treated wastewater

  15. Warragamba Dam • Principal source of Sydney’s water

  16. Reservoir at Warragamba June 2005 • June: <40% full (~1 year’s supply) • Goulburn is in same catchment, so Goulburn extracting river water could affect Sydney • Desalination plant?

  17. Water Corporation of Western Australia • Provide urban water services for entire state (~40% of area of country) • Statewide pricing • Building 1 desalination plant for C$300 million, considering a 2nd • (Considered a 2500km canal also) • First urban end-use study

  18. Checking data • Data not always perfect

  19. Wimmera-Mallee Pipeline(Victoria) • Supplies 5500 farms/>40 towns • Constructing about 8,000km to replace open earthen channel system losing 85% of water to evaporation & seepage • 25% paid by users, Canberra, Victoria, Water Authority • Savings est.: 100,000 ML/yr

  20. Melbourne • Single water services provider split up into a bulk supplier/wastewater treatment agency, 3 competing? retailers/wastewater collectors late 1990’s • 50 year water supply plan in 2000/01?

  21. Planning for the Future of our Water Resources Vision for Melbourne • Predicted to grow significantly – 50 yrs • No new dams in next 50 yrs • Internationally recognised watersmart city • Water demand reduction is most strongly preferred, supported option

  22. Needed to assess demand reduction options Need to understand existing water demandsAnalysis of End Uses: a preferred tool

  23. End-use Analysis Needs information on • Total water use in different subclasses of customers • Water use associated with various existing technologies used by people • Knowledge of numbers (stock) of each type of each existing technology in each subclass • Projections of changes/phasing in of new technologies • Water use associated with future technologies

  24. Purpose: End-use model • Allows modelling changes of stocks of technologies • Facilitates demand management programs

  25. Found no major new supplies needed • New subdivisions to be much more water-efficient • Best available technology • Landscape with native species: water-sensitive urban design • Reuse of water within subdivision (cascading quality) • Demand management of existing customers to provide the small amounts of needed water

  26. Brisbane • Considering full cost water pricing including externalities • 4X plant

  27. National Water Conservation Rating and Labelling Scheme • Started with up to 3 A’s • Standards revised to include more efficient technology • Forced to move to 5 A’s

  28. End

More Related